메뉴 건너뛰기




Volumn 12, Issue 3, 2012, Pages

Stability-oriented optimization of train platforming problem on high speed railway

Author keywords

Ant colony optimization; High speed railway; Railway transportation; Stability; Train platforming problem

Indexed keywords

ANT COLONIES; ANT COLONY OPTIMIZATION (ACO); HIGH-SPEED RAILWAYS; INTEGER PROGRAMMING MODELS; RAILWAY STATIONS; RAILWAY TRANSPORTATION; RESOURCE COSTS; RESOURCE UTILIZATIONS; SOLUTION ALGORITHMS; SOLUTION APPROACH; TRAIN PLATFORMING PROBLEM; TRAIN SCHEDULE;

EID: 84865301683     PISSN: 10096744     EISSN: None     Source Type: Journal    
DOI: 10.1016/s1570-6672(11)60208-0     Document Type: Article
Times cited : (13)

References (10)
  • 1
    • 0037410793 scopus 로고    scopus 로고
    • An integrated dispatching model for rail yards operations
    • He Shiwei, Song Rui, Chaudhry Sohail S. An integrated dispatching model for rail yards operations[J]. Computers & Operations Research, 2003, 30: 939-966.
    • (2003) Computers & Operations Research , vol.30 , pp. 939-966
    • He, S.1    Song, R.2    Chaudhry, S.S.3
  • 2
    • 33745153933 scopus 로고    scopus 로고
    • Scheduling model and algorithm of using up-and-down lines on railway marshalling station
    • LI W Q, WANG W, CHENG S H. Scheduling model and algorithm of using up-and-down lines on railway marshalling station[J]. Systems Engineering-Theory & Practice, 2000, 6: 75-78.
    • (2000) Systems Engineering-Theory & Practice , vol.6 , pp. 75-78
    • Li, W.Q.1    Wang, W.2    Cheng, S.H.3
  • 5
    • 77952642121 scopus 로고    scopus 로고
    • Optimization model and algorithm for routing passenger trains through a railway station
    • CHEN Y, SHI F, QIN J, et al. Optimization model and algorithm for routing passenger trains through a railway station[J]. China Railway Science, 2010, 31(2): 101-107.
    • (2010) China Railway Science , vol.31 , Issue.2 , pp. 101-107
    • Chen, Y.1    Shi, F.2    Qin, J.3
  • 6
    • 72449138654 scopus 로고    scopus 로고
    • Comprehensive optimization of arrival-departure track utilization and inbound-outbound route assignment in railway passenger station
    • SHI F, CHEN Y, QIN J, et al. Comprehensive optimization of arrival-departure track utilization and inbound-outbound route assignment in railway passenger station[J]. China Railway Science, 2009, 30(6): 108-113.
    • (2009) China Railway Science , vol.30 , Issue.6 , pp. 108-113
    • Shi, F.1    Chen, Y.2    Qin, J.3
  • 7
    • 0037355373 scopus 로고    scopus 로고
    • Scheduling and platforming trains at busy complex stations
    • M Carey, Carville Sinead. Scheduling and platforming trains at busy complex stations[J]. Transportation Research Part A, 2003, 37: 195-224.
    • (2003) Transportation Research Part A , vol.37 , pp. 195-224
    • Carey, M.1    Sinead, C.2
  • 8
    • 84864817202 scopus 로고    scopus 로고
    • Route allocation problem and buffer times at large-scale passenger rail stations
    • Beijing: Beijing Jiaotong University
    • JIA W Z. Route allocation problem and buffer times at large-scale passenger rail stations[D]. Beijing: Beijing Jiaotong University, 2010.
    • (2010)
    • Jia, W.Z.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.