메뉴 건너뛰기




Volumn 30, Issue 6, 2009, Pages 108-113

Comprehensive optimization of arrival-departure track utilization and inbound-outbound route assignment in railway passenger station

Author keywords

Arrival departure track utilization; Railway passenger station; Route assignment; Simulated annealing algorithm

Indexed keywords

BINARY LINEAR PROGRAM; DEPARTURE TRACK; OPTIMIZATION PROBLEMS; PASSENGER STATION; PRACTICAL PROBLEMS; RAILWAY STATIONS; REASONABILITY; ROUTE PLAN; SECOND OPTIMIZATION; SIMULATED ANNEALING ALGORITHMS; SMALL SCALE; TRAIN DIAGRAM;

EID: 72449138654     PISSN: 10014632     EISSN: None     Source Type: Journal    
DOI: None     Document Type: Article
Times cited : (28)

References (13)
  • 1
    • 4444239301 scopus 로고    scopus 로고
    • Optimization methods for arranging train routes in station bottleneck
    • Chinese source
    • SHI Feng, XIE Chunong, YU Guifang. Optimization Methods for Arranging Train Routes in Station Bottleneck[J]. Journal of the China Railway Society, 2004, 26(4): 5-9. (in Chinese)
    • (2004) Journal of the China Railway Society , vol.26 , Issue.4 , pp. 5-9
    • Shi, F.1    Xie, C.2    Yue, F.3
  • 2
    • 0036939881 scopus 로고    scopus 로고
    • A study of network optimization model and algorithm for carrying capacity of station throat
    • Chinese source
    • LIU Lan, WANG Nan, DU Wen. A Study of Network Optimization Model and Algorithm for Carrying Capacity of Station Throat[J]. Journal of the China Railway Society, 2002, 24(6): 1-5. (in Chinese)
    • (2002) Journal of the China Railway Society , vol.24 , Issue.6 , pp. 1-5
    • Liu, L.1    Wang, N.2    Du, W.3
  • 3
    • 72449148240 scopus 로고    scopus 로고
    • Research on immune evolutionary algorithm for routing schedule in railway station
    • Chinese source. Beijing: Beijing Jiaotong University
    • LI Yinghui. Research on Immune Evolutionary Algorithm for Routing Schedule in Railway Station[D]. Beijing: Beijing Jiaotong University, 2006. (in Chinese)
    • (2006)
    • Li, Y.1
  • 4
    • 36249025248 scopus 로고    scopus 로고
    • Research on model and algorithm of routing schedules for railway stations
    • Chinese source
    • LONG Jiancheng, GAO Ziyou, MA Jianjun, et al. Research on Model and Algorithm of Routing Schedules for Railway Stations[J]. Journal of the China Railway Society, 2007, 29(5): 6-13. (in Chinese)
    • (2007) Journal of the China Railway Society , vol.29 , Issue.5 , pp. 6-13
    • Long, J.1    Gao, Z.2    Ma, J.3
  • 5
    • 33745147001 scopus 로고    scopus 로고
    • The study on DSS of the technical station dispatching-rationally utilizing reception and departure siding
    • Chinese source
    • LÜ Hongxia, NI Shaoquan, JI Hongye. The Study on DSS of the Technical Station Dispatching-Rationally Utilizing Reception and Departure Siding[J]. Journal of Southwest Jiaotong University, 2000, 35(3): 255-258. (in Chinese)
    • (2000) Journal of Southwest Jiaotong University , vol.35 , Issue.3 , pp. 255-258
    • Lü, H.1    Ni, S.2    Ji, H.3
  • 6
    • 33745153933 scopus 로고    scopus 로고
    • Scheduling model and algorithm of using up-and-down lines on railway marshalling station
    • Chinese source
    • LI Wenquan, WANG Wei, CHENG Shihui. Scheduling Model and Algorithm of Using Up-and-Down Lines on Railway Marshalling Station[J]. Systems Engineering-Theory and Practice, 2000, 20(6): 75-78. (in Chinese)
    • (2000) Systems Engineering-Theory and Practice , vol.20 , Issue.6 , pp. 75-78
    • Li, W.1    Wang, W.2    Cheng, S.3
  • 7
    • 72449164008 scopus 로고    scopus 로고
    • The optimal algorithms of using arrival and departure lines in district stations
    • Chinese source
    • XU Jie, DU Wen, LI Bing. The Optimal Algorithms of Using Arrival and Departure Lines in District Stations[J]. Systems Engineering-Theory Methodology Applications, 2003, 12(3): 253-256. (in Chinese)
    • (2003) Systems Engineering-Theory Methodology Applications , vol.12 , Issue.3 , pp. 253-256
    • Xu, J.1    Du, W.2    Li, B.3
  • 8
    • 10944257514 scopus 로고    scopus 로고
    • Optimization research for utilization of arrival and departure tracks in railroad passenger station
    • Chinese source
    • XIE Chunong, LI Xinhua. Optimization Research for Utilization of Arrival and Departure Tracks in Railroad Passenger Station[J]. China Railway Science, 2004, 25(5): 130-133. (in Chinese)
    • (2004) China Railway Science , vol.25 , Issue.5 , pp. 130-133
    • Xie, C.1    Li, X.2
  • 9
    • 44249109086 scopus 로고    scopus 로고
    • Method of arrival and departure tracks utilization plan in railroad passenger station based on ant colony algorithm
    • Chinese source
    • LÜ Hongxia, HE Dake, CHEN Tao. Method of Arrival and Departure Tracks Utilization Plan in Railroad Passenger Station Based on Ant Colony Algorithm[J]. Journal of Southwest Jiaotong University, 2008, 43(2): 153-158. (in Chinese)
    • (2008) Journal of Southwest Jiaotong University , vol.43 , Issue.2 , pp. 153-158
    • Lü, H.1    He, D.2    Chen, T.3
  • 11
    • 0041001940 scopus 로고    scopus 로고
    • Railway planning-routing of trains and allocation of passenger lines
    • Rotterdam: Erasmus University Rotterdam
    • ZWANEVELD P J. Railway Planning-Routing of Trains and Allocation of Passenger Lines[D]. Rotterdam: Erasmus University Rotterdam, 1997.
    • (1997)
    • Zwaneveld, P.J.1
  • 12
    • 0030212718 scopus 로고    scopus 로고
    • Routing trains through railway stations: Model formulation and algorithms
    • ZWANEVELD P J, DAUZERE-PERES S, HOESEL C P M V, et al. Routing Trains through Railway Stations: Model Formulation and Algorithms[J]. Transportation Science, 1996, 30(3): 181-194.
    • (1996) Transportation Science , vol.30 , Issue.3 , pp. 181-194
    • Zwaneveld, P.J.1    Dauzere-Peres, S.2    Hoesel, C.P.M.V.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.