-
1
-
-
55949090264
-
A high performance tool for the simulation of the dynamic pantograph-catenary interaction
-
A. Alberto, J. Benet, E. Arias, D. Cebrian, T. Rojo, and F. Cuartero A high performance tool for the simulation of the dynamic pantograph-catenary interaction Mathematics and Computers in Simulation 79 3 2008 652 667
-
(2008)
Mathematics and Computers in Simulation
, vol.79
, Issue.3
, pp. 652-667
-
-
Alberto, A.1
Benet, J.2
Arias, E.3
Cebrian, D.4
Rojo, T.5
Cuartero, F.6
-
2
-
-
7444251595
-
Failure analysis of a railway copper contact strip
-
C.R.F. Azevedo, and A. Sinatora Failure analysis of a railway copper contact strip Engineering Failure Analysis 11 6 2004 829 841
-
(2004)
Engineering Failure Analysis
, vol.11
, Issue.6
, pp. 829-841
-
-
Azevedo, C.R.F.1
Sinatora, A.2
-
3
-
-
64549138881
-
A simulation study of installation locations and capacity of regenerative absorption inverters in DC 1500 v electric railways system
-
C.H. Bae A simulation study of installation locations and capacity of regenerative absorption inverters in DC 1500 V electric railways system Simulation Modelling Practice and Theory 17 5 2009 829 838
-
(2009)
Simulation Modelling Practice and Theory
, vol.17
, Issue.5
, pp. 829-838
-
-
Bae, C.H.1
-
4
-
-
0033881117
-
Innovative solutions for overhead catenary-pantograph system: Wire actuated control and observed contact force
-
A. Balestrino, O. Bruno, A. Landi, and L. Sani Innovative solutions for overhead catenary-pantograph system: wire actuated control and observed contact force Vehicle System Dynamics 33 2000 69 89
-
(2000)
Vehicle System Dynamics
, vol.33
, pp. 69-89
-
-
Balestrino, A.1
Bruno, O.2
Landi, A.3
Sani, L.4
-
5
-
-
56249126397
-
Bond graph modeling of a railway truck on curved track
-
N. Banerjee, A.K. Saha, R. Karmakar, and R. Bhattacharyya Bond graph modeling of a railway truck on curved track Simulation Modelling Practice and Theory 17 1 2009 22 34
-
(2009)
Simulation Modelling Practice and Theory
, vol.17
, Issue.1
, pp. 22-34
-
-
Banerjee, N.1
Saha, A.K.2
Karmakar, R.3
Bhattacharyya, R.4
-
8
-
-
0141894910
-
Applying RCM in large scale systems: A case study with railway networks
-
J. Carretero, J.M. Pérez, F. García-Carballeira, A. Calderón, J. Fernández, J.D. García, A. Lozano, L. Cardona, N. Cotaina, and P. Prete Applying RCM in large scale systems: a case study with railway networks Reliability Engineering & System Safety 82 3 2003 257 273
-
(2003)
Reliability Engineering & System Safety
, vol.82
, Issue.3
, pp. 257-273
-
-
Carretero, J.1
Pérez, J.M.2
García-Carballeira, F.3
Calderón, A.4
Fernández, J.5
García, J.D.6
Lozano, A.7
Cardona, L.8
Cotaina, N.9
Prete, P.10
-
9
-
-
84862515895
-
Planning for railway electrification
-
C.J. Clemow Planning for railway electrification Proceedings of the IEE 119 4 1972 431 440
-
(1972)
Proceedings of the IEE
, vol.119
, Issue.4
, pp. 431-440
-
-
Clemow, C.J.1
-
10
-
-
84862515893
-
Economic aspects of overhead equipment for DC railway electrification
-
O.J. Crompton, and G.A. Wallace Economic aspects of overhead equipment for DC railway electrification Proceedings of the IEE - Part I: General 100 124 1953 133 145
-
(1953)
Proceedings of the IEE - Part I: General
, vol.100
, Issue.124
, pp. 133-145
-
-
Crompton, O.J.1
Wallace, G.A.2
-
11
-
-
0006536915
-
Análisis coste-beneficio del tren de alta velocidad en Espana
-
G. De Rus, and V. Inglada Análisis coste-beneficio del tren de alta velocidad en Espana Revista de Economía Aplicada 1 1993 27 48
-
(1993)
Revista de Economía Aplicada
, vol.1
, pp. 27-48
-
-
De Rus, G.1
Inglada, V.2
-
12
-
-
84862515894
-
Fixed Installations
-
BS-EN-50119:2009. Railway Applications
-
BS-EN-50119:2009. Railway Applications. Fixed Installations. Electric Traction Overhead Contact Lines, 2009.
-
(2009)
Electric Traction Overhead Contact Lines
-
-
-
13
-
-
84862553095
-
-
ETI-C(2008) 807 Especificacion Técnica de Interoperabilidad del Subsistema de Energía del Sistema Ferroviario Transeuropeo de alta Velocidad, 2008
-
ETI-C(2008) 807 Especificacion Técnica de Interoperabilidad del Subsistema de Energía del Sistema Ferroviario Transeuropeo de alta Velocidad, 2008.
-
-
-
-
16
-
-
44649114929
-
Coupled electromechanical cost optimization of high speed railway overheads
-
42037
-
J.R. Jimenez-Octavio, E. Pilo, O. Lopez-Garcia, A. Carnicero, Coupled electromechanical cost optimization of high speed railway overheads, in: ASME Conference Proceedings, vol. 2006(42037), 2006, pp. 231-240.
-
(2006)
ASME Conference Proceedings
, vol.2006
, pp. 231-240
-
-
Jimenez-Octavio, J.R.1
Pilo, E.2
Lopez-Garcia, O.3
Carnicero, A.4
-
18
-
-
34247524119
-
State sensitivity analysis of the pantograph system for a high speed rail vehicle considering span length and static uplift force
-
J.W. Kima, H.C. Chaeb, B.S. Parkc, S.Y. Leed, C.S. Hand, and J.S. Jang State sensitivity analysis of the pantograph system for a high speed rail vehicle considering span length and static uplift force Journal of sound and Vibration 303 3-5 2007 405 427
-
(2007)
Journal of Sound and Vibration
, vol.303
, Issue.35
, pp. 405-427
-
-
Kima, J.W.1
Chaeb, H.C.2
Parkc, B.S.3
Leed, S.Y.4
Hand, C.S.5
Jang, J.S.6
-
20
-
-
0028425554
-
User interfaces and discrete event simulation models
-
J. Kuljis User interfaces and discrete event simulation models Simulation Practice and Theory 1 5 1994 207 221
-
(1994)
Simulation Practice and Theory
, vol.1
, Issue.5
, pp. 207-221
-
-
Kuljis, J.1
-
21
-
-
84862553094
-
The behaviour of overhead transmission lines in high winds
-
E.H. Lamb The behaviour of overhead transmission lines in high winds Journal of the Institution of Electrical Engineers 66 382 1928 1079 1085
-
(1928)
Journal of the Institution of Electrical Engineers
, vol.66
, Issue.382
, pp. 1079-1085
-
-
Lamb, E.H.1
-
22
-
-
1642371308
-
Modelling and simulation of advanced problems and smart systems in civil engineering
-
F. Maceri, and F. Casciati Modelling and simulation of advanced problems and smart systems in civil engineering Simulation Modelling Practice and Theory 11 5-6 2003 313
-
(2003)
Simulation Modelling Practice and Theory
, vol.11
, Issue.56
, pp. 313
-
-
MacEri, F.1
Casciati, F.2
-
25
-
-
0015129803
-
A survey of Western European AC electrified railway supply substation and catenary system techniques and standards
-
B.A. Ross A survey of Western European AC electrified railway supply substation and catenary system techniques and standards IEEE Transactions on Industry and General Applications IGA-7 5 1971 666 672
-
(1971)
IEEE Transactions on Industry and General Applications
, vol.IGA-7
, Issue.5
, pp. 666-672
-
-
Ross, B.A.1
-
26
-
-
65249089842
-
The most suitable structure of contact wire on overlap sections of Shinkansen lines
-
M. Shimian, and Y. Fujii The most suitable structure of contact wire on overlap sections of Shinkansen lines Proceedings of the WCRR C 1997 281 286
-
(1997)
Proceedings of the WCRR
, vol.C
, pp. 281-286
-
-
Shimian, M.1
Fujii, Y.2
-
27
-
-
0037690215
-
Dynamic stiffness of railway overhead wire system and its effect on pantograph-catenary system dynamics
-
T. Wu, and M.J. Bernnan Dynamic stiffness of railway overhead wire system and its effect on pantograph-catenary system dynamics Journal of Sound and vibration 219 3 1999 483 502
-
(1999)
Journal of Sound and Vibration
, vol.219
, Issue.3
, pp. 483-502
-
-
Wu, T.1
Bernnan, M.J.2
-
28
-
-
80054744246
-
A feasible timetable generator simulation modelling framework for train scheduling problem
-
O. Yalçinkaya, and G.M. Bayhan A feasible timetable generator simulation modelling framework for train scheduling problem Simulation Modelling Practice and Theory 20 1 2012 124 141
-
(2012)
Simulation Modelling Practice and Theory
, vol.20
, Issue.1
, pp. 124-141
-
-
Yalçinkaya, O.1
Bayhan, G.M.2
-
29
-
-
33645123951
-
Detection of incipient failures by using an H2-norm criterion: Application to railway switching points
-
E. Zattoni Detection of incipient failures by using an H2-norm criterion: application to railway switching points Control Engineering Practice 14 8 2006 885 895
-
(2006)
Control Engineering Practice
, vol.14
, Issue.8
, pp. 885-895
-
-
Zattoni, E.1
|