-
1
-
-
12244292489
-
-
White Paper-5 (unpublished), Lean Constr. Inst., Ketchum, ID
-
Ballard, G. (1999). "Work Structuring." White Paper-5 (unpublished), Lean Constr. Inst., Ketchum, ID, available at http://www.leanconstruction.org/.
-
(1999)
Work Structuring
-
-
Ballard, G.1
-
2
-
-
0022130479
-
General contractor's management: How subs evaluate it
-
Birrell, G.S. (1985). "General contractor's management: How subs evaluate it." ASCE, J. Constr. Engrg. and Mgmt., 111(3), 244-259.
-
(1985)
ASCE, J. Constr. Engrg. and Mgmt.
, vol.111
, Issue.3
, pp. 244-259
-
-
Birrell, G.S.1
-
5
-
-
84866136108
-
-
CMG, Camino Medical Group, Mountain View, CA, press release posted on 11/23/2004
-
CMG (2004). "CMG Prepared to Break Ground on Construction upon City Council Approval" Camino Medical Group, Mountain View, CA, press release posted on 11/23/2004 at http://caminomedical.org/news/pressrelease.cfm? EventPage=Press Release-Detail.cfm&release-id=370.
-
(2004)
CMG Prepared to Break Ground on Construction Upon City Council Approval
-
-
-
6
-
-
84866136103
-
-
CMG Document (not dated). Camino Medical Group, Mountain View, CA
-
CMG Document (not dated). Camino Medical Group, Mountain View, CA.
-
-
-
-
7
-
-
0039796998
-
-
A study of the building industry. Tavistock Institute, Tavistock Pubs., London
-
Crichton, C. (1966). Interdependence and uncertainty. A study of the building industry. Tavistock Institute, Tavistock Pubs., London.
-
(1966)
Interdependence and Uncertainty
-
-
Crichton, C.1
-
9
-
-
3242724531
-
Materials and information flows for HVAC ductwork fabrication and site installation
-
17-19 July, held in Brighton, UK
-
Holzemer, M., Tommelein, I.D. and Lin, S.L. (2000). "Materials and Information Flows for HVAC Ductwork Fabrication and Site Installation." Proc. 8th Ann. Conf. of the International Group for Lean Construction (IGLC-8), 17-19 July, held in Brighton, UK.
-
(2000)
Proc. 8th Ann. Conf. of the International Group for Lean Construction (IGLC-8)
-
-
Holzemer, M.1
Tommelein, I.D.2
Lin, S.L.3
-
10
-
-
69949105644
-
Leadership and project management: Time for a shift from fayol to flores
-
Elsinore, Denmark
-
Howell, G., Macomber, H., Koskela, L., and Draper, J. (2004). "Leadership and Project Management: Time for a Shift from Fayol to Flores." Proc. 12th Ann. Conf. of the Int'l. Group for Lean Constr., Elsinore, Denmark.
-
(2004)
Proc. 12th Ann. Conf. of the int'L. Group for Lean Constr.
-
-
Howell, G.1
MacOmber, H.2
Koskela, L.3
Draper, J.4
-
12
-
-
84866126106
-
Case study of the implementation of the lean project delivery system (lpds) using virtual building technologies on a large healthcare project
-
Sydney, Australia. 153-160
-
Khanzode, A., Fischer, M., and Reed, D. (2005). "Case Study of the Implementation of the Lean Project Delivery System (LPDS) using Virtual Building Technologies on a Large Healthcare Project." Proc. 13th Ann. Conf. of the Int'l. Group for Lean Construction, Sydney, Australia. 153-160.
-
(2005)
Proc. 13th Ann. Conf. of the int'L. Group for Lean Construction
-
-
Khanzode, A.1
Fischer, M.2
Reed, D.3
-
13
-
-
13944280292
-
Knowledge and reasoning for MEP coordination
-
Korman, T., Fischer, M., Tatum, C.B. (2003). "Knowledge and Reasoning for MEP Coordination." J. Constr. Engrg. and Mgmt., ASCE, 129 (6), 627-634.
-
(2003)
J. Constr. Engrg. and Mgmt., ASCE
, vol.129
, Issue.6
, pp. 627-634
-
-
Korman, T.1
Fischer, M.2
Tatum, C.B.3
-
14
-
-
33645524390
-
Prototype tool for mechanical, electrical, and plumbing coordination
-
Korman, T. and Tatum, C.B. (2006). "Prototype Tool for Mechanical, Electrical, and Plumbing Coordination." J. Computing in Civ., Engrg.,, ASCE, 20 (1) 38-48.
-
(2006)
J. Computing in Civ., Engrg. ASCE
, vol.20
, Issue.1
, pp. 38-48
-
-
Korman, T.1
Tatum, C.B.2
-
15
-
-
0345356706
-
-
Tech. Report No. 72, CIFE, Stanford Univ., CA, September
-
Koskela, L. (1992). "Application of the New Production Philosophy to the Construction Industry." Tech. Report No. 72, CIFE, Stanford Univ., CA, September, 75 pages.
-
(1992)
Application of the New Production Philosophy to the Construction Industry
, pp. 75
-
-
Koskela, L.1
-
16
-
-
2342421326
-
-
PhD Diss., VTT Pub. 408, VTT Building Technol., Espoo, Finland
-
Koskela, L. (2000). An Exploration towards a Production Theory and its Application to Construction. PhD Diss., VTT Pub. 408, VTT Building Technol., Espoo, Finland. 296 pp.
-
(2000)
An Exploration Towards A Production Theory and Its Application to Construction
, pp. 296
-
-
Koskela, L.1
-
17
-
-
84866083813
-
-
Lean, visited 3/1/07
-
Lean (2007). Definition from http://www.lean.org/WhoWeAre/ NewsArticleDocuments/key-lean- definitions.html visited 3/1/07.
-
(2007)
-
-
-
18
-
-
84995943651
-
Sutter health: Developing a contracting model to support lean project delivery
-
April 2005
-
Lichtig, W.A. (2005). "Sutter Health: Developing a Contracting Model to Support Lean Project Delivery", Lean Construction Journal, April 2005
-
(2005)
Lean Construction Journal
-
-
Lichtig, W.A.1
-
19
-
-
77955340018
-
-
Construction Lawyer, Summer, American Bar Association
-
Lichtig, W.A. (2006). "The Integrated Agreement for Lean Project Delivery." Construction Lawyer, 26 (3) Summer, American Bar Association, 8 pp., available at http://www.mhalaw.com/mha/newsroom/articles/ABA- IntegratedAgmt.pdf.
-
(2006)
The Integrated Agreement for Lean Project Delivery
, vol.26
, Issue.3
, pp. 8
-
-
Lichtig, W.A.1
-
21
-
-
84866136106
-
-
Personal communication during site visit of Camino Medical Project
-
Napier, M. (2006). Personal communication during site visit of Camino Medical Project.
-
(2006)
-
-
Napier, M.1
-
23
-
-
0029470095
-
Patterns of construction-space use in multi-storey buildings
-
Riley, D.R. and Sanvido, V.E. (1995). "Patterns of construction-space use in multi-storey buildings." J. Constr. Engrg. and Mgmt., ASCE, 121(4), 464-473.
-
(1995)
J. Constr. Engrg. and Mgmt., ASCE
, vol.121
, Issue.4
, pp. 464-473
-
-
Riley, D.R.1
Sanvido, V.E.2
-
24
-
-
0031362303
-
Space planning for mechanical, electrical, plumbing, and fire protection trades in multi-story building construction
-
Anderson, S. (ed.)
-
Riley, D. and Sanvido, V. (1997). "Space planning for mechanical, electrical, plumbing, and fire protection trades in multi-story building construction." Anderson, S. (ed.), Proc. Constr. Congr. V, ASCE, 102-109.
-
(1997)
Proc. Constr. Congr. V, ASCE
, pp. 102-109
-
-
Riley, D.1
Sanvido, V.2
-
26
-
-
77953590300
-
-
QV System, Inc.
-
Tanaka, T. (2005). "Quickening the Pace of New Product Development." QV System, Inc., 9 pp., available at http://www.toyota- engineering.co.jp/Quickening%20the%20pace%20of%20New%20Product%20Development-3. pdf
-
(2005)
Quickening the Pace of New Product Development
, pp. 9
-
-
Tanaka, T.1
-
28
-
-
0034545205
-
Coordinating building systems: Process and knowledge
-
Tatum, C.B. and Korman, T. (2005). "Coordinating Building Systems: Process and Knowledge." J. Arch. Engrg., ASCE, 6 (4), 116-121
-
(2005)
J. Arch. Engrg., ASCE
, vol.6
, Issue.4
, pp. 116-121
-
-
Tatum, C.B.1
Korman, T.2
-
29
-
-
0006802258
-
-
Tech. Rep. 97-8, Constr. Engrg. and Mgmt. Program, Civ. and Envir. Engrg. Dept., Univ. of Calif., Berkeley, CA
-
Tommelein, I.D., and Ballard, G. (1997). "Coordinating specialists." Tech. Rep. 97-8, Constr. Engrg. and Mgmt. Program, Civ. and Envir. Engrg. Dept., Univ. of Calif., Berkeley, CA.
-
(1997)
Coordinating Specialists
-
-
Tommelein, I.D.1
Ballard, G.2
-
30
-
-
0032645520
-
Parade game: Impact of work flow variability on trade performance
-
Tommelein, I.D., Riley, D., and Howell, G. (1999). "Parade Game: Impact of Work Flow Variability on Trade Performance." J. Constr. Engrg. and Mgmt., ASCE, 125(5), 304-310.
-
(1999)
J. Constr. Engrg. and Mgmt., ASCE
, vol.125
, Issue.5
, pp. 304-310
-
-
Tommelein, I.D.1
Riley, D.2
Howell, G.3
-
31
-
-
84866136107
-
Work structuring in lean construction: Case study of assembled-to-order light fixtures
-
in review
-
Tsao, C.C.Y. and Tommelein, I.D. (2007). "Work Structuring in Lean Construction: Case Study of Assembled-to-Order Light Fixtures." J. of Constr. Engrg. and Mgmt., ASCE, in review.
-
(2007)
J. of Constr. Engrg. and Mgmt., ASCE
-
-
Tsao, C.C.Y.1
Tommelein, I.D.2
-
32
-
-
13944269909
-
Work structuring to achieve integrated product-process design
-
Tsao, C.C.Y., Tommelein, I.D., Swanlund, E., and Howell, G.A. (2004). "Work Structuring to Achieve Integrated Product-Process Design." J. of Constr. Engrg. and Mgmt., ASCE, 130 (6) 780-789.
-
(2004)
J. of Constr. Engrg. and Mgmt., ASCE
, vol.130
, Issue.6
, pp. 780-789
-
-
Tsao, C.C.Y.1
Tommelein, I.D.2
Swanlund, E.3
Howell, G.A.4
|