-
1
-
-
3843144923
-
Performance measurement system design: A literature review and research agenda
-
DOI 10.1108/01443579510083622
-
Neely, A.; Gregory, M. & Platts, K. Performance measurement system design: A literature review and research agenda. Int. J. Oper. Prod. Mgmt., 1995, 15(4), 80-116. (Pubitemid 39046837)
-
(1995)
International Journal of Operations and Production Management
, vol.15
, Issue.4
, pp. 80-116
-
-
Neely, A.1
Gregory, M.2
Platts, K.3
-
2
-
-
33746878223
-
Maintenance performance measurement (MPM): Issues and challenges
-
DOI 10.1108/13552510610685084
-
Parida, A. & Kumar, U. Applications and case studies: Maintenance performance measurement (MPM): Issues and challenges. J. Qual. Maint. Engg., 2006, 12(3), 239-51. (Pubitemid 44200059)
-
(2006)
Journal of Quality in Maintenance Engineering
, vol.12
, Issue.3
, pp. 239-251
-
-
Parida, A.1
Kumar, U.2
-
3
-
-
34547850627
-
Development of a multi-criteria hierarchical framework for maintenance performance measurement (MPM)
-
DOI 10.1108/13552510710780276
-
Parida, A. & Chattopadhyay, G. Methodology and theory: Development of a multi-criteria hierarchical framework for maintenance performance measurement (MPM). J. Quality Maint. Engg., 2007, 13(3), 241-58. (Pubitemid 47247249)
-
(2007)
Journal of Quality in Maintenance Engineering
, vol.13
, Issue.3
, pp. 241-258
-
-
Parida, A.1
Chattopadhyay, G.2
-
4
-
-
84862019331
-
The application of performance measurement in the service quality concept: The case of Greek service organization
-
Zisis, P.; Garefalakis, A. & Sariannidis, N. The application of performance measurement in the service quality concept: The case of Greek service organization. J. Money, Investment Banking, 2009, 9, 21-47.
-
(2009)
J. Money, Investment Banking
, vol.9
, pp. 21-47
-
-
Zisis, P.1
Garefalakis, A.2
Sariannidis, N.3
-
5
-
-
33746889023
-
Preventive effect of optimal replacement policies
-
DOI 10.1108/13552510610685101
-
Jiang, R.; Ji, P. & Tsang, A.H.C. Methodology and theory: Preventive effect of optimal replacement policies. J. Quality Maint. Engg., 2006, 12(3), 267-74. (Pubitemid 44200061)
-
(2006)
Journal of Quality in Maintenance Engineering
, vol.12
, Issue.3
, pp. 267-274
-
-
Jiang, R.1
Ji, P.2
Tsang, A.H.C.3
-
6
-
-
0036623453
-
Integrated performance measurement design: Insights from an application in aircraft maintenance
-
Rouse, P.; Putterill, M. & Ryan, D. Integrated performance measurement design: Insights from an application in aircraft maintenance. Manag. Accoun. Res., 2000, 13, 229-48.
-
(2000)
Manag. Accoun. Res.
, vol.13
, pp. 229-248
-
-
Rouse, P.1
Putterill, M.2
Ryan, D.3
-
7
-
-
0035906314
-
Linking maintenance strategies to performance
-
DOI 10.1016/S0925-5273(00)00067-0, PII S0925527300000670
-
Swanson, L. Linking maintenance strategies to performance. Int. J. Prod. Eco., 2001, 70(3), 237-44. (Pubitemid 32272152)
-
(2001)
International Journal of Production Economics
, vol.70
, Issue.3
, pp. 237-244
-
-
Swanson, L.1
-
8
-
-
77957564892
-
Multi-echelon repair inventory systems: Select issues in modular electronic equipment
-
Garg, A. & Deshmukh, S.G. Multi-echelon repair inventory systems: Select issues in modular electronic equipment. Def. Sc. J., 2010, 60(5), 514-24.
-
(2010)
Def. Sc. J.
, vol.60
, Issue.5
, pp. 514-524
-
-
Garg, A.1
Deshmukh, S.G.2
-
9
-
-
77957602397
-
Expert knowledge base to support maintenance of a radar system
-
Duer, S. Expert knowledge base to support maintenance of a radar system. Def. Sc. J., 2010, 60(5), 531-40.
-
(2010)
Def. Sc. J.
, vol.60
, Issue.5
, pp. 531-540
-
-
Duer, S.1
-
10
-
-
79952096757
-
Minimisation of non-periodic preventive maintenance cost in series-parallel systems
-
Wang, C & Lin, T. Minimisation of non-periodic preventive maintenance cost in series-parallel systems. Def. Sc. J., 2011, 61(1), 44-50.
-
(2011)
Def. Sc. J.
, vol.61
, Issue.1
, pp. 44-50
-
-
Wang, C.1
Lin, T.2
-
12
-
-
0036638313
-
An analysis of the effect of a reliability paradigm shift on leading british aerospace companies
-
Jones, J. A. & Warrington, L. An analysis of the effect of a reliability paradigm shift on leading british aerospace companies. Quality Rel. Engg. Int., 2002, 18, 285-92.
-
(2002)
Quality Rel. Engg. Int.
, vol.18
, pp. 285-292
-
-
Jones, J.A.1
Warrington, L.2
-
13
-
-
33847653266
-
Reliability improvement through alternative designs-A case study
-
DOI 10.1016/j.ress.2006.05.008, PII S0951832006001190
-
Kumar, S. Chattopadhyay, G. & Kumar, U. Reliability improvement through alternative designs : A case study. Rel. Engg. Sys. Safety, 2007, 92, 983-91. (Pubitemid 46350834)
-
(2007)
Reliability Engineering and System Safety
, vol.92
, Issue.7
, pp. 983-991
-
-
Kumar, S.1
Chattopadhyay, G.2
Kumar, U.3
-
15
-
-
0037259264
-
New concept for aircraft maintenance management (II) : The establishment of the spoon-shaped curve model
-
Qi, Y. Zhigang, L. & Bifeng, S. New concept for aircraft maintenance management (II) : The establishment of the spoon-shaped curve model. In Proceedings of Annual Reliability Maintenance Symposium, 2003. pp. 68-73.
-
(2003)
Proceedings of Annual Reliability Maintenance Symposium
, pp. 68-73
-
-
Qi, Y.1
Zhigang, L.2
Bifeng, S.3
-
16
-
-
33750731956
-
Searching for multiobjective preventive maintenance schedules: Combining preferences with evolutionary algorithms
-
DOI 10.1016/j.ejor.2005.12.015, PII S0377221705008477
-
Quan, G. Greenwood, G.W. Liu, D. & Hu, S. Searching for multi objective preventive maintenance schedules: Combining preferences with evolutionary algorithms. Euro. J. Oper. Res., 2007, 177(3), 1969-984. (Pubitemid 44709462)
-
(2007)
European Journal of Operational Research
, vol.177
, Issue.3
, pp. 1969-1984
-
-
Quan, G.1
Greenwood, G.W.2
Liu, D.3
Hu, S.4
-
17
-
-
0037213213
-
An optimization model for aircraft maintenance scheduling and re-assignment
-
DOI 10.1016/S0965-8564(02)00004-6, PII S0965856402000046
-
Sriram, C. & Haghani, A. An optimization model for aircraft maintenance scheduling and re-assignment. Transportation Res. Pt. A, 2003, 37, 29-48. (Pubitemid 36000195)
-
(2003)
Transportation Research Part A: Policy and Practice
, vol.37
, Issue.1
, pp. 29-48
-
-
Sriram, C.1
Haghani, A.2
-
18
-
-
30544442050
-
Availability of weapon systems with multiple failures and logistic delays
-
Upadhya, K.S. & Srinivasan, N.K. Availability of weapon systems with multiple failures and logistic delays. Int. J. Quality Rel. Mgmt., 2003, 20(7), 836-846. (Pubitemid 37060213)
-
(2003)
International Journal of Quality and Reliability Management
, vol.20
, Issue.6-7
, pp. 836-846
-
-
Upadhya, K.S.1
Srinivasan, N.K.2
-
19
-
-
0035691808
-
Aging avionics - What causes it and how to respond
-
DOI 10.1109/6144.974969, PII S1521333101111797
-
Shawlee, W.II & Humphrey, D. Aging avionics-What causes it and how to respond. IEEE Trans. Components Packaging Tech., 2001, 24(4), 739-40. (Pubitemid 34091950)
-
(2001)
IEEE Transactions on Components and Packaging Technologies
, vol.24
, Issue.4
, pp. 739-740
-
-
Shawlee II, W.1
Humphrey, D.2
-
20
-
-
70349611286
-
Action research for practicing managers
-
French, S. Action research for practicing managers. J. Mgmt. Develop., 2009, 28(3), 187-204.
-
(2009)
J. Mgmt. Develop.
, vol.28
, Issue.3
, pp. 187-204
-
-
French, S.1
|