메뉴 건너뛰기




Volumn 14, Issue PART 1, 2012, Pages 728-733

An approach for the integration of a scheduling system and a multi-agent manufacturing execution system. Towards a collaborative framework

Author keywords

Constraint satisfaction problems; Manufacturing systems; Multi agent systems; Scheduling execution

Indexed keywords

COMPUTER PROGRAMMING; CONSTRAINT SATISFACTION PROBLEMS; CONSTRAINT THEORY; ECONOMIC AND SOCIAL EFFECTS; MANUFACTURE; SCHEDULING; UNCERTAINTY ANALYSIS;

EID: 84866072487     PISSN: 14746670     EISSN: None     Source Type: Conference Proceeding    
DOI: 10.3182/20120523-3-RO-2023.00156     Document Type: Conference Paper
Times cited : (32)

References (22)
  • 2
    • 5144232431 scopus 로고    scopus 로고
    • Executing production schedules in the face of uncertainties: A review and some future directions
    • Aytug, H., Lawley, M., McKay, K., Mohan, S., and Uzsoy, R., (2005). Executing production schedules in the face of uncertainties: A review and some future directions. Europ. J. Oper. Res., 161, 86-110.
    • (2005) Europ. J. Oper. Res. , vol.161 , pp. 86-110
    • Aytug, H.1    Lawley, M.2    McKay, K.3    Mohan, S.4    Uzsoy, R.5
  • 4
    • 33748920331 scopus 로고    scopus 로고
    • Integrated production and material handling scheduling using mathematical programming and constraint programming
    • El Khayat, G., Langevin, A., and Riopel, D. (2006). Integrated production and material handling scheduling using mathematical programming and constraint programming. Europ. J. Oper. Res., 175, 1818-1832.
    • (2006) Europ. J. Oper. Res. , vol.175 , pp. 1818-1832
    • El Khayat, G.1    Langevin, A.2    Riopel, D.3
  • 5
    • 76949109331 scopus 로고    scopus 로고
    • Architecture of manufacturing scheduling systems: Literature review and an integrated proposal
    • Framinan, J.M. and Ruiz, R. (2010). Architecture of manufacturing scheduling systems: Literature review and an integrated proposal. Europ. J. Oper. Res, 205, 237-246.
    • (2010) Europ. J. Oper. Res , vol.205 , pp. 237-246
    • Framinan, J.M.1    Ruiz, R.2
  • 6
    • 33745796546 scopus 로고    scopus 로고
    • A study of system nervousness in multi-agent manufacturing control system
    • S.A. Brueckner et al. (Eds.) LNAI 3910 Springer
    • Hadeli, Valckenaers P., Verstraete P., Saint Germain B., and Van Brussel H. (2006). A study of system nervousness in multi-agent manufacturing control system, S.A. Brueckner et al. (Eds.): ESOA 2005, LNAI 3910, 232-243, Springer.
    • (2006) ESOA 2005 , pp. 232-243
    • Hadeli, V.P.1    Verstraete, P.2    Saint Germain, B.3    Van Brussel, H.4
  • 7
    • 71749084824 scopus 로고    scopus 로고
    • Integration of scheduling and control - Theory or practice?
    • Harjunkoski, I., Nyström, R., and Horch, A. (2008). Integration of scheduling and control - Theory or practice? Comput. Chem. Eng., 33, 1909-1918.
    • (2008) Comput. Chem. Eng. , vol.33 , pp. 1909-1918
    • Harjunkoski, I.1    Nyström, R.2    Horch, A.3
  • 8
    • 77649309259 scopus 로고    scopus 로고
    • Production scheduling in the process industries: Current trends, emerging challenges and opportunities
    • Rita de Brito Alves et al. (Eds.) Elsevier Science
    • Henning, G. (2009). Production scheduling in the process industries: Current trends, emerging challenges and opportunities, Rita de Brito Alves et al. (Eds.). Comp. Aided Chem. Eng., 27 Part A, 23-28. Elsevier Science.
    • (2009) Comp. Aided Chem. Eng. , vol.27 , Issue.PART A , pp. 23-28
    • Henning, G.1
  • 11
    • 57249089354 scopus 로고    scopus 로고
    • Costs for rescheduling actions: A critical issue for reducing the gap between scheduling theory and practice
    • Kopanos, G. M., Capón-García, E., Espuña, A., and Puigjaner, L. (2008). Costs for rescheduling actions: a critical issue for reducing the gap between scheduling theory and practice. Ind. Eng. Chem. Res., 47, 8785-8795.
    • (2008) Ind. Eng. Chem. Res. , vol.47 , pp. 8785-8795
    • Kopanos, G.M.1    Capón-García, E.2    Espuña, A.3    Puigjaner, L.4
  • 12
    • 30544441225 scopus 로고    scopus 로고
    • ADACOR: A holonic architecture for agile and adaptive manufacturing control
    • Leitão, P. and Restivo, F. (2006). ADACOR: A holonic architecture for agile and adaptive manufacturing control. Comput. Ind., 57, 121-130.
    • (2006) Comput. Ind. , vol.57 , pp. 121-130
    • Leitão, P.1    Restivo, F.2
  • 13
    • 44649183271 scopus 로고    scopus 로고
    • A holonic approach to dynamic manufacturing scheduling
    • Leitão, P. and Restivo, F. (2008). A holonic approach to dynamic manufacturing scheduling. Rob. Comput. Integr. Manuf., 24, 625-634.
    • (2008) Rob. Comput. Integr. Manuf. , vol.24 , pp. 625-634
    • Leitão, P.1    Restivo, F.2
  • 14
    • 77957922318 scopus 로고    scopus 로고
    • Reactive scheduling framework based on domain knowledge and constraint programming
    • Novas, J.M. and Henning, P.G. (2010). Reactive scheduling framework based on domain knowledge and constraint programming. Comput. Chem. Eng., 34, 2129-2148.
    • (2010) Comput. Chem. Eng. , vol.34 , pp. 2129-2148
    • Novas, J.M.1    Henning, P.G.2
  • 15
    • 84861578980 scopus 로고    scopus 로고
    • A comprehensive constraint programming approach for the rolling horizon-based scheduling of automated wet-etch stations
    • Juan M. Novas, Gabriela P. Henning In Press, doi: 10.1016/j.compchemeng. 2012.01.005
    • Novas, J.M. and Henning, P.G. (2012). A comprehensive constraint programming approach for the rolling horizon-based scheduling of automated wet-etch stations, Juan M. Novas, Gabriela P. Henning., Comput. Chem. Eng., In Press, DOI: 10.1016/j.compchemeng.2012.01.005.
    • (2012) Comput. Chem. Eng.
    • Novas, J.M.1    Henning, P.G.2
  • 16
    • 1442285828 scopus 로고    scopus 로고
    • Dynamic rescheduling that simultaneously considers efficiency and stability
    • Rangsaritratsamee, R., Ferrell, Jr. W.G., and Kurz, M.B. (2004). Dynamic rescheduling that simultaneously considers efficiency and stability. Comput. Ind. Eng., 46, 1-15.
    • (2004) Comput. Ind. Eng. , vol.46 , pp. 1-15
    • Rangsaritratsamee, R.1    Ferrell Jr., W.G.2    Kurz, M.B.3
  • 17
    • 33747170366 scopus 로고    scopus 로고
    • Emergent short-term forecasting through ant colony engineering in coordination and control systems
    • Valckenaers, P., Hadeli, K., Saint Germain, B., Verstraete, P., Van Brussel, H. (2006). Emergent short-term forecasting through ant colony engineering in coordination and control systems. Adv. Eng. Inf., 20 (3), 261-278.
    • (2006) Adv. Eng. Inf. , vol.20 , Issue.3 , pp. 261-278
    • Valckenaers, P.1    Hadeli, K.2    Saint Germain, B.3    Verstraete, P.4    Van Brussel, H.5
  • 22
    • 80052831360 scopus 로고    scopus 로고
    • A CP formulation for scheduling multiproduct multistage batch plants
    • Zeballos, L.J., Novas, J.M., and Henning, P.G. (2011). A CP formulation for scheduling multiproduct multistage batch plants. Comput. Chem. Eng., 35, 2973-2989.
    • (2011) Comput. Chem. Eng. , vol.35 , pp. 2973-2989
    • Zeballos, L.J.1    Novas, J.M.2    Henning, P.G.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.