-
1
-
-
0035422272
-
An object-oriented intelligent design tool to aid the design of manufacturing systems
-
Feng, S., Li, L. and Cen, L., An object-oriented intelligent design tool to aid the design of manufacturing systems. Knowledge-based Sys., 2001, 14, 225-232.
-
(2001)
Knowledge-based Sys.
, vol.14
, pp. 225-232
-
-
Feng, S.1
Li, L.2
Cen, L.3
-
2
-
-
0037405170
-
Using MLP approach to design a production scheduling system
-
Feng, S., Li, L. and Cen, L., Using MLP approach to design a production scheduling system. Comput. Oper. Res., 2003, 30, 821-832.
-
(2003)
Comput. Oper. Res.
, vol.30
, pp. 821-832
-
-
Feng, S.1
Li, L.2
Cen, L.3
-
3
-
-
0026112946
-
Embedding JIT into MRP
-
Flapper, S., Miltenburg, G. and Wijngaard, J., Embedding JIT into MRP. Int. J. Prod. Res., 1991, 29, 329-341.
-
(1991)
Int. J. Prod. Res.
, vol.29
, pp. 329-341
-
-
Flapper, S.1
Miltenburg, G.2
Wijngaard, J.3
-
4
-
-
0026850761
-
Computer-aided production management in China
-
Gan, R. and Zhang, J., Computer-aided production management in China. Comput. Ind., 1992, 19, 113-117.
-
(1992)
Comput. Ind.
, vol.19
, pp. 113-117
-
-
Gan, R.1
Zhang, J.2
-
5
-
-
0442296110
-
A production scheduling algorithm for cost optimization
-
in Chinese
-
Hu, S., Xu, X. and Zhan, D., A production scheduling algorithm for cost optimization. Comput.-Integr. Manuf. Sys., 2003, 9, 735-739 [in Chinese].
-
(2003)
Comput.-Integr. Manuf. Sys.
, vol.9
, pp. 735-739
-
-
Hu, S.1
Xu, X.2
Zhan, D.3
-
6
-
-
0036485711
-
A practical algorithm for network plan and control
-
in Chinese
-
Jiang, S., Xu, X. and Li, Q., A practical algorithm for network plan and control. Comput.-Integr. Manuf. Sys., 2002, 8, 141-145 [in Chinese].
-
(2002)
Comput.-Integr. Manuf. Sys.
, vol.8
, pp. 141-145
-
-
Jiang, S.1
Xu, X.2
Li, Q.3
-
7
-
-
0031101669
-
Measurement of instability in multi-level MRP systems
-
Kadipasaoglu, S. and Sridharan, S., Measurement of instability in multi-level MRP systems. Int. J. Prod. Res., 1997, 35, 713-737.
-
(1997)
Int. J. Prod. Res.
, vol.35
, pp. 713-737
-
-
Kadipasaoglu, S.1
Sridharan, S.2
-
8
-
-
27944442916
-
Study on the architecture of flexible enterprise resource planning system based-on multi-agent
-
in Chinese
-
Li, G. and Sun, L., Study on the architecture of flexible enterprise resource planning system based-on multi-agent. Comput. Eng., 2002, 28, 42-44 [in Chinese].
-
(2002)
Comput. Eng.
, vol.28
, pp. 42-44
-
-
Li, G.1
Sun, L.2
-
9
-
-
0034148012
-
Integrating systems concepts into manufacturing information systems
-
Li, H. and Li, L., Integrating systems concepts into manufacturing information systems. Sys. Res. Behav. Sci., 2000, 17, 135-147.
-
(2000)
Sys. Res. Behav. Sci.
, vol.17
, pp. 135-147
-
-
Li, H.1
Li, L.2
-
10
-
-
0033749166
-
A production rescheduling expert simulation system
-
Li, H., Li, S., Li, L. and Hu, B., A production rescheduling expert simulation system. Eur. J. Oper. Res., 2000, 124, 64-74.
-
(2000)
Eur. J. Oper. Res.
, vol.124
, pp. 64-74
-
-
Li, H.1
Li, S.2
Li, L.3
Hu, B.4
-
11
-
-
3543104308
-
An analysis of the sources of competitiveness and performance of Chinese manufacturers
-
Li, L., An analysis of the sources of competitiveness and performance of Chinese manufacturers. Int. J. Oper. Prod. Manag., 2000a, 20, 299-315.
-
(2000)
Int. J. Oper. Prod. Manag.
, vol.20
, pp. 299-315
-
-
Li, L.1
-
12
-
-
0035737811
-
An evaluation of acquiring and implementing a manufacturing resource planning system
-
Li, L., Chaudhry, S., Chaudhry, P. and Wang, Y., An evaluation of acquiring and implementing a manufacturing resource planning system. Prod. Invent. Manag. J., 2001, 42, 1-8.
-
(2001)
Prod. Invent. Manag. J.
, vol.42
, pp. 1-8
-
-
Li, L.1
Chaudhry, S.2
Chaudhry, P.3
Wang, Y.4
-
13
-
-
0012385858
-
Manufacturing capability development in a changing business environment
-
Li, L., Manufacturing capability development in a changing business environment. Ind. Manag. Data Sys., 2000b, 100, 261-270.
-
(2000)
Ind. Manag. Data Sys.
, vol.100
, pp. 261-270
-
-
Li, L.1
-
14
-
-
0033324219
-
Proposing an architectural framework of hybrid knowledge-based system for production rescheduling
-
Li, L., Proposing an architectural framework of hybrid knowledge-based system for production rescheduling. Expert Sys., 1999, 16, 273-279.
-
(1999)
Expert Sys.
, vol.16
, pp. 273-279
-
-
Li, L.1
-
15
-
-
0041633584
-
A study on refinery production planning based on multi-objective optimization approach
-
in Chinese
-
Liao, G., Yang, Y. and Lu, D., A study on refinery production planning based on multi-objective optimization approach. Acta Petroleum Sinica, 2003, 19, 39-43 [in Chinese].
-
(2003)
Acta Petroleum Sinica
, vol.19
, pp. 39-43
-
-
Liao, G.1
Yang, Y.2
Lu, D.3
-
16
-
-
84975889770
-
A paradigm for ERP and BPR integration
-
Ng, J., Ip, W. and Lee, T., A paradigm for ERP and BPR integration. Int. J. Prod. Res., 1999, 3, 2093-2108.
-
(1999)
Int. J. Prod. Res.
, vol.3
, pp. 2093-2108
-
-
Ng, J.1
Ip, W.2
Lee, T.3
-
17
-
-
0020834246
-
The design of a microcomputer-based net change MRP system
-
Regan, S., Harhen, J., Browne, J. and O'Kelly, M., The design of a microcomputer-based net change MRP system. Comput. Ind., 1983, 4, 243-252.
-
(1983)
Comput. Ind.
, vol.4
, pp. 243-252
-
-
Regan, S.1
Harhen, J.2
Browne, J.3
O'Kelly, M.4
-
18
-
-
2642516976
-
National differences and ERP implementation: Issues and challenges
-
Sheu, C., Chae, B. and Yang, C., National differences and ERP implementation: issues and challenges. Omega, 2004, 32, 361-371.
-
(2004)
Omega
, vol.32
, pp. 361-371
-
-
Sheu, C.1
Chae, B.2
Yang, C.3
-
19
-
-
0035396173
-
Implementation of remote robot manufacturing over Internet
-
Wang, C., Chu, C. and Yin, C., Implementation of remote robot manufacturing over Internet. Comput. Ind., 2001, 45, 215-229.
-
(2001)
Comput. Ind.
, vol.45
, pp. 215-229
-
-
Wang, C.1
Chu, C.2
Yin, C.3
-
20
-
-
8844258256
-
A comprehensive framework for selecting an ERP system
-
Wei, C. and Wang, M., A comprehensive framework for selecting an ERP system. Int. J. Project Manag., 2004, 22, 161-169.
-
(2004)
Int. J. Project Manag.
, vol.22
, pp. 161-169
-
-
Wei, C.1
Wang, M.2
-
21
-
-
80053475730
-
An examination of ERP user satisfaction in Taiwan
-
Wu, J., Wang, Y., Chien, M. and Tai, W., An examination of ERP user satisfaction in Taiwan, in Proceedings of the 35th Hawaii International Conference on Systems Sciences, 2002.
-
(2002)
Proceedings of the 35th Hawaii International Conference on Systems Sciences
-
-
Wu, J.1
Wang, Y.2
Chien, M.3
Tai, W.4
-
22
-
-
0034344595
-
The contribution of systems science to information systems research
-
Xu, L., The contribution of systems science to information systems research. Sys. Res. Behav. Sci., 2000, 17, 105-116.
-
(2000)
Sys. Res. Behav. Sci.
, vol.17
, pp. 105-116
-
-
Xu, L.1
-
23
-
-
27944480968
-
Enhancing integrated business decisions using ERP systems in a supply chain environment for competitive advantages
-
Chinese Academy of Sciences
-
Xu, L., Li, L. and Rubin, B., Enhancing integrated business decisions using ERP systems in a supply chain environment for competitive advantages, in Proceedings of the Shenyang Symposium on Advanced Manufacturing, Chinese Academy of Sciences, 2003.
-
(2003)
Proceedings of the Shenyang Symposium on Advanced Manufacturing
-
-
Xu, L.1
Li, L.2
Rubin, B.3
-
24
-
-
27944440628
-
A study of production planning optimization in a petrochemical corporation
-
in Chinese
-
Xu, B. and Tian, G., A study of production planning optimization in a petrochemical corporation. Ind. Eng. Manag., 2002, 5, 58-61 [in Chinese].
-
(2002)
Ind. Eng. Manag.
, vol.5
, pp. 58-61
-
-
Xu, B.1
Tian, G.2
-
25
-
-
0004622157
-
Progress in the journey developing SB-CIMS
-
Xue, J., Wang, C. and Mu, R., Progress in the journey developing SB-CIMS. Comput.-Integr. Manuf., 1994, 7, 242-248.
-
(1994)
Comput.-Integr. Manuf.
, vol.7
, pp. 242-248
-
-
Xue, J.1
Wang, C.2
Mu, R.3
-
26
-
-
1542502359
-
Research on framework of ERP system with double control from time and cost
-
in Chinese
-
Zhan, D. and Xu, X., Research on framework of ERP system with double control from time and cost. Comput.-Integr. Manuf. Sys., 2002, 8, 635-639 [in Chinese].
-
(2002)
Comput.-Integr. Manuf. Sys.
, vol.8
, pp. 635-639
-
-
Zhan, D.1
Xu, X.2
-
27
-
-
0037144806
-
A study of manufacturing resources planning (MRPII) implementation in China
-
Zhao, X., Lai, F. and Young, S., A study of manufacturing resources planning (MRPII) implementation in China. Int. J. Prod. Res., 2002, 40, 3461-3478.
-
(2002)
Int. J. Prod. Res.
, vol.40
, pp. 3461-3478
-
-
Zhao, X.1
Lai, F.2
Young, S.3
|