메뉴 건너뛰기




Volumn 92, Issue 7, 2007, Pages 983-991

Reliability improvement through alternative designs-A case study

Author keywords

Cost estimation; Design changes; Down time; Reliability improvement

Indexed keywords

COMPETITIVE INTELLIGENCE; ELECTROMAGNETIC FIELDS; GRINDING MACHINES; LARGE SCALE SYSTEMS; QUALITY CONTROL;

EID: 33847653266     PISSN: 09518320     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.ress.2006.05.008     Document Type: Article
Times cited : (28)

References (21)
  • 6
    • 33847620992 scopus 로고    scopus 로고
    • Kumar S, Chattopadhyay G, Kumar U, Kumar K. Application of design changes for improvement of system reliability-a case study. Comadem-2005. Cranfield, UK. 2005. August-September. p. 83-92.
  • 7
    • 4644231050 scopus 로고    scopus 로고
    • Component reliability, replacement and cost analysis with incomplete failure data
    • Blischke W.R., and Murthy D.N.P. (Eds), Wiley, NJ
    • Hastings N.A.J. Component reliability, replacement and cost analysis with incomplete failure data. In: Blischke W.R., and Murthy D.N.P. (Eds). Case studies in reliability and maintenance (2003), Wiley, NJ 353-375
    • (2003) Case studies in reliability and maintenance , pp. 353-375
    • Hastings, N.A.J.1
  • 8
    • 84937650085 scopus 로고
    • Learning curve approach to reliability monitoring
    • Duane J.T. Learning curve approach to reliability monitoring. IEEE Trans Aerospace 2 2 (1964) 563-566
    • (1964) IEEE Trans Aerospace , vol.2 , Issue.2 , pp. 563-566
    • Duane, J.T.1
  • 11
    • 0026473380 scopus 로고
    • Reliability analysis of hydraulic systems of LHD machines using the power law process model
    • Kumar U., Klefsjö B., and Granholm S. Reliability analysis of hydraulic systems of LHD machines using the power law process model. Reliab Eng Syst Saf 35 3 (1992) 217-224
    • (1992) Reliab Eng Syst Saf , vol.35 , Issue.3 , pp. 217-224
    • Kumar, U.1    Klefsjö, B.2    Granholm, S.3
  • 13
    • 4344691143 scopus 로고    scopus 로고
    • Weibull model selection for reliability modelling
    • Murthy D.N.P., Bulmer M., and Eccleston J.A. Weibull model selection for reliability modelling. Reliab Eng Syst Saf 86 3 (2004) 257-267
    • (2004) Reliab Eng Syst Saf , vol.86 , Issue.3 , pp. 257-267
    • Murthy, D.N.P.1    Bulmer, M.2    Eccleston, J.A.3
  • 16
    • 0031555843 scopus 로고    scopus 로고
    • The Weibull renewal function for moderate to large arguments
    • Constantine A.G., and Robinson N.I. The Weibull renewal function for moderate to large arguments. Comput Stat Data Anal 24 1 (1997) 9-27
    • (1997) Comput Stat Data Anal , vol.24 , Issue.1 , pp. 9-27
    • Constantine, A.G.1    Robinson, N.I.2
  • 17
    • 0034701842 scopus 로고    scopus 로고
    • Warranty cost analysis for second-hand products
    • Chattopadhyay G.N., and Murthy D.N.P. Warranty cost analysis for second-hand products. Math Comput Modell 31 10-12 (2000) 81-88
    • (2000) Math Comput Modell , vol.31 , Issue.10-12 , pp. 81-88
    • Chattopadhyay, G.N.1    Murthy, D.N.P.2
  • 18
    • 0022540597 scopus 로고
    • Cost benefit and reliability assessment of electrical generating systems
    • Allan R.N., Shaalan A.M., and Ochoa J.R. Cost benefit and reliability assessment of electrical generating systems. Reliab Eng 15 1 (1986) 1-19
    • (1986) Reliab Eng , vol.15 , Issue.1 , pp. 1-19
    • Allan, R.N.1    Shaalan, A.M.2    Ochoa, J.R.3
  • 21
    • 33847626155 scopus 로고    scopus 로고
    • Abernethy RB. The new Weibull handbook, 4th ed. Florida: 2003.


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.