메뉴 건너뛰기




Volumn 218, Issue 22, 2012, Pages 11100-11111

A heuristic approach to a single stage assembly problem with transportation allocation

Author keywords

Assembly delays; Assembly scheduling; Heuristic; Transportation allocation

Indexed keywords

ALLOCATION DECISION; ASSEMBLY LINE; ASSEMBLY PROBLEMS; ASSEMBLY SCHEDULING; COMMERCIAL SOFTWARE; DELIVERY COSTS; EARLINESS AND TARDINESS; HEALTH PRODUCTS; HEURISTIC; HEURISTIC APPROACH; HYBRID HEURISTIC ALGORITHMS; MIXED INTEGER PROGRAMMING MODEL; PRACTICAL PROBLEMS; SINGLE STAGE; TRANSPORT MODES; WAITING TIME;

EID: 84862838179     PISSN: 00963003     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.amc.2012.04.066     Document Type: Article
Times cited : (11)

References (36)
  • 1
    • 49749136644 scopus 로고    scopus 로고
    • Optimization of production allocation and transportation of customer orders for a leading forest products company
    • M. Aydinel, T. Sowlati, X. Cerda, E. Cope, and M. Gerschman Optimization of production allocation and transportation of customer orders for a leading forest products company Math. Comput. Model. 48 7-8 2008 1158 1169
    • (2008) Math. Comput. Model. , vol.48 , Issue.78 , pp. 1158-1169
    • Aydinel, M.1    Sowlati, T.2    Cerda, X.3    Cope, E.4    Gerschman, M.5
  • 2
    • 79958127388 scopus 로고    scopus 로고
    • A multi-agent approach to load consolidation in transportation
    • A. Baykasoglu, and V. Kaplanoglu A multi-agent approach to load consolidation in transportation Adv. Eng. Softw. 42 7 2011 477 490
    • (2011) Adv. Eng. Softw. , vol.42 , Issue.7 , pp. 477-490
    • Baykasoglu, A.1    Kaplanoglu, V.2
  • 3
    • 0032658274 scopus 로고    scopus 로고
    • Inventory control on sequences of links with given transportation frequencies
    • L. Bertazzi, and M.G. Speranza Inventory control on sequences of links with given transportation frequencies Int. J. Prod. Econ. 59 1-3 1999 261 270
    • (1999) Int. J. Prod. Econ. , vol.59 , Issue.13 , pp. 261-270
    • Bertazzi, L.1    Speranza, M.G.2
  • 4
    • 0033895944 scopus 로고    scopus 로고
    • Customer order lead times for production based on lead time and tardiness costs
    • J.W.M. Bertrand, and H.P.G. van Ooijen Customer order lead times for production based on lead time and tardiness costs Int. J. Prod. Econ. 64 1-3 2000 257 265
    • (2000) Int. J. Prod. Econ. , vol.64 , Issue.13 , pp. 257-265
    • Bertrand, J.W.M.1    Van Ooijen, H.P.G.2
  • 6
    • 70349745371 scopus 로고    scopus 로고
    • A tabu search heuristic for the split delivery vehicle routing problem with production and demand calendars
    • M.C. Bolduc, G. Laporte, J. Renaud, and F.F. Boctor A tabu search heuristic for the split delivery vehicle routing problem with production and demand calendars Eur. J. Oper. Res. 202 1 2010 122 130
    • (2010) Eur. J. Oper. Res. , vol.202 , Issue.1 , pp. 122-130
    • Bolduc, M.C.1    Laporte, G.2    Renaud, J.3    Boctor, F.F.4
  • 7
    • 31144471511 scopus 로고    scopus 로고
    • A comparison of outbound dispatch policies for integrated inventory and transportation decisions
    • S. Cetinkaya, F. Mutlu, and C.Y. Lee A comparison of outbound dispatch policies for integrated inventory and transportation decisions Eur. J. Oper. Res. 171 3 2006 1094 1112
    • (2006) Eur. J. Oper. Res. , vol.171 , Issue.3 , pp. 1094-1112
    • Cetinkaya, S.1    Mutlu, F.2    Lee, C.Y.3
  • 9
    • 22544461035 scopus 로고    scopus 로고
    • Integrated scheduling of production and distribution operations
    • Z.L. Chen, and G.L. Vairaktarakis Integrated scheduling of production and distribution operations Manage. Sci. 51 4 2005 614 628
    • (2005) Manage. Sci. , vol.51 , Issue.4 , pp. 614-628
    • Chen, Z.L.1    Vairaktarakis, G.L.2
  • 10
    • 70350772517 scopus 로고    scopus 로고
    • Artificial immune systems for assembly sequence planning exploration
    • C.C. Chang, H.E. Tseng, and L.P. Meng Artificial immune systems for assembly sequence planning exploration Eng. Appl. Artif. Intell. 22 8 2009 1218 1232
    • (2009) Eng. Appl. Artif. Intell. , vol.22 , Issue.8 , pp. 1218-1232
    • Chang, C.C.1    Tseng, H.E.2    Meng, L.P.3
  • 11
    • 0026836720 scopus 로고
    • Optimal due-date assignment and sequencing
    • P. De, J.B. Gosh, and C.E. Wells Optimal due-date assignment and sequencing Eur. J. Oper. Res. 57 1992 323 332
    • (1992) Eur. J. Oper. Res. , vol.57 , pp. 323-332
    • De, P.1    Gosh, J.B.2    Wells, C.E.3
  • 12
    • 0029342706 scopus 로고
    • The split delivery vehicle scheduling problem with time windows and grid network distances
    • P.W. Frizzell, and J.W. Giffin The split delivery vehicle scheduling problem with time windows and grid network distances Comput. Oper. Res. 22 6 1995 655 667
    • (1995) Comput. Oper. Res. , vol.22 , Issue.6 , pp. 655-667
    • Frizzell, P.W.1    Giffin, J.W.2
  • 13
    • 0033339421 scopus 로고    scopus 로고
    • Synchronized development of production, inventory and distribution schedules
    • F. Fumero, and C. Vercellis Synchronized development of production, inventory and distribution schedules Transport. Sci. 33 1999 330 340
    • (1999) Transport. Sci. , vol.33 , pp. 330-340
    • Fumero, F.1    Vercellis, C.2
  • 14
    • 1842843006 scopus 로고    scopus 로고
    • Coordinated scheduling of production and delivery from multiple plants
    • J.M. Garcia, S. Lozano, and D. Canca Coordinated scheduling of production and delivery from multiple plants Robot. Comput.-Integr. Manuf. 20 3 2004 191 198
    • (2004) Robot. Comput.-Integr. Manuf. , vol.20 , Issue.3 , pp. 191-198
    • Garcia, J.M.1    Lozano, S.2    Canca, D.3
  • 15
    • 15344350684 scopus 로고    scopus 로고
    • Production and delivery scheduling problem with time windows
    • J.M. Garcia, and S. Lozano Production and delivery scheduling problem with time windows Comput. Indus. Eng. 48 4 2005 733 742
    • (2005) Comput. Indus. Eng. , vol.48 , Issue.4 , pp. 733-742
    • Garcia, J.M.1    Lozano, S.2
  • 16
    • 44649197715 scopus 로고    scopus 로고
    • Development of a genetic algorithm for component placement sequence optimization in printed circuit board assembly
    • C.S. Hardas, T.L. Doolen, and D.H. Toni Development of a genetic algorithm for component placement sequence optimization in printed circuit board assembly Comput. Indus. Eng. 55 1 2008 165 182
    • (2008) Comput. Indus. Eng. , vol.55 , Issue.1 , pp. 165-182
    • Hardas, C.S.1    Doolen, T.L.2    Toni, D.H.3
  • 17
    • 0033075820 scopus 로고    scopus 로고
    • A genetic-algorithm-based approach to the generation of robotic assembly sequences
    • D.S. Hong, and H.S. Cho A genetic-algorithm-based approach to the generation of robotic assembly sequences Contr. Eng. Pract. 7 2 1999 151 159
    • (1999) Contr. Eng. Pract. , vol.7 , Issue.2 , pp. 151-159
    • Hong, D.S.1    Cho, H.S.2
  • 18
    • 33750328011 scopus 로고    scopus 로고
    • A two-stage algorithm with valid inequalities for the split delivery vehicle routing problem
    • M. Jin, K. Kai, and R.O. Bowden A two-stage algorithm with valid inequalities for the split delivery vehicle routing problem Int. J. Prod. Econ. 105 1 2007 228 242
    • (2007) Int. J. Prod. Econ. , vol.105 , Issue.1 , pp. 228-242
    • Jin, M.1    Kai, K.2    Bowden, R.O.3
  • 19
    • 70449517270 scopus 로고    scopus 로고
    • Coordination of inventory and transportation managements in a two-level supply chain
    • J.H. Kang, and Y.D. Kim Coordination of inventory and transportation managements in a two-level supply chain Int. J. Prod. Econ. 123 1 2010 137 145
    • (2010) Int. J. Prod. Econ. , vol.123 , Issue.1 , pp. 137-145
    • Kang, J.H.1    Kim, Y.D.2
  • 20
    • 52049093681 scopus 로고    scopus 로고
    • Integrated inventory and transportation mode selection: A service parts logistics system
    • E. Kutanoglu, and D. Lohiya Integrated inventory and transportation mode selection: A service parts logistics system Transport. Res. Part E 44 5 2008 665 683
    • (2008) Transport. Res. Part e , vol.44 , Issue.5 , pp. 665-683
    • Kutanoglu, E.1    Lohiya, D.2
  • 21
    • 0035815805 scopus 로고    scopus 로고
    • Stockout risk and order splitting
    • P. Kelle, and P.A. Miller Stockout risk and order splitting Int. J. Prod. Econ. 71 1-3 2001 407 415
    • (2001) Int. J. Prod. Econ. , vol.71 , Issue.13 , pp. 407-415
    • Kelle, P.1    Miller, P.A.2
  • 22
    • 0344427189 scopus 로고    scopus 로고
    • Machine scheduling with transportation considerations
    • C.Y. Lee, and Z.L. Chen Machine scheduling with transportation considerations J. Scheduling 4 2001 3 24
    • (2001) J. Scheduling , vol.4 , pp. 3-24
    • Lee, C.Y.1    Chen, Z.L.2
  • 23
    • 0035897983 scopus 로고    scopus 로고
    • Improved methods of assembly sequence determination for automatic assembly systems
    • H.R. Lee, and D.D. Gemmill Improved methods of assembly sequence determination for automatic assembly systems Eur. J. Oper. Res. 131 3 2001 611 621
    • (2001) Eur. J. Oper. Res. , vol.131 , Issue.3 , pp. 611-621
    • Lee, H.R.1    Gemmill, D.D.2
  • 24
    • 33750028260 scopus 로고    scopus 로고
    • Solution methodology for synchronizing assembly manufacturing and air transportation of consumer electronics supply chain
    • K.P. Li, A.I. Sivakumar, M. Mathirajan, and V.K. Ganesan Solution methodology for synchronizing assembly manufacturing and air transportation of consumer electronics supply chain Int. J. Business 9 4 2004 361 380
    • (2004) Int. J. Business , vol.9 , Issue.4 , pp. 361-380
    • Li, K.P.1    Sivakumar, A.I.2    Mathirajan, M.3    Ganesan, V.K.4
  • 25
    • 27944436124 scopus 로고    scopus 로고
    • Synchronized scheduling of assembly and multi-destination air transportation in a consumer electronics supply chain
    • K.P. Li, A.I. Sivakumar, and V.K. Ganesan Synchronized scheduling of assembly and multi-destination air transportation in a consumer electronics supply chain Int. J. Prod. Res. 43 13 2005 2671 2685
    • (2005) Int. J. Prod. Res. , vol.43 , Issue.13 , pp. 2671-2685
    • Li, K.P.1    Sivakumar, A.I.2    Ganesan, V.K.3
  • 26
    • 33750012584 scopus 로고    scopus 로고
    • Scheduling of single stage assembly with air transportation in a consumer electronic supply chain
    • K.P. Li, V.K. Ganesan, and A.I. Sivakumar Scheduling of single stage assembly with air transportation in a consumer electronic supply chain Comput. Indus. Eng. 51 13 2006 264 278
    • (2006) Comput. Indus. Eng. , vol.51 , Issue.13 , pp. 264-278
    • Li, K.P.1    Ganesan, V.K.2    Sivakumar, A.I.3
  • 27
    • 36048991730 scopus 로고    scopus 로고
    • Complexities and algorithms for synchronized scheduling of parallel machine assembly and air transportation in consumer electronics supply chain
    • K.P. Li, A.I. Sivakumar, and V.K. Ganesan Complexities and algorithms for synchronized scheduling of parallel machine assembly and air transportation in consumer electronics supply chain Eur. J. Oper. Res. 187 2008 442 455
    • (2008) Eur. J. Oper. Res. , vol.187 , pp. 442-455
    • Li, K.P.1    Sivakumar, A.I.2    Ganesan, V.K.3
  • 28
    • 35348998412 scopus 로고    scopus 로고
    • Optimal inventory policies with two modes of freight transportation
    • B.Q. Rieksts, and J.A. Ventura Optimal inventory policies with two modes of freight transportation Eur. J. Oper. Res. 186 2 2008 576 585
    • (2008) Eur. J. Oper. Res. , vol.186 , Issue.2 , pp. 576-585
    • Rieksts, B.Q.1    Ventura, J.A.2
  • 29
    • 68249096944 scopus 로고    scopus 로고
    • Two-stage inventory models with a bi-modal transportation cost
    • B.Q. Rieksts, and J.A. Ventura Two-stage inventory models with a bi-modal transportation cost Comput. Oper. Res. 37 1 2010 20 31
    • (2010) Comput. Oper. Res. , vol.37 , Issue.1 , pp. 20-31
    • Rieksts, B.Q.1    Ventura, J.A.2
  • 30
    • 77956192365 scopus 로고    scopus 로고
    • Inventory and delivery optimization under seasonal demand in the supply chain
    • M.A. Rodriguez, and A. Vecchietti Inventory and delivery optimization under seasonal demand in the supply chain Comput. Chem. Eng. 34 10 2010 1705 1718
    • (2010) Comput. Chem. Eng. , vol.34 , Issue.10 , pp. 1705-1718
    • Rodriguez, M.A.1    Vecchietti, A.2
  • 31
    • 79957704545 scopus 로고    scopus 로고
    • Branch and price for the vehicle routing problem with discrete split deliveries and time windows
    • M. Salani, and V. Ilaria Branch and price for the vehicle routing problem with discrete split deliveries and time windows Eur. J. Oper. Res. 213 3 2011 470 477
    • (2011) Eur. J. Oper. Res. , vol.213 , Issue.3 , pp. 470-477
    • Salani, M.1    Ilaria, V.2
  • 32
    • 0033344267 scopus 로고    scopus 로고
    • A review of integrated analysis of production-distribution systems
    • A.M. Sarmiento, and R. Nagi A review of integrated analysis of production-distribution systems IIE Trans. 31 1999 1061 1074
    • (1999) IIE Trans. , vol.31 , pp. 1061-1074
    • Sarmiento, A.M.1    Nagi, R.2
  • 33
    • 33845274062 scopus 로고    scopus 로고
    • Supply chain inventory optimization with two customer classes in discrete time
    • H. Tempelmeier Supply chain inventory optimization with two customer classes in discrete time Eur. J. Oper. Res. 174 1 2006 600 621
    • (2006) Eur. J. Oper. Res. , vol.174 , Issue.1 , pp. 600-621
    • Tempelmeier, H.1
  • 34
    • 0037310041 scopus 로고    scopus 로고
    • An evaluation of freight consolidation policies in global third party logistics
    • J.C. Tyan, F.K. Wang, and T.C. Du An evaluation of freight consolidation policies in global third party logistics Omega 31 2003 55 62
    • (2003) Omega , vol.31 , pp. 55-62
    • Tyan, J.C.1    Wang, F.K.2    Du, T.C.3
  • 35
    • 77954309786 scopus 로고    scopus 로고
    • Integration of inventory and transportation decisions in a logistics system
    • Q.H. Zhao, S. Chen, C.H. Leung, and K.K. Lai Integration of inventory and transportation decisions in a logistics system Transport. Res. Part E 46 6 2010 913 925
    • (2010) Transport. Res. Part e , vol.46 , Issue.6 , pp. 913-925
    • Zhao, Q.H.1    Chen, S.2    Leung, C.H.3    Lai, K.K.4
  • 36
    • 0026203621 scopus 로고
    • Application of mathematical programming to a large-scale agricultural production and distribution system
    • M. Zuo, W. Kuo, and K. McRoberts Application of mathematical programming to a large-scale agricultural production and distribution system J. Oper. Res. Soc. 42 8 1991 639 648
    • (1991) J. Oper. Res. Soc. , vol.42 , Issue.8 , pp. 639-648
    • Zuo, M.1    Kuo, W.2    McRoberts, K.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.