Volumn 44, Issue 9, 2012, Pages 1021-1034

Parallel machine scheduling problem with ready times, due times and sequence-dependent setup times using meta-heuristic algorithms

Author keywords

meta heuristic; parallel machine scheduling; sequence dependent setup times

Indexed keywords

ALLOCATION POLICIES; DELAY TIME; IN-DEPTH ANALYSIS; META HEURISTIC ALGORITHM; META HEURISTICS; METAHEURISTIC; OPTIMAL SOLUTIONS; PARALLEL MACHINE SCHEDULING; PARALLEL MACHINE-SCHEDULING PROBLEMS; PROBLEM SIZE; SCHEDULING POLICIES; SEQUENCE-DEPENDENT SETUP TIME; SET-UP TIME; WEIGHTED SUM;

EID: 84865255913     PISSN: 0305215X     EISSN: 10290273     Source Type: Journal    
DOI: 10.1080/0305215X.2011.628388     Document Type: Article
Times cited : (19)

References (21)
  • 1
    • 64449088021 scopus 로고    scopus 로고
    • Parallel-machine scheduling problems with sequence-dependent setup times using an ACO, SA and VNS hybrid algorithm
    • Behnamian, J., Zandieh M. and Ghomi, F., 2009. Parallel-machine scheduling problems with sequence-dependent setup times using an ACO, SA and VNS hybrid algorithm. Expert Systems with Applications, 36, 9637-9644.
    • (2009) Expert Systems with Applications , vol.36 , pp. 9637-9644
    • Behnamian, J.1    Zandieh, M.2    Ghomi, F.3
  • 2
    • 0028462998 scopus 로고
    • The impact of sequence dependent setup time on job shop scheduling performance
    • Bobrowski, P.M. and Kim, S. C., 1994. The impact of sequence dependent setup time on job shop scheduling performance. International Journal of Production Research, 32, 1503-1520.
    • (1994) International Journal of Production Research , vol.32 , pp. 1503-1520
    • Bobrowski, P.M.1    Kim, S.C.2
  • 3
    • 0031340781 scopus 로고    scopus 로고
    • Parallel machine scheduling problems using memetic algorithms
    • Cheng, R. and Gen, M., 2000. Parallel machine scheduling problems using memetic algorithms. Computers & Industrial Engineering, 33 (3-4), 761-764.
    • (2000) Computers & Industrial Engineering , vol.33 , Issue.3-4 , pp. 761-764
    • Cheng, R.1    Gen, M.2
  • 4
    • 79958031546 scopus 로고    scopus 로고
    • Variable neighborhood search approaches for scheduling jobs on parallel machines with sequence-dependent setup times, precedence constraints, and ready times
    • Driessel, R. and Monch, L. (online) 2010. Variable neighborhood search approaches for scheduling jobs on parallel machines with sequence-dependent setup times, precedence constraints, and ready times. Computers & Industrial Engineering, 61 (2), 336-345.
    • (2010) Computers & Industrial Engineering , vol.61 , Issue.2 , pp. 336-345
    • Driessel, R.1    Monch, L.2
  • 5
    • 0023576978 scopus 로고
    • The effects of setup time on output capacity in cellular manufacturing
    • Flynn, B.B., 1987. The effects of setup time on output capacity in cellular manufacturing. International Journal of Production Research, 25, 1761-1772.
    • (1987) International Journal of Production Research , vol.25 , pp. 1761-1772
    • Flynn, B.B.1
  • 9
    • 63449108993 scopus 로고    scopus 로고
    • A fuzzy-mixed-integer goal programming mode for a parallel-machine scheduling problem with sequence-dependent setup times and release dates
    • Gharehgozli, A. H., Tavakkoli-Moghaddam, R. and Zaerpour, N., 2009. A fuzzy-mixed-integer goal programming mode for a parallel-machine scheduling problem with sequence-dependent setup times and release dates. Robotics and Computer-Integrated Manufacturing, 25, 853-859.
    • (2009) Robotics and Computer-Integrated Manufacturing , vol.25 , pp. 853-859
    • Gharehgozli, A.H.1    Tavakkoli-Moghaddam, R.2    Zaerpour, N.3
  • 10
    • 0002687992 scopus 로고
    • Impact of the setup variable on capacity and inventory decisions
    • Hahn, C.K., Bragg, D.J., and Shin, D.W., 1989. Impact of the setup variable on capacity and inventory decisions. Academic Management Review, 13, 91-103.
    • (1989) Academic Management Review , vol.13 , pp. 91-103
    • Hahn, C.K.1    Bragg, D.J.2    Shin, D.W.3
  • 12
    • 34047130624 scopus 로고    scopus 로고
    • Scheduling unrelated parallel machines with sequence-dependent setups
    • DOI 10.1016/j.cor.2006.02.006, PII S0305054806000438
    • Logendran, R., Mcdonell, B., and Smucker, B., 2007. Scheduling unrelated parallel machines with sequence-dependent setups. Computers & Operations Research, 11, 3420-3438. (Pubitemid 46517865)
    • (2007) Computers and Operations Research , vol.34 , Issue.11 , pp. 3420-3438
    • Logendran, R.1    McDonell, B.2    Smucker, B.3
  • 13
    • 0036507571 scopus 로고    scopus 로고
    • Comparing meta-heuristic approaches for parallel machine scheduling problems
    • DOI 10.1080/09537280110069649
    • Mendes,A.S., Muller, F.M., Franca, P.M. and Moscato, P., 2002. Comparing metaheuristic approaches for parallel machine scheduling problems. Production Planning and Control, 13, 143-154. (Pubitemid 34586391)
    • (2002) Production Planning and Control , vol.13 , Issue.2 , pp. 143-154
    • Mendes, A.S.1    Muller, F.M.2    Franca, P.M.3    Moscato, P.4
  • 17
    • 34147190027 scopus 로고    scopus 로고
    • Solving parallel machines scheduling problems with sequence-dependent setup times using variable neighbourhood search
    • DOI 10.1093/imaman/dpm016
    • Rocha, M., Gomez Ravetti, M., Mateus, G.R. and Pardalos, P.M., 2007. Solving parallel machines scheduling problems with sequence-dependent setup times using variable neighborhood search. IMA Journal of Management Mathematics, 18, 101-115. (Pubitemid 46552838)
    • (2007) IMA Journal Management Mathematics , vol.18 , Issue.2 , pp. 101-115
    • De Paula, M.R.1    Ravetti, M.G.2    Mateus, G.R.3    Pardalos, P.M.4
  • 18
    • 0035975715 scopus 로고    scopus 로고
    • A heuristic algorithm for minimizing mean flow time with unit setups
    • DOI 10.1016/S0020-0190(01)00136-3, PII S0020019001001363
    • Sveltana, A., Kravchenko, S. andWerner, F., 2001.A heuristic algorithm for minimizing mean flow time with unit setups. Information Processing Letters, 79, 291-296. (Pubitemid 32771127)
    • (2001) Information Processing Letters , vol.79 , Issue.6 , pp. 291-296
    • Kravchenko, S.A.1    Werner, F.2
  • 19
    • 27644553525 scopus 로고    scopus 로고
    • A linear programming approach for identical parallel machine scheduling with job splitting and sequence-dependent setup times
    • DOI 10.1016/j.ijpe.2004.12.007, PII S0925527304004529, Control and Management of Productive Systems
    • Tahar, D.N., Yalaoui, F., Chu, C. and Amodeo, L., 2006. A linear programming approach for identical parallel machine scheduling with job splitting and sequence-dependent setup times. International Journal of Production Economics, 99, 63-73. (Pubitemid 41550211)
    • (2006) International Journal of Production Economics , vol.99 , Issue.1-2 , pp. 63-73
    • Nait Tahar, D.1    Yalaoui, F.2    Chu, C.3    Amodeo, L.4
  • 20
    • 67349221528 scopus 로고    scopus 로고
    • Design of a genetic algorithm for biobjective unrelated parallel machines scheduling with sequence-dependent setup times and precedence constraints
    • Tavakkoli-Moghaddam, R., Taheri, F., Bazzazi, M., Izadi, M. and Sassani, F., 2009. Design of a genetic algorithm for biobjective unrelated parallel machines scheduling with sequence-dependent setup times and precedence constraints. Computers & Operations Research, 36, 3224-3230.
    • (2009) Computers & Operations Research , vol.36 , pp. 3224-3230
    • Tavakkoli-Moghaddam, R.1    Taheri, F.2    Bazzazi, M.3    Izadi, M.4    Sassani, F.5
  • 21
    • 0037321475 scopus 로고    scopus 로고
    • An efficient heuristic approach for parallel machine scheduling with job splitting and sequence-dependent setup times
    • Yalaoui, F. and Chu, C., 2003. An efficient heuristic approach for parallel machine scheduling with job splitting and sequence-dependent setup times. IIE Transactions, 35 (2), 183-190.
    • (2003) IIE Transactions , vol.35 , Issue.2 , pp. 183-190
    • Yalaoui, F.1    Chu, C.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.