메뉴 건너뛰기




Volumn 62, Issue 2, 2012, Pages 83-89

Maintenance, repair, and overhaul performance indicators for military aircraft

Author keywords

Aircraft maintenance; Performance measurement; Reliability

Indexed keywords

FAILURE RATE; MAINTAINABILITY; PROBABILITY DISTRIBUTIONS; REPAIR; VEHICLE PERFORMANCE;

EID: 84862011507     PISSN: 0011748X     EISSN: 0976464X     Source Type: Journal    
DOI: 10.14429/dsj.62.881     Document Type: Review
Times cited : (13)

References (20)
  • 2
    • 33746878223 scopus 로고    scopus 로고
    • Maintenance performance measurement (MPM): Issues and challenges
    • DOI 10.1108/13552510610685084
    • Parida, A. & Kumar, U. Applications and case studies: Maintenance performance measurement (MPM): Issues and challenges. J. Qual. Maint. Engg., 2006, 12(3), 239-51. (Pubitemid 44200059)
    • (2006) Journal of Quality in Maintenance Engineering , vol.12 , Issue.3 , pp. 239-251
    • Parida, A.1    Kumar, U.2
  • 3
    • 34547850627 scopus 로고    scopus 로고
    • Development of a multi-criteria hierarchical framework for maintenance performance measurement (MPM)
    • DOI 10.1108/13552510710780276
    • Parida, A. & Chattopadhyay, G. Methodology and theory: Development of a multi-criteria hierarchical framework for maintenance performance measurement (MPM). J. Quality Maint. Engg., 2007, 13(3), 241-58. (Pubitemid 47247249)
    • (2007) Journal of Quality in Maintenance Engineering , vol.13 , Issue.3 , pp. 241-258
    • Parida, A.1    Chattopadhyay, G.2
  • 4
    • 84862019331 scopus 로고    scopus 로고
    • The application of performance measurement in the service quality concept: The case of Greek service organization
    • Zisis, P.; Garefalakis, A. & Sariannidis, N. The application of performance measurement in the service quality concept: The case of Greek service organization. J. Money, Investment Banking, 2009, 9, 21-47.
    • (2009) J. Money, Investment Banking , vol.9 , pp. 21-47
    • Zisis, P.1    Garefalakis, A.2    Sariannidis, N.3
  • 5
    • 33746889023 scopus 로고    scopus 로고
    • Preventive effect of optimal replacement policies
    • DOI 10.1108/13552510610685101
    • Jiang, R.; Ji, P. & Tsang, A.H.C. Methodology and theory: Preventive effect of optimal replacement policies. J. Quality Maint. Engg., 2006, 12(3), 267-74. (Pubitemid 44200061)
    • (2006) Journal of Quality in Maintenance Engineering , vol.12 , Issue.3 , pp. 267-274
    • Jiang, R.1    Ji, P.2    Tsang, A.H.C.3
  • 6
    • 0036623453 scopus 로고    scopus 로고
    • Integrated performance measurement design: Insights from an application in aircraft maintenance
    • Rouse, P.; Putterill, M. & Ryan, D. Integrated performance measurement design: Insights from an application in aircraft maintenance. Manag. Accoun. Res., 2000, 13, 229-48.
    • (2000) Manag. Accoun. Res. , vol.13 , pp. 229-248
    • Rouse, P.1    Putterill, M.2    Ryan, D.3
  • 7
    • 0035906314 scopus 로고    scopus 로고
    • Linking maintenance strategies to performance
    • DOI 10.1016/S0925-5273(00)00067-0, PII S0925527300000670
    • Swanson, L. Linking maintenance strategies to performance. Int. J. Prod. Eco., 2001, 70(3), 237-44. (Pubitemid 32272152)
    • (2001) International Journal of Production Economics , vol.70 , Issue.3 , pp. 237-244
    • Swanson, L.1
  • 8
    • 77957564892 scopus 로고    scopus 로고
    • Multi-echelon repair inventory systems: Select issues in modular electronic equipment
    • Garg, A. & Deshmukh, S.G. Multi-echelon repair inventory systems: Select issues in modular electronic equipment. Def. Sc. J., 2010, 60(5), 514-24.
    • (2010) Def. Sc. J. , vol.60 , Issue.5 , pp. 514-524
    • Garg, A.1    Deshmukh, S.G.2
  • 9
    • 77957602397 scopus 로고    scopus 로고
    • Expert knowledge base to support maintenance of a radar system
    • Duer, S. Expert knowledge base to support maintenance of a radar system. Def. Sc. J., 2010, 60(5), 531-40.
    • (2010) Def. Sc. J. , vol.60 , Issue.5 , pp. 531-540
    • Duer, S.1
  • 10
    • 79952096757 scopus 로고    scopus 로고
    • Minimisation of non-periodic preventive maintenance cost in series-parallel systems
    • Wang, C & Lin, T. Minimisation of non-periodic preventive maintenance cost in series-parallel systems. Def. Sc. J., 2011, 61(1), 44-50.
    • (2011) Def. Sc. J. , vol.61 , Issue.1 , pp. 44-50
    • Wang, C.1    Lin, T.2
  • 12
    • 0036638313 scopus 로고    scopus 로고
    • An analysis of the effect of a reliability paradigm shift on leading british aerospace companies
    • Jones, J. A. & Warrington, L. An analysis of the effect of a reliability paradigm shift on leading british aerospace companies. Quality Rel. Engg. Int., 2002, 18, 285-92.
    • (2002) Quality Rel. Engg. Int. , vol.18 , pp. 285-292
    • Jones, J.A.1    Warrington, L.2
  • 13
    • 33847653266 scopus 로고    scopus 로고
    • Reliability improvement through alternative designs-A case study
    • DOI 10.1016/j.ress.2006.05.008, PII S0951832006001190
    • Kumar, S. Chattopadhyay, G. & Kumar, U. Reliability improvement through alternative designs : A case study. Rel. Engg. Sys. Safety, 2007, 92, 983-91. (Pubitemid 46350834)
    • (2007) Reliability Engineering and System Safety , vol.92 , Issue.7 , pp. 983-991
    • Kumar, S.1    Chattopadhyay, G.2    Kumar, U.3
  • 15
    • 0037259264 scopus 로고    scopus 로고
    • New concept for aircraft maintenance management (II) : The establishment of the spoon-shaped curve model
    • Qi, Y. Zhigang, L. & Bifeng, S. New concept for aircraft maintenance management (II) : The establishment of the spoon-shaped curve model. In Proceedings of Annual Reliability Maintenance Symposium, 2003. pp. 68-73.
    • (2003) Proceedings of Annual Reliability Maintenance Symposium , pp. 68-73
    • Qi, Y.1    Zhigang, L.2    Bifeng, S.3
  • 16
    • 33750731956 scopus 로고    scopus 로고
    • Searching for multiobjective preventive maintenance schedules: Combining preferences with evolutionary algorithms
    • DOI 10.1016/j.ejor.2005.12.015, PII S0377221705008477
    • Quan, G. Greenwood, G.W. Liu, D. & Hu, S. Searching for multi objective preventive maintenance schedules: Combining preferences with evolutionary algorithms. Euro. J. Oper. Res., 2007, 177(3), 1969-984. (Pubitemid 44709462)
    • (2007) European Journal of Operational Research , vol.177 , Issue.3 , pp. 1969-1984
    • Quan, G.1    Greenwood, G.W.2    Liu, D.3    Hu, S.4
  • 17
    • 0037213213 scopus 로고    scopus 로고
    • An optimization model for aircraft maintenance scheduling and re-assignment
    • DOI 10.1016/S0965-8564(02)00004-6, PII S0965856402000046
    • Sriram, C. & Haghani, A. An optimization model for aircraft maintenance scheduling and re-assignment. Transportation Res. Pt. A, 2003, 37, 29-48. (Pubitemid 36000195)
    • (2003) Transportation Research Part A: Policy and Practice , vol.37 , Issue.1 , pp. 29-48
    • Sriram, C.1    Haghani, A.2
  • 20
    • 70349611286 scopus 로고    scopus 로고
    • Action research for practicing managers
    • French, S. Action research for practicing managers. J. Mgmt. Develop., 2009, 28(3), 187-204.
    • (2009) J. Mgmt. Develop. , vol.28 , Issue.3 , pp. 187-204
    • French, S.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.