메뉴 건너뛰기




Volumn 24, Issue 1, 2012, Pages 66-80

Constraint-based local search for inventory control under stochastic demand and lead time

Author keywords

Constraint based local search; Demand uncertainty; Heuristics; Inventory control; Supplier lead time uncertainty

Indexed keywords

CONSTRAINT PROGRAMMING; CONSTRAINT-BASED; COORDINATE DESCENT; DEMAND UNCERTAINTY; EXACT APPROACH; HEURISTICS; HYBRID ALGORITHMS; LEADTIME; LOCAL SEARCH; LOCAL SEARCH STRATEGY; MULTI-PERIOD; NEAR-OPTIMAL POLICIES; NONSTATIONARY; NUMERICAL EXPERIMENTS; OPTIMAL SOLUTIONS; REPLENISHMENT CYCLE; RUNTIMES; SERVICE LEVEL CONSTRAINT; SOLUTION QUALITY; STOCHASTIC DEMAND;

EID: 84862001464     PISSN: 10919856     EISSN: 15265528     Source Type: Journal    
DOI: 10.1287/ijoc.1100.0434     Document Type: Article
Times cited : (11)

References (46)
  • 3
    • 70449598111 scopus 로고    scopus 로고
    • Dynamic re-order point inventory control with lead-time uncertainty: Analysis and empirical investigation
    • Babaï, M. Z., A. Syntetos, Y. Z. Dallery K. Nikolopoulos. 2009. Dynamic re-order point inventory control with lead-time uncertainty: Analysis and empirical investigation. Internat. J. Production Res. 47 (9) 2461-2483.
    • (2009) Internat. J. Production Res. , vol.47 , Issue.9 , pp. 2461-2483
    • Babaï, M.Z.1    Syntetos, A.2    Dallery, Y.Z.3    Nikolopoulos, K.4
  • 4
    • 0032290624 scopus 로고    scopus 로고
    • Optimization of (s, S) inventory systems with random lead times and a service level constraint
    • Bashyam, S., M. C. Fu. 1998. Optimization of (s, S) inventory systems with random lead times and a service level constraint. Management Sci. 44 (12, Part 2) 243-256.
    • (1998) Management Sci. , vol.44 , Issue.2-12 PART , pp. 243-256
    • Bashyam, S.1    Fu, M.C.2
  • 5
    • 0002668750 scopus 로고
    • Lot sizing procedures for requirements planning systems: A framework for analysis
    • Berry, W. L. 1972. Lot sizing procedures for requirements planning systems: A framework for analysis. Production Inventory Management J. 13 (2) 19-34.
    • (1972) Production Inventory Management J. , vol.13 , Issue.2 , pp. 19-34
    • Berry, W.L.1
  • 7
    • 0344236266 scopus 로고    scopus 로고
    • Metaheuristics in combinatorial optimization: Overview and conceptual comparison
    • Blum, C, A. Roli. 2003. Metaheuristics in combinatorial optimization: Overview and conceptual comparison. ACM Comput. Surveys 35 (3) 268-308.
    • (2003) ACM Comput. Surveys , vol.35 , Issue.3 , pp. 268-308
    • Blum, C.1    Roli, A.2
  • 8
    • 0001049772 scopus 로고
    • Strategies for the probabilistic lotsizing problem with service-level constraints
    • Bookbinder, J. H., J. Y Tan. 1988. Strategies for the probabilistic lotsizing problem with service-level constraints. Management Sci. 34 (9) 1096-1108.
    • (1988) Management Sci. , vol.34 , Issue.9 , pp. 1096-1108
    • Bookbinder, J.H.1    Tan, J.Y.2
  • 9
    • 84949940148 scopus 로고    scopus 로고
    • A constraint-based architecture for flexible support to activity scheduling
    • *IA 2001: Advances in Artificial Intelligence
    • Cesta, A., G. Cortellessa, A. Oddi, N. Policella, A. Susi. 2001. A constraint-based architecture for flexible support to activity scheduling. AI*IA 01: Proc. 7th Congress Italian Assoc. Artificial Intelligence Adv. Artificial Intelligence, Springer-Verlag, London, 369-381. (Pubitemid 33340116)
    • (2001) Lecture Notes in Computer Science , Issue.2175 , pp. 369-381
    • Cesta, A.1    Cortellessa, G.2    Oddi, A.3    Policella, N.4    Susi, A.5
  • 10
    • 0002395681 scopus 로고
    • Chance-constrained programming
    • Charnes, A., W. W. Cooper. 1959. Chance-constrained programming. Management Sci. 6 (1) 73-79.
    • (1959) Management Sci. , vol.6 , Issue.1 , pp. 73-79
    • Charnes, A.1    Cooper, W.W.2
  • 11
    • 0034272145 scopus 로고    scopus 로고
    • Solving vehicle routing problems using constraint programming and metaheuristics
    • De Backer, B., V. Furnon, P. Shaw, P. Kilby P. Prosser. 2000. Solving vehicle routing problems using constraint programming and metaheuristics. J. Heuristics 6 (4) 501-523.
    • (2000) J. Heuristics , vol.6 , Issue.4 , pp. 501-523
    • De Backer, B.1    Furnon, V.2    Shaw, P.3    Kilby, P.4    Prosser, P.5
  • 13
    • 0031271989 scopus 로고    scopus 로고
    • Nervousness in inventory management: Comparison of basic control rules
    • PII S037722179600255X
    • de Kok, T, K. Inderfurth. 1997. Nervousness in inventory management: Comparison of basic control rules. Eur. J. Oper. Res. 103 (1) 55-82. (Pubitemid 127396730)
    • (1997) European Journal of Operational Research , vol.103 , Issue.1 , pp. 55-82
    • De Kok, T.1    Inderfurth, K.2
  • 14
    • 0008299369 scopus 로고
    • Determining safety stock in the presence of stochastic lead time and demand
    • Eppen, G. D., R. K. Martin. 1988. Determining safety stock in the presence of stochastic lead time and demand. Management Sci. 34 (11) 1380-1390.
    • (1988) Management Sci. , vol.34 , Issue.11 , pp. 1380-1390
    • Eppen, G.D.1    Martin, R.K.2
  • 15
    • 0345075198 scopus 로고    scopus 로고
    • Local search and constraint programming
    • F. Glover, G. Kochenberger, eds, International Series in Operations Research and Management Science, Kluwer Academic Publishers, Norwell, MA
    • Focacci, F., F. Laburthe, A. Lodi. 2002. Local search and constraint programming. F. Glover, G. Kochenberger, eds. Handbook of Metaheuristics. International Series in Operations Research and Management Science, Vol. 57. Kluwer Academic Publishers, Norwell, MA, 369-403.
    • (2002) Handbook of Metaheuristics , vol.57 , pp. 369-403
    • Focacci, F.1    Laburthe, F.2    Lodi, A.3
  • 21
    • 77955466745 scopus 로고
    • Balancing accuracy and simplicity in determining reorder points
    • Hunt, J. A. 1965. Balancing accuracy and simplicity in determining reorder points. Management Sci. 12 (4) B94-B103.
    • (1965) Management Sci. , vol.12 , Issue.4
    • Hunt, J.A.1
  • 23
    • 0011700586 scopus 로고
    • A dynamic inventory model with stochastic lead times
    • Kaplan, R. S. 1970. A dynamic inventory model with stochastic lead times. Management Sci. 16 (7) 491-507.
    • (1970) Management Sci. , vol.16 , Issue.7 , pp. 491-507
    • Kaplan, R.S.1
  • 25
    • 0021197476 scopus 로고
    • Dynamic lot-size model with stochastic lead times
    • Nevison, C, M. Burstein. 1984. The dynamic lot-size model with stochastic lead times. Management Sci. 30 (1) 100-109. (Pubitemid 14531744)
    • (1984) Management Science , vol.30 , Issue.1 , pp. 100-109
    • Nevison, C.1    Burstein, M.2
  • 27
    • 84957889890 scopus 로고    scopus 로고
    • A view of local search in constraint programming
    • Principles and Practice of Constraint Programming - CP96
    • Pesant, G., M. Gendreau. 1996. A view of local search in constraint programming. E. C. Freuder, ed. Proc. 2nd Internat. Conf. Principles and Practice of Constraint Programming. Lecture Notes in Computer Science, Vol. 1118. Springer, Berlin, 353-366. (Pubitemid 126117714)
    • (1996) Lecture Notes in Computer Science , Issue.1118 , pp. 353-366
    • Pesant, G.1    Gendreau, M.2
  • 28
    • 0028567611 scopus 로고
    • A filtering algorithm for constraints of difference in csps
    • American Association for Artificial Intelligence, Menlo Park, CA
    • Régin, J.-C. 1994. A filtering algorithm for constraints of difference in csps. Proc. 12th National Conf. Artificial Intelligence, Seattle, Vol. 1. American Association for Artificial Intelligence, Menlo Park, CA, 362-367.
    • (1994) Proc. 12th National Conf. Artificial Intelligence, Seattle , vol.1 , pp. 362-367
    • Régin, J.-C.1
  • 29
    • 38549181265 scopus 로고    scopus 로고
    • Constraints and integer programming combined
    • M. Milano, ed, Kluwer Academic Publishers, Norwell, MA
    • Régin, J.-C. 2003. Constraints and integer programming combined. M. Milano, ed. Global Constraints and Filtering Algorithms. Kluwer Academic Publishers, Norwell, MA, 89-129.
    • (2003) Global Constraints and Filtering Algorithms , pp. 89-129
    • Régin, J.-C.1
  • 30
    • 33748755349 scopus 로고    scopus 로고
    • Inventory order crossovers
    • DOI 10.1016/j.ijpe.2004.11.011, PII S0925527304004402
    • Riezebos, J. 2006. Inventory order crossovers. Internat. J. Production Econom. 104 (2) 666-675. (Pubitemid 44403062)
    • (2006) International Journal of Production Economics , vol.104 , Issue.2 , pp. 666-675
    • Riezebos, J.1
  • 32
    • 52949121426 scopus 로고    scopus 로고
    • A global chanceconstraint for stochastic inventory systems under service level constraints
    • Rossi, R., S. A. Tarim, B. Hnich, S. Prestwich. 2008. A global chanceconstraint for stochastic inventory systems under service level constraints. Constraints 13 (4) 490-517.
    • (2008) Constraints , vol.13 , Issue.4 , pp. 490-517
    • Rossi, R.1    Tarim, S.A.2    Hnich, B.3    Prestwich, S.4
  • 33
    • 77955472084 scopus 로고    scopus 로고
    • Computing the non-stationary replenishment cycle inventory policy under stochastic supplier lead-times
    • Rossi, R., S. A. Tarim, B. Hnich, S. Prestwich. 2010. Computing the non-stationary replenishment cycle inventory policy under stochastic supplier lead-times. Internat. J. Production Econom. 127 (1) 180-189.
    • (2010) Internat. J. Production Econom. , vol.127 , Issue.1 , pp. 180-189
    • Rossi, R.1    Tarim, S.A.2    Hnich, B.3    Prestwich, S.4
  • 34
    • 79958191845 scopus 로고    scopus 로고
    • A state space augmentation algorithm for the replenishment cycle inventory policy
    • Rossi, R., S. A. Tarim, B. Hnich, S. Prestwich. 2011. A state space augmentation algorithm for the replenishment cycle inventory policy. Internat. J. Production Econom. 133 (1) 377-384.
    • (2011) Internat. J. Production Econom. , vol.133 , Issue.1 , pp. 377-384
    • Rossi, R.1    Tarim, S.A.2    Hnich, B.3    Prestwich, S.4
  • 36
    • 5244340933 scopus 로고
    • Demand and lead-time uncertainty: The impacts of physical distribution performance and management
    • Speh, T. W, G. Wagenheim. 1978. Demand and lead-time uncertainty: The impacts of physical distribution performance and management. J. Bus. Logist. 1 (1) 95-113.
    • (1978) J. Bus. Logist , vol.1 , Issue.1 , pp. 95-113
    • Speh, T.W.1    Wagenheim, G.2
  • 37
    • 33745813950 scopus 로고    scopus 로고
    • Perspectives in supply chain risk management
    • DOI 10.1016/j.ijpe.2005.12.006, PII S0925527306000405
    • Tang, C. S. 2006. Perpectives in supply chain risk management. Internat. J. Production Econom. 103 (2) 451-488. (Pubitemid 44038496)
    • (2006) International Journal of Production Economics , vol.103 , Issue.2 , pp. 451-488
    • Tang, C.S.1
  • 39
    • 0742266961 scopus 로고    scopus 로고
    • The stochastic dynamic production/inventory lot-sizing problem with service-level constraints
    • Tarim, S. A., B. G. Kingsman. 2004. The stochastic dynamic production/inventory lot-sizing problem with service-level constraints. Internat. J. Production Econom. 88 (1) 105-119.
    • (2004) Internat. J. Production Econom. , vol.88 , Issue.1 , pp. 105-119
    • Tarim, S.A.1    Kingsman, B.G.2
  • 40
    • 33845251345 scopus 로고    scopus 로고
    • n) policies for inventory systems with non-stationary stochastic demand
    • DOI 10.1016/j.ejor.2005.01.053, PII S0377221705002079
    • Tarim, S. A., B. G. Kingsman. 2006. Modelling and computing (Rn, Sn) policies for inventory systems with non-stationary stochastic demand. Eur. J. Oper. Res. 174 (1) 581-599. (Pubitemid 44866833)
    • (2006) European Journal of Operational Research , vol.174 , Issue.1 , pp. 581-599
    • Tarim, S.A.1    Kingsman, B.G.2
  • 41
    • 40849133916 scopus 로고    scopus 로고
    • Constraint programming for computing non-stationary (R, S) inventory policies
    • DOI 10.1016/j.ejor.2006.11.048, PII S0377221707006728
    • Tarim, S. A., B. Smith. 2008. Constraint programming for computing non-stationary (R, S) inventory policies. Eur. J. Oper. Res. 189 (3) 1004-1021. (Pubitemid 351400591)
    • (2008) European Journal of Operational Research , vol.189 , Issue.3 , pp. 1004-1021
    • Tarim, S.A.1    Smith, B.M.2
  • 42
    • 33645738856 scopus 로고    scopus 로고
    • Stochastic constraint programming: A scenario-based approach
    • Tarim, S. A., S. Manandhar, T. Walsh. 2006. Stochastic constraint programming: A scenario-based approach. Constraints 11 (1) 53-80.
    • (2006) Constraints , vol.11 , Issue.1 , pp. 53-80
    • Tarim, S.A.1    Manandhar, S.2    Walsh, T.3
  • 43
    • 62949169326 scopus 로고    scopus 로고
    • Cost-based filtering techniques for stochastic inventory control under service level constraints
    • Tarim, S. A., B. Hnich, R. Rossi, S. Prestwich. 2009. Cost-based filtering techniques for stochastic inventory control under service level constraints. Constraints 14 (2) 137-176.
    • (2009) Constraints , vol.14 , Issue.2 , pp. 137-176
    • Tarim, S.A.1    Hnich, B.2    Rossi, R.3    Prestwich, S.4
  • 44
    • 33847293780 scopus 로고    scopus 로고
    • On the stochastic uncapacitated dynamic single-item lotsizing problem with service level constraints
    • Tempelmeier, H. 2007. On the stochastic uncapacitated dynamic single-item lotsizing problem with service level constraints. Eur. J. Oper. Res. 181 (1) 184-194.
    • (2007) Eur. J. Oper. Res. , vol.181 , Issue.1 , pp. 184-194
    • Tempelmeier, H.1
  • 45
    • 84989412809 scopus 로고
    • Material requirements planning under uncertainty
    • Whybark, D. C, J. G. Williams. 1976. Material requirements planning under uncertainty. Decision Sci. 7 (4) 595-606.
    • (1976) Decision Sci. , vol.7 , Issue.4 , pp. 595-606
    • Whybark, D.C.1    Williams, J.G.2
  • 46
    • 0022810192 scopus 로고
    • Stochastic leadtimes in continuous-time inventory models
    • Zipkin, P. 1986. Stochastic leadtimes in continuous-time inventory models. Naval Res. Logist. Quart. 33 (4) 763-774. (Pubitemid 17467101)
    • (1986) Naval research logistics quarterly , vol.33 , Issue.4 , pp. 763-774
    • Zipkin, P.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.