메뉴 건너뛰기




Volumn 31, Issue 2, 2010, Pages 101-107

Optimization model and algorithm for routing passenger trains through a railway station

Author keywords

Arrival departure track utilization; Inbound outbound routing; Routing trains through a railway station; Simulation annealing algorithm

Indexed keywords

A-TRAIN; BINARY LINEAR PROGRAM; DEPARTURE TRACK; OPTIMIZATION MODELS; OPTIMIZATION PROBLEMS; PASSENGER STATION; PASSENGER TRAIN; PRACTICAL PROBLEMS; RAILWAY STATIONS; REASONABILITY; SIMULATION ANNEALING ALGORITHM; TRAIN DIAGRAM;

EID: 77952642121     PISSN: 10014632     EISSN: None     Source Type: Journal    
DOI: None     Document Type: Article
Times cited : (18)

References (9)
  • 1
    • 4444239301 scopus 로고    scopus 로고
    • Optimization methods for arranging train routes in station bottleneck
    • in Chinese
    • Shi Feng, Xie Chunong, Yu Guifang. Optimization methods for arranging train routes in station bottleneck [J]. Journal of the China Railway Society, 2004, 26(4): 5-9. in Chinese.
    • (2004) Journal of the China Railway Society , vol.26 , Issue.4 , pp. 5-9
    • Shi, F.1    Xie, C.2    Yu, G.3
  • 2
    • 0036939881 scopus 로고    scopus 로고
    • A study of network optimization model and algorithm for carrying capacity of station throat
    • in Chinese
    • Liu Lan, Wang Nan, Du Wen. A study of network optimization model and algorithm for carrying capacity of station throat [J]. Journal of the China Railway Society, 2002, 24(6): 1-5. in Chinese.
    • (2002) Journal of the China Railway Society , vol.24 , Issue.6 , pp. 1-5
    • Liu, L.1    Wang, N.2    Du, W.3
  • 3
    • 36249025248 scopus 로고    scopus 로고
    • Research on model and algorithm of routing schedules for railway stations
    • in Chinese
    • Long Jiancheng, Gao Ziyou, Ma Jianjun, et al. Research on model and algorithm of routing schedules for railway stations [J]. Journal of the China Railway Society, 2007, 29(5): 6-13. in Chinese.
    • (2007) Journal of the China Railway Society , vol.29 , Issue.5 , pp. 6-13
    • Long, J.1    Gao, Z.2    Ma, J.3
  • 4
    • 33745153933 scopus 로고    scopus 로고
    • Scheduling model and algorithm of using up-and-down lines on railway marshalling station
    • in Chinese
    • Li Wenquan, Wang Wei, Cheng Shihui. Scheduling model and algorithm of using up-and-down lines on railway marshalling station [J]. Systems Engineering-Theory and Practice, 2000, 20(6): 75-78. in Chinese.
    • (2000) Systems Engineering-Theory and Practice , vol.20 , Issue.6 , pp. 75-78
    • Li, W.1    Wang, W.2    Cheng, S.3
  • 5
    • 72449164008 scopus 로고    scopus 로고
    • The optimal algorithms of using arrival and departure lines in district stations
    • in Chinese
    • Xu Jie, Du Wen, Li Bing. The optimal algorithms of using arrival and departure lines in district stations [J]. Systems Engineering-Theory Methodology Applications, 2003, 12(3): 253-256. in Chinese.
    • (2003) Systems Engineering-Theory Methodology Applications , vol.12 , Issue.3 , pp. 253-256
    • Xu, J.1    Du, W.2    Li, B.3
  • 6
    • 10944257514 scopus 로고    scopus 로고
    • Optimization research for utilization of arrival and departure tracks in railroad passenger station
    • in Chinese
    • Xie Chunong, Li Xinhua. Optimization research for utilization of arrival and departure tracks in railroad passenger station [J]. China Railway Science, 2004, 25(5): 130-133. in Chinese.
    • (2004) China Railway Science , vol.25 , Issue.5 , pp. 130-133
    • Xie, C.1    Li, X.2
  • 7
    • 44249109086 scopus 로고    scopus 로고
    • Method of arrival and departure tracks utilization plan in railroad passenger station based on ant colony algorithm
    • in Chinese
    • Lü Hongxia, He Dake, Chen Tao. Method of arrival and departure tracks utilization plan in railroad passenger station based on ant colony algorithm [J]. Journal of Southwest Jiaotong University, 2008, 43(2): 153-158. in Chinese.
    • (2008) Journal of Southwest Jiaotong University , vol.43 , Issue.2 , pp. 153-158
    • Lü, H.1    He, D.2    Chen, T.3
  • 9
    • 72449138654 scopus 로고    scopus 로고
    • Comprehensive optimization of arrival-departure track utilization and inbound-outbound route assignment in railway passenger station
    • in Chinese
    • Shi Feng, Chen Yan, Qin Jin, et al. Comprehensive optimization of arrival-departure track utilization and inbound-outbound route assignment in railway passenger station [J]. China Railway Science, 2009, 30(6): 108-113. in Chinese.
    • (2009) China Railway Science , vol.30 , Issue.6 , pp. 108-113
    • Shi, F.1    Chen, Y.2    Qin, J.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.