-
1
-
-
0030678770
-
Integrated maintenance management system in a textile company
-
Tu Y, Yeung EHH (1997) Integrated maintenance management system in a textile company. Int J Adv Manuf Technol 13:453-462
-
(1997)
Int J Adv Manuf Technol
, vol.13
, pp. 453-462
-
-
Tu, Y.1
Yeung, E.H.H.2
-
2
-
-
0034803034
-
An integrated maintenance management system for an advanced manufacturing company
-
Tu Y, Yam R, Tse P, Sun AOW (2001) An integrated maintenance management system for an advanced manufacturing company. Int J Adv Manuf Technol. 17:692-703
-
(2001)
Int J Adv Manuf Technol
, vol.17
, pp. 692-703
-
-
Tu, Y.1
Yam, R.2
Tse, P.3
Sun, A.O.W.4
-
3
-
-
0034813955
-
Intelligent predictive decision, support system for condition-based maintenance
-
Yam R, Tse P, Li L, Tu Y (2001) Intelligent predictive decision, support system for condition-based maintenance. Int J Adv Manuf Technol 17:383-391
-
(2001)
Int J Adv Manuf Technol
, vol.17
, pp. 383-391
-
-
Yam, R.1
Tse, P.2
Li, L.3
Tu, Y.4
-
4
-
-
2342527340
-
Multi-attribute classification method for spare parts inventory management
-
Braglia M, Grassi A, Montanari R (2004) Multi-attribute classification method for spare parts inventory management. J Quai Maint Eng 10:55-65
-
(2004)
J Quai Maint Eng
, vol.10
, pp. 55-65
-
-
Braglia, M.1
Grassi, A.2
Montanari, R.3
-
5
-
-
0000946660
-
METRIC: A multi-echelon, technique for recoverable item, control
-
Sherbrooke CC (1968) METRIC: a multi-echelon, technique for recoverable item, control. Oper Res 16:122-141
-
(1968)
Oper Res
, vol.16
, pp. 122-141
-
-
Sherbrooke, C.C.1
-
7
-
-
0030570073
-
A stocking policy for spare part provisioning under age based preventive replacement
-
Kabir ZABM, Al-Olayan SA (1996) A stocking policy for spare part provisioning under age based preventive replacement. Eur J Oper Res 90:171-181
-
(1996)
Eur J Oper Res
, vol.90
, pp. 171-181
-
-
Kabir, Z.A.B.M.1
Al-Olayan, S.A.2
-
8
-
-
0034249714
-
Optimization of maintenance and spare provisioning policy using simulation
-
Sarker R, Haque A (2000) Optimization of maintenance and spare provisioning policy using simulation. Appl Math Model 24:751-760
-
(2000)
Appl Math Model
, vol.24
, pp. 751-760
-
-
Sarker, R.1
Haque, A.2
-
9
-
-
0033078286
-
Simulation optimization with qualitative variables and structural model changes: A genetic algorithm approach
-
Azadivar F, Tompkins G (1999) Simulation optimization with qualitative variables and structural model changes: a genetic algorithm approach. Eur J Oper Res 113:169-182
-
(1999)
Eur J Oper Res
, vol.113
, pp. 169-182
-
-
Azadivar, F.1
Tompkins, G.2
-
10
-
-
0033737583
-
Production and preventive maintenance rates control for a manufacturing system: An experimental design approach
-
Gharbi A, Kene JP (2000) Production and preventive maintenance rates control for a manufacturing system: an experimental design approach. Int J Prod Econ 65:275-287
-
(2000)
Int J Prod Econ
, vol.65
, pp. 275-287
-
-
Gharbi, A.1
Kene, J.P.2
-
11
-
-
0031176110
-
A systematic approach, to determine the optimal maintenance policy for an automated manufacturing system
-
Chien WT, Lin C, Sphicas G (1997) A systematic approach, to determine the optimal maintenance policy for an automated manufacturing system. Qual Reliab Eng Int 13:225-233
-
(1997)
Qual Reliab Eng Int
, vol.13
, pp. 225-233
-
-
Chien, W.T.1
Lin, C.2
Sphicas, G.3
-
12
-
-
0032115544
-
Evaluating a queuing approximation for the machine interference problem with two types of stoppages via simulation optimization
-
Rossetti MD, Clark G (1998) Evaluating a queuing approximation for the machine interference problem with two types of stoppages via simulation optimization. Comput Ind Eng 34 (3):655-668
-
(1998)
Comput Ind Eng
, vol.34
, Issue.3
, pp. 655-668
-
-
Rossetti, M.D.1
Clark, G.2
-
13
-
-
0026938382
-
Simulation optimization using simulated annealing
-
Haddock J, Mittenthal J (1992) Simulation optimization using simulated annealing. Comput Ind Eng 22(4):387-395
-
(1992)
Comput Ind Eng
, vol.22
, Issue.4
, pp. 387-395
-
-
Haddock, J.1
Mittenthal, J.2
-
14
-
-
22044438294
-
Optimization of continuous-time production planning using hybrid genetic algorithms-simulated annealing
-
Ganesh K, Punniyamoorthy M (2004) Optimization of continuous-time production planning using hybrid genetic algorithms-simulated annealing. Int J Adv Manuf Technol 26: 148-154
-
(2004)
Int J Adv Manuf Technol
, vol.26
, pp. 148-154
-
-
Ganesh, K.1
Punniyamoorthy, M.2
-
15
-
-
5144226254
-
Tabu-search simulation optimization approach for flow-shop scheduling with multiple processors - a case study
-
Yang T, Kuo Y, Chang I (2004) Tabu-search simulation optimization approach for flow-shop scheduling with multiple processors - a case study. Int J Prod Res 42(19):4015-4030
-
(2004)
Int J Prod Res
, vol.42
, Issue.19
, pp. 4015-4030
-
-
Yang, T.1
Kuo, Y.2
Chang, I.3
-
16
-
-
0029195098
-
Applications of genetic algorithm, and simulation to dispatching rule-based FMS scheduling
-
Nagoya, pp
-
Fujimoto H, Tanigawa Y, Yasuda K, Iwahashi K (1995) Applications of genetic algorithm, and simulation to dispatching rule-based FMS scheduling. Proceedings of the IEEE International Conference on Robotics and Automation, Nagoya, pp 190-195
-
(1995)
Proceedings of the IEEE International Conference on Robotics and Automation
, pp. 190-195
-
-
Fujimoto, H.1
Tanigawa, Y.2
Yasuda, K.3
Iwahashi, K.4
-
17
-
-
0032552526
-
A two-stage methodology for short-term batch plant scheduling: Discrete-event simulation and genetic algorithm
-
Azzaro-Pantel C, Bernal-Haro L, Baudet P, Domenech S, Pibouleau L (1998) A two-stage methodology for short-term batch plant scheduling: discrete-event simulation and genetic algorithm. Comput Chem Eng 22(10):1461-1481
-
(1998)
Comput Chem Eng
, vol.22
, Issue.10
, pp. 1461-1481
-
-
Azzaro-Pantel, C.1
Bernal-Haro, L.2
Baudet, P.3
Domenech, S.4
Pibouleau, L.5
-
18
-
-
0035175069
-
Integration of process planning and scheduling using simulation based genetic algorithms
-
Lee H, Kim SS (2001) Integration of process planning and scheduling using simulation based genetic algorithms. Int J Adv Manuf Technol 18:586-590
-
(2001)
Int J Adv Manuf Technol
, vol.18
, pp. 586-590
-
-
Lee, H.1
Kim, S.S.2
-
19
-
-
0034694502
-
Facility layout optimization using simulation, and genetic algorithms
-
Azadivar F, Wang J (2000) Facility layout optimization using simulation, and genetic algorithms. Int J Prod Res 38(17): 4369-4383
-
(2000)
Int J Prod Res
, vol.38
, Issue.17
, pp. 4369-4383
-
-
Azadivar, F.1
Wang, J.2
-
20
-
-
0033887808
-
Optimising an assembly line through simulation augmented by genetic algorithms
-
Lee SG, Khoo LP, Yin XF (2000) Optimising an assembly line through simulation augmented by genetic algorithms. Int J Adv Manuf Technol 16:220-228
-
(2000)
Int J Adv Manuf Technol
, vol.16
, pp. 220-228
-
-
Lee, S.G.1
Khoo, L.P.2
Yin, X.F.3
-
21
-
-
1642477923
-
A simulation, optimization, approach using genetic search for supplier selection
-
USA, pp
-
Ding H, Benyoucef L, Xie X (2003) A simulation, optimization, approach using genetic search for supplier selection. Proceedings of the 2003 Winter Simulation. Conference, USA, pp 1260-1267
-
(2003)
Proceedings of the 2003 Winter Simulation. Conference
, pp. 1260-1267
-
-
Ding, H.1
Benyoucef, L.2
Xie, X.3
-
22
-
-
0036937189
-
Kanban optimization by simulation, and evolution
-
Köchel P, Nielander U (2002) Kanban optimization by simulation, and evolution. Prod Plan. Control 13(8):725-734
-
(2002)
Prod Plan. Control
, vol.13
, Issue.8
, pp. 725-734
-
-
Köchel, P.1
Nielander, U.2
-
24
-
-
3142647369
-
Genetic algorithms for costeffective maintenance of a reactor-generator system
-
Robert TP, Shahabudeen P (2004) Genetic algorithms for costeffective maintenance of a reactor-generator system. Int J Adv Manuf Technol 23:846-856
-
(2004)
Int J Adv Manuf Technol
, vol.23
, pp. 846-856
-
-
Robert, T.P.1
Shahabudeen, P.2
-
25
-
-
0036683331
-
Condition-based maintenance optimization by means of genetic algorithms and Monte Carlo simulation
-
Marsequerra M, Zio E, Podofillini L (2002) Condition-based maintenance optimization by means of genetic algorithms and Monte Carlo simulation. Reliab Eng Syst Safe 77:151-166
-
(2002)
Reliab Eng Syst Safe
, vol.77
, pp. 151-166
-
-
Marsequerra, M.1
Zio, E.2
Podofillini, L.3
-
27
-
-
9444289306
-
Multiobjective spare part allocation, by means of genetic algorithms and Monte Carlo simulation
-
Marsequerra M, Zio E, Podofillini L (2005) Multiobjective spare part allocation, by means of genetic algorithms and Monte Carlo simulation Reliab Eng Syst Safe 87(3):325-335
-
(2005)
Reliab Eng Syst Safe
, vol.87
, Issue.3
, pp. 325-335
-
-
Marsequerra, M.1
Zio, E.2
Podofillini, L.3
-
28
-
-
33846960196
-
The application of genetic algorithm in the development of a preventive maintenance analytical model
-
DOI 10.1007/ s001.70-005-031.4-4
-
Shum YS, Gong DC (2005) The application of genetic algorithm in the development of a preventive maintenance analytical model. Int J Adv Manuf Technol DOI 10.1007/ s001.70-005-031.4-4
-
(2005)
Int J Adv Manuf Technol
-
-
Shum, Y.S.1
Gong, D.C.2
-
34
-
-
1642560618
-
Practical introduction to simulation optimization
-
USA, pp
-
April J, Glover F, Kelly JP, Laguna M (2003) Practical introduction to simulation optimization. Proceedings of the 2003 Winter Simulation Conference, USA, pp 71-78
-
(2003)
Proceedings of the 2003 Winter Simulation Conference
, pp. 71-78
-
-
April, J.1
Glover, F.2
Kelly, J.P.3
Laguna, M.4
-
36
-
-
0032158042
-
Simulation optimization using a genetic algorithm
-
Paul JR, Chanev ST (1998) Simulation optimization using a genetic algorithm. Simul Pract Theory 6:601-611
-
(1998)
Simul Pract Theory
, vol.6
, pp. 601-611
-
-
Paul, J.R.1
Chanev, S.T.2
-
38
-
-
0032287508
-
Evaluating the maintenance process
-
Westerkamp TA (1998) Evaluating the maintenance process. IIE Solut 30(12):22-27
-
(1998)
IIE Solut
, vol.30
, Issue.12
, pp. 22-27
-
-
Westerkamp, T.A.1
-
39
-
-
4344671948
-
Genetic algorithmsimulation methodology for pavement maintenance scheduling
-
Cheu RL, Wang Y, Fwa TF (2004) Genetic algorithmsimulation methodology for pavement maintenance scheduling. Comput-Aided Civ Inf 19:446-455
-
(2004)
Comput-Aided Civ Inf
, vol.19
, pp. 446-455
-
-
Cheu, R.L.1
Wang, Y.2
Fwa, T.F.3
-
40
-
-
0036745339
-
Simulation optimization for earthmoving operations using genetic algorithms
-
Marzouk M, Moselhi O (2002) Simulation optimization for earthmoving operations using genetic algorithms. Constr Manage Econ 20:535-543
-
(2002)
Constr Manage Econ
, vol.20
, pp. 535-543
-
-
Marzouk, M.1
Moselhi, O.2
|