1
-
-
13444254192
-
A bi-objective model for robust resource-constrained project scheduling
-
Al-Fanzine M. A., Haouari M.: A bi-objective model for robust resource-constrained project scheduling. Int. J. Prod. Econ. 96, 175-187 (2005).
-
(2005)
Int. J. Prod. Econ.
, vol.96
, pp. 175-187
-
-
Al-Fanzine, M.A.1
Haouari, M.2
-
2
-
-
0035314168
-
An application of fuzzy goal programming to a multiobjective project network problem
-
Arikan F., Gungor Z.: An application of fuzzy goal programming to a multiobjective project network problem. Fuzzy Sets Syst. 119, 49-58 (2001).
-
(2001)
Fuzzy Sets Syst.
, vol.119
, pp. 49-58
-
-
Arikan, F.1
Gungor, Z.2
-
3
-
-
0346636333
-
Decision-making in a fuzzy environment
-
Bellman R. E., Zadeh L. A.: Decision-making in a fuzzy environment. Manag. Sci. 7, 141-164 (1970).
-
(1970)
Manag. Sci.
, vol.7
, pp. 141-164
-
-
Bellman, R.E.1
Zadeh, L.A.2
-
4
-
-
45549116094
-
Possibilistic linear programming with triangular fuzzy numbers
-
Buckley J. J.: Possibilistic linear programming with triangular fuzzy numbers. Fuzzy Sets Syst. 26, 135-138 (1988).
-
(1988)
Fuzzy Sets Syst.
, vol.26
, pp. 135-138
-
-
Buckley, J.J.1
-
5
-
-
38249018815
-
Stochastic versus possibilistic programming
-
Buckley J. J.: Stochastic versus possibilistic programming. Fuzzy Sets Syst. 34, 43-59 (1990).
-
(1990)
Fuzzy Sets Syst.
, vol.34
, pp. 43-59
-
-
Buckley, J.J.1
-
6
-
-
0002146440
-
The use of fuzzy variable in PERT
-
Chanas S., Kamburowsi J.: The use of fuzzy variable in PERT. Fuzzy Sets Syst. 5, 11-19 (1981).
-
(1981)
Fuzzy Sets Syst.
, vol.5
, pp. 11-19
-
-
Chanas, S.1
Kamburowsi, J.2
-
7
-
-
0035885517
-
Critical path analysis in the network with fuzzy activity times
-
Chanas S., Zieliński P.: Critical path analysis in the network with fuzzy activity times. Fuzzy Sets Syst. 122, 195-204 (2001).
-
(2001)
Fuzzy Sets Syst.
, vol.122
, pp. 195-204
-
-
Chanas, S.1
Zieliński, P.2
-
8
-
-
0029482986
-
An efficient approach for large project planning based on fuzzy Delphi method
-
Chang I. S., Tsujimuta Y., Gen M., Tozawa T.: An efficient approach for large project planning based on fuzzy Delphi method. Fuzzy Sets Syst. 76, 277-288 (1995).
-
(1995)
Fuzzy Sets Syst.
, vol.76
, pp. 277-288
-
-
Chang, I.S.1
Tsujimuta, Y.2
Gen, M.3
Tozawa, T.4
-
9
-
-
29344452896
-
Order-fulfillment ability analysis in the supply-chain system with fuzzy operation times
-
Chen C. T., Huang S. F.: Order-fulfillment ability analysis in the supply-chain system with fuzzy operation times. Int. J. Prod. Econ. 101, 185-193 (2006).
-
(2006)
Int. J. Prod. Econ.
, vol.101
, pp. 185-193
-
-
Chen, C.T.1
Huang, S.F.2
-
10
-
-
0016498438
-
A comparison of heuristic and optimum solutions in resource-constrained project scheduling
-
Davis E. W., Patterson J. H.: A comparison of heuristic and optimum solutions in resource-constrained project scheduling. Manag. Sci. 21, 944-955 (1975).
-
(1975)
Manag. Sci.
, vol.21
, pp. 944-955
-
-
Davis, E.W.1
Patterson, J.H.2
-
11
-
-
0025671729
-
Optimization of project network problem with goal programming and fuzzy linear programming
-
DePorter E. L., Ellis K. P.: Optimization of project network problem with goal programming and fuzzy linear programming. Comput. Indus. Eng. 19, 500-504 (1990).
-
(1990)
Comput. Indus. Eng.
, vol.19
, pp. 500-504
-
-
Deporter, E.L.1
Ellis, K.P.2
-
13
-
-
0030575225
-
Refinements of the maximin approach to decision-making in a fuzzy environment
-
Dubois D., Fargier H., Prade H.: Refinements of the maximin approach to decision-making in a fuzzy environment. Fuzzy Sets Syst. 81, 103-122 (1996).
-
(1996)
Fuzzy Sets Syst.
, vol.81
, pp. 103-122
-
-
Dubois, D.1
Fargier, H.2
Prade, H.3
-
14
-
-
0032666849
-
Computing improved optimal solutions to max- min flexible constraint satisfaction problems
-
Dubois D., Fortemps P.: Computing improved optimal solutions to max- min flexible constraint satisfaction problems. Eur. J. Operat. Res. 118, 95-126 (1999).
-
(1999)
Eur. J. Operat. Res.
, vol.118
, pp. 95-126
-
-
Dubois, D.1
Fortemps, P.2
-
15
-
-
0008559997
-
Algorithm for project scheduling with resource constraints
-
Elsayed E. A.: Algorithm for project scheduling with resource constraints. Fuzzy Sets Syst. 20, 95-103 (1982).
-
(1982)
Fuzzy Sets Syst.
, vol.20
, pp. 95-103
-
-
Elsayed, E.A.1
-
16
-
-
0030735291
-
Stochastic network project scheduling with non-consumable limited resource
-
Golenko-Ginzburz D., Goink A.: Stochastic network project scheduling with non-consumable limited resource. Int. J. Prod. Econ. 48, 29-47 (1997).
-
(1997)
Int. J. Prod. Econ.
, vol.48
, pp. 29-47
-
-
Golenko-Ginzburz, D.1
Goink, A.2
-
17
-
-
0032120296
-
A heuristic for network project scheduling with random activity durations depending on the resource allocation
-
Golenko-Ginzburz D., Goink A.: A heuristic for network project scheduling with random activity durations depending on the resource allocation. Int. J. Prod. Econ. 55, 149-162 (1998).
-
(1998)
Int. J. Prod. Econ.
, vol.55
, pp. 149-162
-
-
Golenko-Ginzburz, D.1
Goink, A.2
-
18
-
-
0040370432
-
Two-phase approach for solving the fuzzy linear programming problems
-
Guu S. M., Wu Y. K.: Two-phase approach for solving the fuzzy linear programming problems. Fuzzy Sets Syst. 107, 191-195 (1999).
-
(1999)
Fuzzy Sets Syst.
, vol.107
, pp. 191-195
-
-
Guu, S.M.1
Wu, Y.K.2
-
19
-
-
0000559267
-
Linear programming with multiple fuzzy goals
-
Hannan E. L.: Linear programming with multiple fuzzy goals. Fuzzy Sets Syst. 6, 235-248 (1981).
-
(1981)
Fuzzy Sets Syst.
, vol.6
, pp. 235-248
-
-
Hannan, E.L.1
-
20
-
-
0029209748
-
A fuzzy dynamic approach to the multicriterion resource allocation problem
-
Hussein M., Abo-Sinna M. A.: A fuzzy dynamic approach to the multicriterion resource allocation problem. Fuzzy Sets Syst. 69, 115-124 (1995).
-
(1995)
Fuzzy Sets Syst.
, vol.69
, pp. 115-124
-
-
Hussein, M.1
Abo-Sinna, M.A.2
-
21
-
-
0001418264
-
Economic optimization of construction project scheduling
-
Karshenas S., Haber D.: Economic optimization of construction project scheduling. Constr. Manag. Econ. 8, 135-146 (1990).
-
(1990)
Constr. Manag. Econ.
, vol.8
, pp. 135-146
-
-
Karshenas, S.1
Haber, D.2
-
22
-
-
0015667795
-
Another look at the PERT assumptions
-
Kotiah T. C. T., Wallace N. D.: Another look at the PERT assumptions. Manag. Sci. 20, 44-49 (1973).
-
(1973)
Manag. Sci.
, vol.20
, pp. 44-49
-
-
Kotiah, T.C.T.1
Wallace, N.D.2
-
23
-
-
0026898945
-
A new approach to some possibilistic linear programming problems
-
Lai Y. J., Hwang C. L.: A new approach to some possibilistic linear programming problems. Fuzzy Sets Syst. 49, 121-133 (1992).
-
(1992)
Fuzzy Sets Syst.
, vol.49
, pp. 121-133
-
-
Lai, Y.J.1
Hwang, C.L.2
-
24
-
-
43549085961
-
On finding compromise solutions in multicriteria problems using the fuzzy min-operator
-
Leberling H.: On finding compromise solutions in multicriteria problems using the fuzzy min-operator. Fuzzy Sets Syst. 6, 105-118 (1981).
-
(1981)
Fuzzy Sets Syst.
, vol.6
, pp. 105-118
-
-
Leberling, H.1
-
25
-
-
30244562641
-
Fuzzy multiple objective programming and computing programming with Pareto optimum
-
Lee E. S., Li R. J.: Fuzzy multiple objective programming and computing programming with Pareto optimum. Fuzzy Sets Syst. 53, 275-283 (1993).
-
(1993)
Fuzzy Sets Syst.
, vol.53
, pp. 275-283
-
-
Lee, E.S.1
Li, R.J.2
-
26
-
-
33645794778
-
Computing efficient solutions to fuzzy multiple objective linear programming problems
-
Li X. Q., Zhang B., Li H.: Computing efficient solutions to fuzzy multiple objective linear programming problems. Fuzzy Sets Syst. 157, 1328-1332 (2006).
-
(2006)
Fuzzy Sets Syst.
, vol.157
, pp. 1328-1332
-
-
Li, X.Q.1
Zhang, B.2
Li, H.3
-
27
-
-
34548391394
-
Project management decisions using fuzzy linear programming
-
Liang T. F.: Project management decisions using fuzzy linear programming. Int. J. Syst. Sci. 37, 1141-1152 (2006).
-
(2006)
Int. J. Syst. Sci.
, vol.37
, pp. 1141-1152
-
-
Liang, T.F.1
-
28
-
-
61849173413
-
Application of fuzzy sets to multi-objective project management decisions in uncertain environments
-
Liang T. F.: Application of fuzzy sets to multi-objective project management decisions in uncertain environments. Int. J. General Syst. 38, 311-330 (2009).
-
(2009)
Int. J. General Syst.
, vol.38
, pp. 311-330
-
-
Liang, T.F.1
-
29
-
-
34247345761
-
Multiobjective resource allocation problem by multistage decision-based hybrid genetic algorithm
-
Lin C. M., Gen M.: Multiobjective resource allocation problem by multistage decision-based hybrid genetic algorithm. Appl. Math. Comput. 187, 574-583 (2007).
-
(2007)
Appl. Math. Comput.
, vol.187
, pp. 574-583
-
-
Lin, C.M.1
Gen, M.2
-
30
-
-
49349090365
-
Fuzzy critical chain method for project scheduling under resource constraints and uncertainty
-
Long L. D., Ohsato A.: Fuzzy critical chain method for project scheduling under resource constraints and uncertainty. Int. J. Proj. Manag. 26, 688-698 (2008).
-
(2008)
Int. J. Proj. Manag.
, vol.26
, pp. 688-698
-
-
Long, L.D.1
Ohsato, A.2
-
31
-
-
0024770103
-
Stochastic and fuzzy PERT
-
Lootsma F. A.: Stochastic and fuzzy PERT. Eur. J. Operat. Res. 43, 174-183 (1989).
-
(1989)
Eur. J. Operat. Res.
, vol.43
, pp. 174-183
-
-
Lootsma, F.A.1
-
32
-
-
0006017595
-
On the estimation of errors introduce by standard assumptions concerning the distribution of activity duration in PERT calculations
-
Lukaszewicz J.: On the estimation of errors introduce by standard assumptions concerning the distribution of activity duration in PERT calculations. Oper. Res. 13, 326-327 (1965).
-
(1965)
Oper. Res.
, vol.13
, pp. 326-327
-
-
Lukaszewicz, J.1
-
33
-
-
0022750364
-
Fuzzy resource allocation
-
Mjelde K. M.: Fuzzy resource allocation. Fuzzy Sets Syst. 19, 239-250 (1986).
-
(1986)
Fuzzy Sets Syst.
, vol.19
, pp. 239-250
-
-
Mjelde, K.M.1
-
34
-
-
35348980157
-
A two-phase methodology for multi-objective supplier evaluation and order allocation problems
-
Özgen D., Önut S., Gülsün B., Tuzkaya U. R. Tuzkaya G.: A two-phase methodology for multi-objective supplier evaluation and order allocation problems. Inf. Sci. 178, 485-500 (2008).
-
(2008)
Inf. Sci.
, vol.178
, pp. 485-500
-
-
Özgen, D.1
Önut, S.2
Gülsün, B.3
Tuzkaya, U.R.4
Tuzkaya, G.5
-
35
-
-
33749564779
-
A new heuristic for resource-constrained project scheduling networks using critical chain concept
-
Rabbani M., Ghomi F., Jolai F., Lahiji N. S.: A new heuristic for resource-constrained project scheduling networks using critical chain concept. Eur. J. Operat. Res. 176, 794-808 (2007).
-
(2007)
Eur. J. Operat. Res.
, vol.176
, pp. 794-808
-
-
Rabbani, M.1
Ghomi, F.2
Jolai, F.3
Lahiji, N.S.4
-
36
-
-
0022093460
-
Inequality relation between fuzzy numbers and its use in fuzzy optimization
-
Ramik J., Rimanek J.: Inequality relation between fuzzy numbers and its use in fuzzy optimization. Fuzzy Sets Syst. 16, 123-138 (1985).
-
(1985)
Fuzzy Sets Syst.
, vol.16
, pp. 123-138
-
-
Ramik, J.1
Rimanek, J.2
-
37
-
-
0030576486
-
Fuzzy linear programming and applications
-
Rommelfanger H.: Fuzzy linear programming and applications. Eur. J. Operat. Res. 92, 512-527 (1996).
-
(1996)
Eur. J. Operat. Res.
, vol.92
, pp. 512-527
-
-
Rommelfanger, H.1
-
38
-
-
0022794872
-
A comparison of heuristics scheduling projects with cash flows and resource restrictions
-
Russell A. R. A.: A comparison of heuristics scheduling projects with cash flows and resource restrictions. Manag. Sci. 32, 1291-1300 (1986).
-
(1986)
Manag. Sci.
, vol.32
, pp. 1291-1300
-
-
Russell, A.R.A.1
-
39
-
-
38249028725
-
An interactive fuzzy satisficing method for multiobjective linear fractional programming problems
-
Sakawa M.: An interactive fuzzy satisficing method for multiobjective linear fractional programming problems. Fuzzy Sets Syst. 28, 129-144 (1988).
-
(1988)
Fuzzy Sets Syst.
, vol.28
, pp. 129-144
-
-
Sakawa, M.1
-
40
-
-
0001001183
-
A formulation of fuzzy linear programming problem based on comparison of fuzzy numbers
-
Tanaka H., Ichihashi H., Asai K.: A formulation of fuzzy linear programming problem based on comparison of fuzzy numbers. Control Cybern. 13, 185-194 (1984).
-
(1984)
Control Cybern.
, vol.13
, pp. 185-194
-
-
Tanaka, H.1
Ichihashi, H.2
Asai, K.3
-
41
-
-
0343496853
-
Using metaheuristics in multiobjective resource constrained project scheduling
-
Viana A., Sousa de J. P.: Using metaheuristics in multiobjective resource constrained project scheduling. Eur. J. Operat. Res. 120, 359-374 (2000).
-
(2000)
Eur. J. Operat. Res.
, vol.120
, pp. 359-374
-
-
Viana, A.1
Sousa de, J.P.2
-
42
-
-
11944260056
-
Fuzzy resource allocations in project management
-
Wang H. F., Fu C. C.: Fuzzy resource allocations in project management. Int. J. Oper. Quant. Manag. 4, 187-197 (1998).
-
(1998)
Int. J. Oper. Quant. Manag.
, vol.4
, pp. 187-197
-
-
Wang, H.F.1
Fu, C.C.2
-
43
-
-
11944259647
-
Project management decisions with multiple fuzzy goals
-
Wang R. C., Liang T. F.: Project management decisions with multiple fuzzy goals. Constr. Manag. Econ. 22, 1047-1056 (2004).
-
(2004)
Constr. Manag. Econ.
, vol.22
, pp. 1047-1056
-
-
Wang, R.C.1
Liang, T.F.2
-
44
-
-
34047177867
-
Application of multiple fuzzy goals programming to project management decisions
-
Wang R. C., Liang T. F.: Application of multiple fuzzy goals programming to project management decisions. Int. J. Indus. Eng. 13, 219-228 (2006).
-
(2006)
Int. J. Indus. Eng.
, vol.13
, pp. 219-228
-
-
Wang, R.C.1
Liang, T.F.2
-
45
-
-
0032096812
-
Optimization analysis for design and planning of multi-project programs
-
Wiley V. D., Deckro R. F., Jackson J. A. Jr.: Optimization analysis for design and planning of multi-project programs. Eur. J. Operat. Res. 107, 492-506 (1998).
-
(1998)
Eur. J. Operat. Res.
, vol.107
, pp. 492-506
-
-
Wiley, V.D.1
Deckro, R.F.2
Jackson Jr., J.A.3
-
46
-
-
0033901620
-
Fuzzy critical path method based ob signed distance ranking of fuzzy numbers
-
Yao J. S., Lin F. T.: Fuzzy critical path method based ob signed distance ranking of fuzzy numbers. IEEE Transac. Syst. Man Cybern. A 30, 76-82 (2000).
-
(2000)
IEEE Transac. Syst. Man Cybern. A
, vol.30
, pp. 76-82
-
-
Yao, J.S.1
Lin, F.T.2
-
47
-
-
0000543297
-
Fuzzy and stochastic programming
-
Yazenin A. V.: Fuzzy and stochastic programming. Fuzzy Sets Syst. 22, 171-180 (1987).
-
(1987)
Fuzzy Sets Syst.
, vol.22
, pp. 171-180
-
-
Yazenin, A.V.1
-
48
-
-
41249084562
-
Optimal multiple-objective resources allocation using hybrid particle swarm optimization and adaptive resources bounds technique
-
Yin P. Y., Wang J. U.: Optimal multiple-objective resources allocation using hybrid particle swarm optimization and adaptive resources bounds technique. J. Comput. Appl. Math. 15, 73-86 (2008).
-
(2008)
J. Comput. Appl. Math.
, vol.15
, pp. 73-86
-
-
Yin, P.Y.1
Wang, J.U.2
-
49
-
-
34248666540
-
Fuzzy sets
-
Zadeh L. A.: Fuzzy sets. Inf. Control 8, 338-353 (1965).
-
(1965)
Inf. Control
, vol.8
, pp. 338-353
-
-
Zadeh, L.A.1
-
50
-
-
0016873803
-
Description and optimization of fuzzy systems
-
Zimmermann H.-J.: Description and optimization of fuzzy systems. Int. J. General Syst. 2, 209-215 (1976).
-
(1976)
Int. J. General Syst.
, vol.2
, pp. 209-215
-
-
Zimmermann, H.-J.1
-
51
-
-
49349136235
-
Fuzzy programming and linear programming with several objective functions
-
Zimmermann H.-J.: Fuzzy programming and linear programming with several objective functions. Fuzzy Sets Syst. 1, 45-56 (1978).
-
(1978)
Fuzzy Sets Syst.
, vol.1
, pp. 45-56
-
-
Zimmermann, H.-J.1
|