메뉴 건너뛰기




Volumn 47, Issue 9, 2009, Pages 2461-2483

Dynamic re-order point inventory control with lead-time uncertainty: Analysis and empirical investigation

Author keywords

Empirical analysis; Forecasting; Lead time demand; Simulation; Stock control

Indexed keywords

CONTROL PARAMETERS; CONTROL POLICY; CYCLE SERVICE LEVEL; DEMAND DATA; EMPIRICAL ANALYSIS; EMPIRICAL INVESTIGATION; EMPIRICAL RESULTS; FORECAST UNCERTAINTY; INVENTORY SYSTEMS; LEAD-TIME DEMAND; LEADTIME; NEW APPROACHES; NON-STATIONARY DEMAND; PHARMACEUTICAL INDUSTRY; SEQUENTIAL PROCEDURES; SIMULATION; SINGLE STAGE; STOCK CONTROL;

EID: 70449598111     PISSN: 00207543     EISSN: 1366588X     Source Type: Journal    
DOI: 10.1080/00207540701666824     Document Type: Article
Times cited : (39)

References (25)
  • 1
    • 0001233812 scopus 로고
    • Improved algorithms for economic lot size problems
    • Aggarwal, A. and Park, J.K., 1993. Improved algorithms for economic lot size problems. Operations Research, 41, 549-571.
    • (1993) Operations Research , vol.41 , pp. 549-571
    • Aggarwal, A.1    Park, J.K.2
  • 3
    • 70449584457 scopus 로고    scopus 로고
    • Dynamic versus static control policies in single stage productioninventory systems
    • (forthcoming)
    • Babaï, M.Z. and Dallery, Y., 2008. Dynamic versus static control policies in single stage productioninventory systems. International Journal of Production Research (forthcoming).
    • (2008) International Journal of Production Research
    • Babaï, M.Z.1    Dallery, Y.2
  • 4
    • 0033872695 scopus 로고    scopus 로고
    • Quantifying the bullwhip effect in a simple supply chain: The impact of forecasting, lead-times, and information
    • Chen, F., Drezner, Z., Ryan, J.K. and Simchi-Levi, D., 2000. Quantifying the bullwhip effect in a simple supply chain: the impact of forecasting, lead-times, and information. Management Science, 46, 436-443.
    • (2000) Management Science , vol.46 , pp. 436-443
    • Chen, F.1    Drezner, Z.2    Ryan, J.K.3    Simchi-Levi, D.4
  • 5
    • 0021198076 scopus 로고
    • (s, S) policies for a dynamic inventory model with stochastic lead-times
    • Ehrhardt, R., 1984. (s, S) policies for a dynamic inventory model with stochastic lead-times. Management Science, 32, 121-132.
    • (1984) Management Science , vol.32 , pp. 121-132
    • Ehrhardt, R.1
  • 6
    • 0008299369 scopus 로고
    • Determining safety stock in the presence of stochastic lead time and demand
    • Eppen, G.D. and Martin, R.K., 1988. Determining safety stock in the presence of stochastic lead time and demand. Management Science, 34, 1380-1390.
    • (1988) Management Science , vol.34 , pp. 1380-1390
    • Eppen, G.D.1    Martin, R.K.2
  • 7
    • 0002455554 scopus 로고    scopus 로고
    • A single-item inventory model for a nonstationary demand process
    • Graves, S.C., 1999. A single-item inventory model for a nonstationary demand process. Manufacturing and Service Operations Management, 1, 50-61.
    • (1999) Manufacturing and Service Operations Management , vol.1 , pp. 50-61
    • Graves, S.C.1
  • 9
    • 0028437967 scopus 로고
    • Modeling the evolution of demand forecasts with application to safety-stock analysis in production/distribution systems
    • Heath, D.C. and Jackson, P.L., 1994. Modeling the evolution of demand forecasts with application to safety-stock analysis in production/distribution systems. IIE Transactions, 26, 17-30.
    • (1994) IIE Transactions , vol.26 , pp. 17-30
    • Heath, D.C.1    Jackson, P.L.2
  • 11
    • 0011700586 scopus 로고
    • A dynamic inventory model with stochastic lead-times
    • Kaplan, R., 1970. A dynamic inventory model with stochastic lead-times. Management Science, 16, 491-507.
    • (1970) Management Science , vol.16 , pp. 491-507
    • Kaplan, R.1
  • 12
    • 0001664917 scopus 로고
    • Dynamic inventory policy with varying stochastic demands
    • Karlin, S., 1960. Dynamic inventory policy with varying stochastic demands. Management Science, 6, 231-258.
    • (1960) Management Science , vol.6 , pp. 231-258
    • Karlin, S.1
  • 13
    • 0031108822 scopus 로고    scopus 로고
    • Information distortion in a supply chain: The bullwhip effect
    • Lee, H.L., Padmanabhan, P. and Whang, S., 1997. Information distortion in a supply chain: the bullwhip effect. Management Science, 43, 546-558.
    • (1997) Management Science , vol.43 , pp. 546-558
    • Lee, H.L.1    Padmanabhan, P.2    Whang, S.3
  • 14
    • 0021197476 scopus 로고
    • The dynamic lot-size model with stochastic lead-times
    • Nevison, C. and Burstein, M., 1984. The dynamic lot-size model with stochastic lead-times. Management Science, 30, 100-109.
    • (1984) Management Science , vol.30 , pp. 100-109
    • Nevison, C.1    Burstein, M.2
  • 15
    • 0002467137 scopus 로고
    • The optimality of (s, S) policies in the dynamic inventory problem
    • Stanford, CA: Stanford University Press
    • Scarf, H., 1959, The optimality of (s, S) policies in the dynamic inventory problem. Mathematical methods in the social sciences. Stanford, CA: Stanford University Press.
    • (1959) Mathematical Methods in the Social Sciences
    • Scarf, H.1
  • 16
    • 0018057838 scopus 로고
    • Inventory control under a probabilistic time-varying, demand pattern
    • Silver, E.A., 1978. Inventory control under a probabilistic time-varying, demand pattern. AIIE Transactions, 10, 371-379.
    • (1978) AIIE Transactions , vol.10 , pp. 371-379
    • Silver, E.A.1
  • 17
    • 5244340933 scopus 로고
    • Demand and lead-time uncertainty: The impacts of physical distribution performance and management
    • Speh, T.W. and Wagenheim, G., 1978. Demand and lead-time uncertainty: the impacts of physical distribution performance and management. Journal of Business Logistics, 1, 95-113.
    • (1978) Journal of Business Logistics , vol.1 , pp. 95-113
    • Speh, T.W.1    Wagenheim, G.2
  • 21
    • 9544249379 scopus 로고    scopus 로고
    • Considering stochastic lead-times in a manufacturing/ remanufacturing system with deterministic demands and return
    • Tang, O. and Grubbström, R.W., 2004. Considering stochastic lead-times in a manufacturing/ remanufacturing system with deterministic demands and return. International Journal of Production Economics, 93-94, 285-300.
    • (2004) International Journal of Production Economics , vol.93-94 , pp. 285-300
    • Tang, O.1    Grubbström, R.W.2
  • 22
    • 0000495984 scopus 로고
    • Economic lot-sizing: An O(n log n) algorithm that runs in linear time in the Wagner-Whitin case
    • Wagelmans, A.P.M., Van Hoesel, C.P.M. and Kolen, A.W.J., 1992. Economic lot-sizing: an O(n log n) algorithm that runs in linear time in the Wagner-Whitin case. Operations Research, 40, 145-156.
    • (1992) Operations Research , vol.40 , pp. 145-156
    • Wagelmans, A.P.M.1    Van Hoesel, C.P.M.2    Kolen, A.W.J.3
  • 23
    • 0001962762 scopus 로고
    • Dynamic version of the economic lot size model
    • Wagner, H.M. and Whitin, T.M., 1958. Dynamic version of the economic lot size model. Management Science, 5, 89-96.
    • (1958) Management Science , vol.5 , pp. 89-96
    • Wagner, H.M.1    Whitin, T.M.2
  • 24
    • 84989412809 scopus 로고
    • Material requirements planning under uncertainty
    • Whybark, D.C and Williams, J.G., 1976. Material requirements planning under uncertainty. Decision Science, 7, 595-606.
    • (1976) Decision Science , vol.7 , pp. 595-606
    • Whybark, D.C.1    Williams, J.G.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.