-
3
-
-
70449598111
-
Dynamic re-order point inventory control with lead-time uncertainty: Analysis and empirical investigation
-
Babaï, M. Z., A. Syntetos, Y. Z. Dallery K. Nikolopoulos. 2009. Dynamic re-order point inventory control with lead-time uncertainty: Analysis and empirical investigation. Internat. J. Production Res. 47 (9) 2461-2483.
-
(2009)
Internat. J. Production Res.
, vol.47
, Issue.9
, pp. 2461-2483
-
-
Babaï, M.Z.1
Syntetos, A.2
Dallery, Y.Z.3
Nikolopoulos, K.4
-
4
-
-
0032290624
-
Optimization of (s, S) inventory systems with random lead times and a service level constraint
-
Bashyam, S., M. C. Fu. 1998. Optimization of (s, S) inventory systems with random lead times and a service level constraint. Management Sci. 44 (12, Part 2) 243-256.
-
(1998)
Management Sci.
, vol.44
, Issue.2-12 PART
, pp. 243-256
-
-
Bashyam, S.1
Fu, M.C.2
-
5
-
-
0002668750
-
Lot sizing procedures for requirements planning systems: A framework for analysis
-
Berry, W. L. 1972. Lot sizing procedures for requirements planning systems: A framework for analysis. Production Inventory Management J. 13 (2) 19-34.
-
(1972)
Production Inventory Management J.
, vol.13
, Issue.2
, pp. 19-34
-
-
Berry, W.L.1
-
7
-
-
0344236266
-
Metaheuristics in combinatorial optimization: Overview and conceptual comparison
-
Blum, C, A. Roli. 2003. Metaheuristics in combinatorial optimization: Overview and conceptual comparison. ACM Comput. Surveys 35 (3) 268-308.
-
(2003)
ACM Comput. Surveys
, vol.35
, Issue.3
, pp. 268-308
-
-
Blum, C.1
Roli, A.2
-
8
-
-
0001049772
-
Strategies for the probabilistic lotsizing problem with service-level constraints
-
Bookbinder, J. H., J. Y Tan. 1988. Strategies for the probabilistic lotsizing problem with service-level constraints. Management Sci. 34 (9) 1096-1108.
-
(1988)
Management Sci.
, vol.34
, Issue.9
, pp. 1096-1108
-
-
Bookbinder, J.H.1
Tan, J.Y.2
-
9
-
-
84949940148
-
A constraint-based architecture for flexible support to activity scheduling
-
*IA 2001: Advances in Artificial Intelligence
-
Cesta, A., G. Cortellessa, A. Oddi, N. Policella, A. Susi. 2001. A constraint-based architecture for flexible support to activity scheduling. AI*IA 01: Proc. 7th Congress Italian Assoc. Artificial Intelligence Adv. Artificial Intelligence, Springer-Verlag, London, 369-381. (Pubitemid 33340116)
-
(2001)
Lecture Notes in Computer Science
, Issue.2175
, pp. 369-381
-
-
Cesta, A.1
Cortellessa, G.2
Oddi, A.3
Policella, N.4
Susi, A.5
-
10
-
-
0002395681
-
Chance-constrained programming
-
Charnes, A., W. W. Cooper. 1959. Chance-constrained programming. Management Sci. 6 (1) 73-79.
-
(1959)
Management Sci.
, vol.6
, Issue.1
, pp. 73-79
-
-
Charnes, A.1
Cooper, W.W.2
-
11
-
-
0034272145
-
Solving vehicle routing problems using constraint programming and metaheuristics
-
De Backer, B., V. Furnon, P. Shaw, P. Kilby P. Prosser. 2000. Solving vehicle routing problems using constraint programming and metaheuristics. J. Heuristics 6 (4) 501-523.
-
(2000)
J. Heuristics
, vol.6
, Issue.4
, pp. 501-523
-
-
De Backer, B.1
Furnon, V.2
Shaw, P.3
Kilby, P.4
Prosser, P.5
-
12
-
-
84862009435
-
-
Department of Economics, Tilburg University, Tilburg, The Netherlands
-
de Kok, A. G. 1991. Basics of inventory management: Part 2: The (R, S)-model. Research Memorandum FEW 521, Department of Economics, Tilburg University, Tilburg, The Netherlands.
-
(1991)
Basics of Inventory Management: Part 2: The (R, S)-model. Research Memorandum FEW
, vol.521
-
-
De Kok, A.G.1
-
13
-
-
0031271989
-
Nervousness in inventory management: Comparison of basic control rules
-
PII S037722179600255X
-
de Kok, T, K. Inderfurth. 1997. Nervousness in inventory management: Comparison of basic control rules. Eur. J. Oper. Res. 103 (1) 55-82. (Pubitemid 127396730)
-
(1997)
European Journal of Operational Research
, vol.103
, Issue.1
, pp. 55-82
-
-
De Kok, T.1
Inderfurth, K.2
-
14
-
-
0008299369
-
Determining safety stock in the presence of stochastic lead time and demand
-
Eppen, G. D., R. K. Martin. 1988. Determining safety stock in the presence of stochastic lead time and demand. Management Sci. 34 (11) 1380-1390.
-
(1988)
Management Sci.
, vol.34
, Issue.11
, pp. 1380-1390
-
-
Eppen, G.D.1
Martin, R.K.2
-
15
-
-
0345075198
-
Local search and constraint programming
-
F. Glover, G. Kochenberger, eds, International Series in Operations Research and Management Science, Kluwer Academic Publishers, Norwell, MA
-
Focacci, F., F. Laburthe, A. Lodi. 2002. Local search and constraint programming. F. Glover, G. Kochenberger, eds. Handbook of Metaheuristics. International Series in Operations Research and Management Science, Vol. 57. Kluwer Academic Publishers, Norwell, MA, 369-403.
-
(2002)
Handbook of Metaheuristics
, vol.57
, pp. 369-403
-
-
Focacci, F.1
Laburthe, F.2
Lodi, A.3
-
16
-
-
84957361605
-
Cost-based domain filtering
-
Lecture Notes in Computer Science, Springer, Berlin
-
Focacci, F., A. Lodi, M. Milano. 1999. Cost-based domain filtering. Principles and Practice of Constraint Programming: Fifth International Conference. Lecture Notes in Computer Science, Vol. 1713. Springer, Berlin, 189-203.
-
(1999)
Principles and Practice of Constraint Programming: Fifth International Conference
, vol.1713
, pp. 189-203
-
-
Focacci, F.1
Lodi, A.2
Milano, M.3
-
18
-
-
45249123669
-
On static stochastic order crossover
-
Hayya, J. C, U. Bagchi, J. G. Kim, D. Sun. 2008. On static stochastic order crossover. Internat. J. Production Econom. 114 (1) 404-413.
-
(2008)
Internat. J. Production Econom.
, vol.114
, Issue.1
, pp. 404-413
-
-
Hayya, J.C.1
Bagchi, U.2
Kim, J.G.3
Sun, D.4
-
19
-
-
0010036728
-
Order crossover in inventory systems
-
Hayya, J. C, S. H. Xu, R. V Ramasesh, X. X. He. 1995. Order crossover in inventory systems. Stochastic Models 11 (2) 279-309.
-
(1995)
Stochastic Models
, vol.11
, Issue.2
, pp. 279-309
-
-
Hayya, J.C.1
Xu, S.H.2
Ramasesh, R.V.3
He, X.X.4
-
21
-
-
77955466745
-
Balancing accuracy and simplicity in determining reorder points
-
Hunt, J. A. 1965. Balancing accuracy and simplicity in determining reorder points. Management Sci. 12 (4) B94-B103.
-
(1965)
Management Sci.
, vol.12
, Issue.4
-
-
Hunt, J.A.1
-
23
-
-
0011700586
-
A dynamic inventory model with stochastic lead times
-
Kaplan, R. S. 1970. A dynamic inventory model with stochastic lead times. Management Sci. 16 (7) 491-507.
-
(1970)
Management Sci.
, vol.16
, Issue.7
, pp. 491-507
-
-
Kaplan, R.S.1
-
25
-
-
0021197476
-
Dynamic lot-size model with stochastic lead times
-
Nevison, C, M. Burstein. 1984. The dynamic lot-size model with stochastic lead times. Management Sci. 30 (1) 100-109. (Pubitemid 14531744)
-
(1984)
Management Science
, vol.30
, Issue.1
, pp. 100-109
-
-
Nevison, C.1
Burstein, M.2
-
27
-
-
84957889890
-
A view of local search in constraint programming
-
Principles and Practice of Constraint Programming - CP96
-
Pesant, G., M. Gendreau. 1996. A view of local search in constraint programming. E. C. Freuder, ed. Proc. 2nd Internat. Conf. Principles and Practice of Constraint Programming. Lecture Notes in Computer Science, Vol. 1118. Springer, Berlin, 353-366. (Pubitemid 126117714)
-
(1996)
Lecture Notes in Computer Science
, Issue.1118
, pp. 353-366
-
-
Pesant, G.1
Gendreau, M.2
-
28
-
-
0028567611
-
A filtering algorithm for constraints of difference in csps
-
American Association for Artificial Intelligence, Menlo Park, CA
-
Régin, J.-C. 1994. A filtering algorithm for constraints of difference in csps. Proc. 12th National Conf. Artificial Intelligence, Seattle, Vol. 1. American Association for Artificial Intelligence, Menlo Park, CA, 362-367.
-
(1994)
Proc. 12th National Conf. Artificial Intelligence, Seattle
, vol.1
, pp. 362-367
-
-
Régin, J.-C.1
-
29
-
-
38549181265
-
Constraints and integer programming combined
-
M. Milano, ed, Kluwer Academic Publishers, Norwell, MA
-
Régin, J.-C. 2003. Constraints and integer programming combined. M. Milano, ed. Global Constraints and Filtering Algorithms. Kluwer Academic Publishers, Norwell, MA, 89-129.
-
(2003)
Global Constraints and Filtering Algorithms
, pp. 89-129
-
-
Régin, J.-C.1
-
30
-
-
33748755349
-
Inventory order crossovers
-
DOI 10.1016/j.ijpe.2004.11.011, PII S0925527304004402
-
Riezebos, J. 2006. Inventory order crossovers. Internat. J. Production Econom. 104 (2) 666-675. (Pubitemid 44403062)
-
(2006)
International Journal of Production Economics
, vol.104
, Issue.2
, pp. 666-675
-
-
Riezebos, J.1
-
32
-
-
52949121426
-
A global chanceconstraint for stochastic inventory systems under service level constraints
-
Rossi, R., S. A. Tarim, B. Hnich, S. Prestwich. 2008. A global chanceconstraint for stochastic inventory systems under service level constraints. Constraints 13 (4) 490-517.
-
(2008)
Constraints
, vol.13
, Issue.4
, pp. 490-517
-
-
Rossi, R.1
Tarim, S.A.2
Hnich, B.3
Prestwich, S.4
-
33
-
-
77955472084
-
Computing the non-stationary replenishment cycle inventory policy under stochastic supplier lead-times
-
Rossi, R., S. A. Tarim, B. Hnich, S. Prestwich. 2010. Computing the non-stationary replenishment cycle inventory policy under stochastic supplier lead-times. Internat. J. Production Econom. 127 (1) 180-189.
-
(2010)
Internat. J. Production Econom.
, vol.127
, Issue.1
, pp. 180-189
-
-
Rossi, R.1
Tarim, S.A.2
Hnich, B.3
Prestwich, S.4
-
34
-
-
79958191845
-
A state space augmentation algorithm for the replenishment cycle inventory policy
-
Rossi, R., S. A. Tarim, B. Hnich, S. Prestwich. 2011. A state space augmentation algorithm for the replenishment cycle inventory policy. Internat. J. Production Econom. 133 (1) 377-384.
-
(2011)
Internat. J. Production Econom.
, vol.133
, Issue.1
, pp. 377-384
-
-
Rossi, R.1
Tarim, S.A.2
Hnich, B.3
Prestwich, S.4
-
36
-
-
5244340933
-
Demand and lead-time uncertainty: The impacts of physical distribution performance and management
-
Speh, T. W, G. Wagenheim. 1978. Demand and lead-time uncertainty: The impacts of physical distribution performance and management. J. Bus. Logist. 1 (1) 95-113.
-
(1978)
J. Bus. Logist
, vol.1
, Issue.1
, pp. 95-113
-
-
Speh, T.W.1
Wagenheim, G.2
-
37
-
-
33745813950
-
Perspectives in supply chain risk management
-
DOI 10.1016/j.ijpe.2005.12.006, PII S0925527306000405
-
Tang, C. S. 2006. Perpectives in supply chain risk management. Internat. J. Production Econom. 103 (2) 451-488. (Pubitemid 44038496)
-
(2006)
International Journal of Production Economics
, vol.103
, Issue.2
, pp. 451-488
-
-
Tang, C.S.1
-
39
-
-
0742266961
-
The stochastic dynamic production/inventory lot-sizing problem with service-level constraints
-
Tarim, S. A., B. G. Kingsman. 2004. The stochastic dynamic production/inventory lot-sizing problem with service-level constraints. Internat. J. Production Econom. 88 (1) 105-119.
-
(2004)
Internat. J. Production Econom.
, vol.88
, Issue.1
, pp. 105-119
-
-
Tarim, S.A.1
Kingsman, B.G.2
-
40
-
-
33845251345
-
n) policies for inventory systems with non-stationary stochastic demand
-
DOI 10.1016/j.ejor.2005.01.053, PII S0377221705002079
-
Tarim, S. A., B. G. Kingsman. 2006. Modelling and computing (Rn, Sn) policies for inventory systems with non-stationary stochastic demand. Eur. J. Oper. Res. 174 (1) 581-599. (Pubitemid 44866833)
-
(2006)
European Journal of Operational Research
, vol.174
, Issue.1
, pp. 581-599
-
-
Tarim, S.A.1
Kingsman, B.G.2
-
41
-
-
40849133916
-
Constraint programming for computing non-stationary (R, S) inventory policies
-
DOI 10.1016/j.ejor.2006.11.048, PII S0377221707006728
-
Tarim, S. A., B. Smith. 2008. Constraint programming for computing non-stationary (R, S) inventory policies. Eur. J. Oper. Res. 189 (3) 1004-1021. (Pubitemid 351400591)
-
(2008)
European Journal of Operational Research
, vol.189
, Issue.3
, pp. 1004-1021
-
-
Tarim, S.A.1
Smith, B.M.2
-
42
-
-
33645738856
-
Stochastic constraint programming: A scenario-based approach
-
Tarim, S. A., S. Manandhar, T. Walsh. 2006. Stochastic constraint programming: A scenario-based approach. Constraints 11 (1) 53-80.
-
(2006)
Constraints
, vol.11
, Issue.1
, pp. 53-80
-
-
Tarim, S.A.1
Manandhar, S.2
Walsh, T.3
-
43
-
-
62949169326
-
Cost-based filtering techniques for stochastic inventory control under service level constraints
-
Tarim, S. A., B. Hnich, R. Rossi, S. Prestwich. 2009. Cost-based filtering techniques for stochastic inventory control under service level constraints. Constraints 14 (2) 137-176.
-
(2009)
Constraints
, vol.14
, Issue.2
, pp. 137-176
-
-
Tarim, S.A.1
Hnich, B.2
Rossi, R.3
Prestwich, S.4
-
44
-
-
33847293780
-
On the stochastic uncapacitated dynamic single-item lotsizing problem with service level constraints
-
Tempelmeier, H. 2007. On the stochastic uncapacitated dynamic single-item lotsizing problem with service level constraints. Eur. J. Oper. Res. 181 (1) 184-194.
-
(2007)
Eur. J. Oper. Res.
, vol.181
, Issue.1
, pp. 184-194
-
-
Tempelmeier, H.1
-
45
-
-
84989412809
-
Material requirements planning under uncertainty
-
Whybark, D. C, J. G. Williams. 1976. Material requirements planning under uncertainty. Decision Sci. 7 (4) 595-606.
-
(1976)
Decision Sci.
, vol.7
, Issue.4
, pp. 595-606
-
-
Whybark, D.C.1
Williams, J.G.2
-
46
-
-
0022810192
-
Stochastic leadtimes in continuous-time inventory models
-
Zipkin, P. 1986. Stochastic leadtimes in continuous-time inventory models. Naval Res. Logist. Quart. 33 (4) 763-774. (Pubitemid 17467101)
-
(1986)
Naval research logistics quarterly
, vol.33
, Issue.4
, pp. 763-774
-
-
Zipkin, P.1
|