-
1
-
-
84964407908
-
A prototype of feature-based design for assembly
-
T. L. De Fazio, A. C. Edsall, and R. E. Gustavson, "A prototype of feature-based design for assembly," in Proc. Comput.-Aided Cooperative Product Development MIT-JSME Workshop, 1991, pp. 369-392.
-
(1991)
Proc. Comput.-aided Cooperative Product Development MIT-JSME Workshop
, pp. 369-392
-
-
De Fazio, T.L.1
Edsall, A.C.2
Gustavson, R.E.3
-
2
-
-
0026992581
-
Design for assembly and disassembly
-
G. Boothroyd and L. Alting, "Design for assembly and disassembly," CIRP Ann.-Manuf. Technol., vol. 41, no. 2, pp. 625-636, 1992.
-
(1992)
CIRP Ann.-manuf. Technol.
, vol.41
, Issue.2
, pp. 625-636
-
-
Boothroyd, G.1
Alting, L.2
-
3
-
-
57149135707
-
Current status of reconfigurable assembly systems
-
Z. Bi, L. Wang, and S. Lang, "Current status of reconfigurable assembly systems," Int. J. Manuf. Res., vol. 2, no. 3, pp. 303-328, 2007.
-
(2007)
Int. J. Manuf. Res.
, vol.2
, Issue.3
, pp. 303-328
-
-
Bi, Z.1
Wang, L.2
Lang, S.3
-
4
-
-
60949086409
-
Assembly process planning and its future in collaborative manufacturing: A review
-
L. Wang, S. Keshavarzmanesh, H.-Y. Feng, and R. O. Buchal, "Assembly process planning and its future in collaborative manufacturing: A review," Int. J. Adv. Manuf. Technol., vol. 41, no. 1-2, pp. 132-144, 2009.
-
(2009)
Int. J. Adv. Manuf. Technol.
, vol.41
, Issue.1-2
, pp. 132-144
-
-
Wang, L.1
Keshavarzmanesh, S.2
Feng, H.-Y.3
Buchal, R.O.4
-
5
-
-
81255151151
-
Enterprise systems: State-of-the-art and future trends
-
Nov.
-
L. Xu, "Enterprise systems: State-of-the-art and future trends," IEEE Trans. Ind. Informat., vol. 7, no. 4, pp. 630-640, Nov. 2011.
-
(2011)
IEEE Trans. Ind. Informat.
, vol.7
, Issue.4
, pp. 630-640
-
-
Xu, L.1
-
7
-
-
27744545003
-
Network-integrated manufacturing system
-
B. Dan, L. Li, X. Zhang, F. Guo, and J. Zhou, "Network-integrated manufacturing system," Int. J. Prod. Res., vol. 43, no. 12, pp. 2631-2647, 2005.
-
(2005)
Int. J. Prod. Res.
, vol.43
, Issue.12
, pp. 2631-2647
-
-
Dan, B.1
Li, L.2
Zhang, X.3
Guo, F.4
Zhou, J.5
-
8
-
-
27944434873
-
ERP research, development and implementation in China: An overview
-
C. Wang, L. Xu, X. Liu, and X. Qin, "ERP research, development and implementation in china: An overview," Int. J. Prod. Res., vol. 43, no. 18, pp. 3915-3932, 2005.
-
(2005)
Int. J. Prod. Res.
, vol.43
, Issue.18
, pp. 3915-3932
-
-
Wang, C.1
Xu, L.2
Liu, X.3
Qin, X.4
-
9
-
-
34347331078
-
Conceptual design of remote monitoring and fault diagnosis systems
-
C. Wang, L. Xu, and W. Peng, "Conceptual design of remote monitoring and fault diagnosis systems," Inform. Syst., vol. 32, pp. 996-1004, 2007.
-
(2007)
Inform. Syst.
, vol.32
, pp. 996-1004
-
-
Wang, C.1
Xu, L.2
Peng, W.3
-
10
-
-
33845699282
-
A decision support system for product design in concurrent engineering
-
L. Xu, Z. Li, S. Li, and F. Tang, "A decision support system for product design in concurrent engineering," Decision Support Syst., vol. 42, no. 4, pp. 2029-2042, 2007.
-
(2007)
Decision Support Syst.
, vol.42
, Issue.4
, pp. 2029-2042
-
-
Xu, L.1
Li, Z.2
Li, S.3
Tang, F.4
-
11
-
-
0035422272
-
An objected-oriented intelligent design tool to aid the design of manufacturing systems
-
S. Feng, L. Li, and L. Cen, "An objected-oriented intelligent design tool to aid the design of manufacturing systems," Knowledge-Based Syst., vol. 14, pp. 225-232, 2001.
-
(2001)
Knowledge-based Syst.
, vol.14
, pp. 225-232
-
-
Feng, S.1
Li, L.2
Cen, L.3
-
12
-
-
52949084687
-
Parameter mapping and data transformation for engineering application integration
-
C. Wang and L. Xu, "Parameter mapping and data transformation for engineering application integration," Inform. Syst. Frontiers, vol. 10, no. 5, pp. 589-600, 2008.
-
(2008)
Inform. Syst. Frontiers
, vol.10
, Issue.5
, pp. 589-600
-
-
Wang, C.1
Xu, L.2
-
13
-
-
33847778381
-
A framework for CAD- and sensor-based robotic coating automation
-
Feb.
-
Z. M. Bi and S. Y. T. Lang, "A framework for CAD- and sensor-based robotic coating automation," IEEE Trans. Ind. Informat., vol. 3, no. 1, pp. 84-91, Feb. 2007.
-
(2007)
IEEE Trans. Ind. Informat.
, vol.3
, Issue.1
, pp. 84-91
-
-
Bi, Z.M.1
Lang, S.Y.T.2
-
14
-
-
69249218873
-
A real-time service-oriented architecture for industrial automation
-
Aug.
-
T. Cucinotta, A. Mancina, G. F. Anastasi, G. Lipari, L. Mangeruca, R. Checcozzo, and F. Rusina, "A real-time service-oriented architecture for industrial automation," IEEE Trans. Ind. Informat., vol. 5, no. 3, pp. 267-277, Aug. 2009.
-
(2009)
IEEE Trans. Ind. Informat.
, vol.5
, Issue.3
, pp. 267-277
-
-
Cucinotta, T.1
Mancina, A.2
Anastasi, G.F.3
Lipari, G.4
Mangeruca, L.5
Checcozzo, R.6
Rusina, F.7
-
15
-
-
84864558157
-
-
Airbus' Nightmare
-
M. Duvall and D. Bartholomew, PLM: Boeing's Dream, Airbus' Nightmare, 2007. [Online]. Available: www.tgstech.com/releases/Boeings-Dream- AirbusNightmare.pdf,
-
(2007)
PLM: Boeing's Dream
-
-
Duvall, M.1
Bartholomew, D.2
-
16
-
-
57149128194
-
Design of adaptive function blocks for dynamic assembly planning and control
-
L. Wang, S. Keshavarzmanesh, and H.-Y. Feng, "Design of adaptive function blocks for dynamic assembly planning and control," J. Manuf. Syst., vol. 27, no. 1, pp. 45-51, 2008.
-
(2008)
J. Manuf. Syst.
, vol.27
, Issue.1
, pp. 45-51
-
-
Wang, L.1
Keshavarzmanesh, S.2
Feng, H.-Y.3
-
17
-
-
79960536567
-
A function block based approach for increasing adaptability of assembly planning and control
-
L. Wang, S. Keshavarzmanesh, and H.-Y. Feng, "A function block based approach for increasing adaptability of assembly planning and control," Int. J. Prod. Res., vol. 49, no. 16, pp. 4903-4924, 2011.
-
(2011)
Int. J. Prod. Res.
, vol.49
, Issue.16
, pp. 4903-4924
-
-
Wang, L.1
Keshavarzmanesh, S.2
Feng, H.-Y.3
-
18
-
-
77955542703
-
A methodology toward manufacturing grid-based virtual enterprise operation platform
-
W. Tan, Y. Xu, W. Xu, L. Xu, X. Zhao, L. Wang, and L. Fu, "A methodology toward manufacturing grid-based virtual enterprise operation platform," Enterprise Inform. Syst., vol. 4, no. 3, pp. 283-309, 2010.
-
(2010)
Enterprise Inform. Syst.
, vol.4
, Issue.3
, pp. 283-309
-
-
Tan, W.1
Xu, Y.2
Xu, W.3
Xu, L.4
Zhao, X.5
Wang, L.6
Fu, L.7
-
19
-
-
79960329074
-
Reconfigurable manufacturing execution system for pipe cutting
-
Y. H. Yin and J. Y. Xie, "Reconfigurable manufacturing execution system for pipe cutting," Enterprise Inform. Syst., vol. 5, no. 3, pp. 287-299, 2011.
-
(2011)
Enterprise Inform. Syst.
, vol.5
, Issue.3
, pp. 287-299
-
-
Yin, Y.H.1
Xie, J.Y.2
-
20
-
-
81255149280
-
Functional analysis of manufacturing execution system distribution
-
Nov.
-
Bratukhin and T. Sauter, "Functional analysis of manufacturing execution system distribution," IEEE Trans. Ind. Informat., vol. 7, no. 4, pp. 740-749, Nov. 2011.
-
(2011)
IEEE Trans. Ind. Informat.
, vol.7
, Issue.4
, pp. 740-749
-
-
Bratukhin1
Sauter, T.2
-
22
-
-
77952009223
-
Inspiring innovative design integration by collaborative exploration of boolean operations
-
May
-
Y. Zheng, H. Shen, and C. Sun, "Inspiring innovative design integration by collaborative exploration of boolean operations," IEEE Trans. Ind. Informat., vol. 6, no. 2, pp. 243-250, May 2010.
-
(2010)
IEEE Trans. Ind. Informat.
, vol.6
, Issue.2
, pp. 243-250
-
-
Zheng, Y.1
Shen, H.2
Sun, C.3
-
23
-
-
77949492632
-
Systems integration and collaboration in architecture, engineering, construction, and facilities management: A review
-
W. Shen, Q. Hao, H. Mak, J. Neelamkavil, H. Xie, J. Dickinson, R. Thomas, A. Pardasani, and H. Xue, "Systems integration and collaboration in architecture, engineering, construction, and facilities management: A review," Adv. Eng. Inform., vol. 24, no. 2, pp. 196-207, 2010.
-
(2010)
Adv. Eng. Inform.
, vol.24
, Issue.2
, pp. 196-207
-
-
Shen, W.1
Hao, Q.2
Mak, H.3
Neelamkavil, J.4
Xie, H.5
Dickinson, J.6
Thomas, R.7
Pardasani, A.8
Xue, H.9
-
24
-
-
0037405237
-
Polychromatic sets and its application in simulating complex objects and systems
-
Z. Li and L. Xu, "Polychromatic sets and its application in simulating complex objects and systems," Comput. Oper. Res., vol. 30, no. 6, pp. 851-860, 2003.
-
(2003)
Comput. Oper. Res.
, vol.30
, Issue.6
, pp. 851-860
-
-
Li, Z.1
Xu, L.2
-
25
-
-
79960311064
-
A new method for automatic synthesis of tolerances for complex assemblies based on polychromatic sets
-
Y. Zhang, Z. Li, L. Xu, and J. Wang, "A new method for automatic synthesis of tolerances for complex assemblies based on polychromatic sets," Enterprise Inform. Syst., vol. 5, no. 3, pp. 337-358, 2011.
-
(2011)
Enterprise Inform. Syst.
, vol.5
, Issue.3
, pp. 337-358
-
-
Zhang, Y.1
Li, Z.2
Xu, L.3
Wang, J.4
-
26
-
-
14044262546
-
Physically based modeling in virtual assembly
-
Y. Wang, S. Jayaram, U. Jayaram, K. Lyons, and P. Hart, "Physically based modeling in virtual assembly," Int. J. Virtual Reality, vol. 5, no. I, pp. 1-14, 2001.
-
(2001)
Int. J. Virtual Reality
, vol.5
, Issue.1
, pp. 1-14
-
-
Wang, Y.1
Jayaram, S.2
Jayaram, U.3
Lyons, K.4
Hart, P.5
-
27
-
-
0035781031
-
Intelligent assembly modeling and simulation
-
S. K. Gupta, C. J. Paredis, R. Sinha, and P. F. Brown, "Intelligent assembly modeling and simulation," Assembly Autom., vol. 21, no. 3, pp. 215-235, 2001.
-
(2001)
Assembly Autom.
, vol.21
, Issue.3
, pp. 215-235
-
-
Gupta, S.K.1
Paredis, C.J.2
Sinha, R.3
Brown, P.F.4
-
28
-
-
2342442877
-
Collaborative assembly planning system under web environment
-
J. Wang, J. Liu, and Y. Zhong, "Collaborative assembly planning system under web environment," Comput. Integr. Manuf. Syst., vol. 10, no. 1, pp. 83-88, 2004.
-
(2004)
Comput. Integr. Manuf. Syst.
, vol.10
, Issue.1
, pp. 83-88
-
-
Wang, J.1
Liu, J.2
Zhong, Y.3
-
29
-
-
0032629397
-
Feature-based assembly modeling and sequence generation
-
T.-H. Eng, Z.-K. Lin, W. Olson, and C. McLean, "Feature-based assembly modeling and sequence generation," Comput. Ind. Eng., vol. 36, pp. 17-33, 1999.
-
(1999)
Comput. Ind. Eng.
, vol.36
, pp. 17-33
-
-
Eng, T.-H.1
Lin, Z.-K.2
Olson, W.3
McLean, C.4
-
31
-
-
77953784150
-
Key technologies of network collaborative digital preassembly system
-
F. Nan, H. Wang, and C. Hao, "Key technologies of network collaborative digital preassembly system," Comput. Integr. Manuf. Syst., vol. 16, no. 4, pp. 724-730, 2010.
-
(2010)
Comput. Integr. Manuf. Syst.
, vol.16
, Issue.4
, pp. 724-730
-
-
Nan, F.1
Wang, H.2
Hao, C.3
-
32
-
-
84864548657
-
Task-level assembly modeling in virtual environments
-
Springer 2003
-
J. Bernhard, "Task-level assembly modeling in virtual environments," in Computational Science and Its Applications - ICCSA.: Springer, 2003, vol. 2669, pp. 988-988, 2003.
-
(2003)
Computational Science and its Applications - ICCSA
, vol.2669
, pp. 988-988
-
-
Bernhard, J.1
-
34
-
-
79959287244
-
Study and applicationonobject-oriented aero-engine assembly models
-
C. Wang, H. Yu, W. Zhang, and J. Yu, "Study and applicationonobject- oriented aero-engine assembly models," Comput. Integr. Manuf. Syst., vol. 16, no. 5, pp. 943-949, 2010.
-
(2010)
Comput. Integr. Manuf. Syst.
, vol.16
, Issue.5
, pp. 943-949
-
-
Wang, C.1
Yu, H.2
Zhang, W.3
Yu, J.4
-
35
-
-
77951428664
-
Automatic acquiring method for assembly relation matrix of complex product
-
J. Yu, C. Wang, and W. Zhang, "Automatic acquiring method for assembly relation matrix of complex product," Comput. Integr. Manuf. Syst., vol. 16, no. 2, pp. 249-255, 2010.
-
(2010)
Comput. Integr. Manuf. Syst.
, vol.16
, Issue.2
, pp. 249-255
-
-
Yu, J.1
Wang, C.2
Zhang, W.3
-
36
-
-
73949155897
-
Generation of optimized assembly sequences based on priority rules screening
-
J. Yu, C. Wang, H. Yu, and W. Zhang, "Generation of optimized assembly sequences based on priority rules screening," Appl. Mech. Mater., vol. 16, no. 19, pp. 130-134, 2009.
-
(2009)
Appl. Mech. Mater.
, vol.16
, Issue.19
, pp. 130-134
-
-
Yu, J.1
Wang, C.2
Yu, H.3
Zhang, W.4
-
37
-
-
77950353285
-
Assembly sequence planning based on particle swarm optimization algorithm for complex product
-
H. Yu, C. Wang, J. Yu, and H. Yuan, "Assembly sequence planning based on particle swarm optimization algorithm for complex product," J. Northeastern Univ., vol. 31, no. 2, pp. 261-264, 2010.
-
(2010)
J. Northeastern Univ.
, vol.31
, Issue.2
, pp. 261-264
-
-
Yu, H.1
Wang, C.2
Yu, J.3
Yuan, H.4
-
38
-
-
71949128309
-
Modeling of the method of product assembly sequence evaluation
-
J. Zhang, C. Wang, M. Ma, and W. Zhang, "Modeling of the method of product assembly sequence evaluation," J. Mech. Eng., vol. 45, no. 11, pp. 218-224, 2009.
-
(2009)
J. Mech. Eng.
, vol.45
, Issue.11
, pp. 218-224
-
-
Zhang, J.1
Wang, C.2
Ma, M.3
Zhang, W.4
-
39
-
-
78650369396
-
Automatic acquiring method for exploded view based on assembly sequence planning
-
J. Yu, C. Wang, and W. Zhang, "Automatic acquiring method for exploded view based on assembly sequence planning," J. Mech. Eng., vol. 46, no. 21, pp. 149-157, 2010.
-
(2010)
J. Mech. Eng.
, vol.46
, Issue.21
, pp. 149-157
-
-
Yu, J.1
Wang, C.2
Zhang, W.3
-
40
-
-
80051780804
-
Energy-efficient coverage of wireless sensor networks using ant colony optimization with three types of pheromones
-
Aug.
-
J. Lee, B. Choi, and J. Lee, "Energy-efficient coverage of wireless sensor networks using ant colony optimization with three types of pheromones," IEEE Trans. Ind. Informat., vol. 7, no. 3, pp. 419-427, Aug. 2011.
-
(2011)
IEEE Trans. Ind. Informat.
, vol.7
, Issue.3
, pp. 419-427
-
-
Lee, J.1
Choi, B.2
Lee, J.3
-
41
-
-
80051784648
-
A theoretical development and analysis of jumping gene genetic algorithm
-
Aug.
-
K. Tang, R. Ying, S. Kwong, K. Ng, and K. Man, "A theoretical development and analysis of jumping gene genetic algorithm," IEEE Trans. Ind. Informat., vol. 7, no. 3, pp. 408-418, Aug. 2011.
-
(2011)
IEEE Trans. Ind. Informat.
, vol.7
, Issue.3
, pp. 408-418
-
-
Tang, K.1
Ying, R.2
Kwong, S.3
Ng, K.4
Man, K.5
-
42
-
-
59049090820
-
Resource service composition and its optimal-selection based on particle swarm optimization in manufacturing grid system
-
Nov.
-
F. Tao, D. Zhao, Y. Hu, and Z. Zhou, "Resource service composition and its optimal-selection based on particle swarm optimization in manufacturing grid system," IEEE Trans. Ind. Informat., vol. 4, no. 4, pp. 315-327, Nov. 2008.
-
(2008)
IEEE Trans. Ind. Informat.
, vol.4
, Issue.4
, pp. 315-327
-
-
Tao, F.1
Zhao, D.2
Hu, Y.3
Zhou, Z.4
-
43
-
-
79951576392
-
Modeling of a liquid epoxy molding process using a particle swarm optimization-based fuzzy regression approach
-
Feb.
-
K. Chan, T. Dillon, and C. Kwong, "Modeling of a liquid epoxy molding process using a particle swarm optimization-based fuzzy regression approach," IEEE Trans. Ind. Informat., vol. 7, no. 1, pp. 148-158, Feb. 2011.
-
(2011)
IEEE Trans. Ind. Informat.
, vol.7
, Issue.1
, pp. 148-158
-
-
Chan, K.1
Dillon, T.2
Kwong, C.3
-
44
-
-
79957902459
-
A decision support system for substage-zoning filling design of rock-fill dams based on particle swarm optimization
-
L. Wang, J. Zeng, and L. Xu, "A decision support system for substage-zoning filling design of rock-fill dams based on particle swarm optimization," Inform. Technol. Manage., vol. 12, no. 2, pp. 111-119, 2011.
-
(2011)
Inform. Technol. Manage.
, vol.12
, Issue.2
, pp. 111-119
-
-
Wang, L.1
Zeng, J.2
Xu, L.3
-
45
-
-
79960055957
-
Editorial: Inaugural issue
-
L. Xu, "Editorial: Inaugural issue," Enterprise Inform. Syst., vol. 1, no. 1, pp. 1-2, 2007.
-
(2007)
Enterprise Inform. Syst.
, vol.1
, Issue.1
, pp. 1-2
-
-
Xu, L.1
-
46
-
-
79960304814
-
Development of an integrated medical supply information system
-
E. Xu, M. Wermus, and D. Bauman, "Development of an integrated medical supply information system," Enterprise Inform. Syst., vol. 5, no. 3, pp. 385-399, 2011.
-
(2011)
Enterprise Inform. Syst.
, vol.5
, Issue.3
, pp. 385-399
-
-
Xu, E.1
Wermus, M.2
Bauman, D.3
|