메뉴 건너뛰기




Volumn 60, Issue 5-8, 2012, Pages 667-681

Multi-contextual ant colony optimization of intermediate dynamic job shop problems

Author keywords

Ant colony optimization; Dynamic job arrival; Job shop; Stochastic

Indexed keywords

ANT COLONIES; ANT COLONY OPTIMIZATION (ACO); CONTEXT DEPENDENT; DISPATCHING RULES; DYNAMIC JOB ARRIVAL; INTELLIGENT MODELS; JOB SHOP; JOB SHOP PROBLEM; LONGEST PROCESSING TIME; MEAN FLOW; MEAN FLOW TIME; METAHEURISTIC SCHEDULING; NEW THEORY; NP-HARD; PROCESSING TIME; SCHEDULING FUNCTIONS; SCHEDULING METHODS; STOCHASTIC; THREE PARAMETERS; USE CONTEXT;

EID: 84861658858     PISSN: 02683768     EISSN: 14333015     Source Type: Journal    
DOI: 10.1007/s00170-011-3634-6     Document Type: Conference Paper
Times cited : (11)

References (35)
  • 1
    • 0001947856 scopus 로고
    • Probabilistic learning combinations of local job-shop scheduling rules
    • Muth JF, Thompson GL (eds) Prentice-Hall, Inc., New Jersey
    • Fisher H, Thompson GL (1963) Probabilistic learning combinations of local job-shop scheduling rules. In: Muth JF, Thompson GL (eds) Industrial scheduling, 1st edn. Prentice-Hall, Inc., New Jersey, pp 225-251
    • (1963) Industrial Scheduling, 1st Edn , pp. 225-251
    • Fisher, H.1    Thompson, G.L.2
  • 6
    • 0034161039 scopus 로고    scopus 로고
    • Efficient jobshop dispatching rules: Further developments
    • DOI 10.1080/095372800232379
    • Holthaus O, Rajendran C (2000) Efficient jobshop dispatching rules: further developments. Prod Plan Cont 11(2):171-178 (Pubitemid 35394368)
    • (2000) Production Planning and Control , vol.11 , Issue.2 , pp. 171-178
    • Holthaus, O.1    Rajendran, C.2
  • 7
    • 0034326104 scopus 로고    scopus 로고
    • Analysis of reactive scheduling problems in a job shop environment
    • Sabuncuoglu I, Bayiz M (2000) Analysis of reactive scheduling problems in a job shop environment. Eur J Oper Res 126:567-586
    • (2000) Eur J Oper Res , vol.126 , pp. 567-586
    • Sabuncuoglu, I.1    Bayiz, M.2
  • 9
    • 0942269532 scopus 로고    scopus 로고
    • An ant colony system for permutation flow-shop sequencing
    • DOI 10.1016/S0305-0548(03)00038-8
    • Ying K-C, Liao C-J (2004) An ant colony system for permutation flow-shop sequencing. Comput Oper Res 31:791-801. doi:10.1016/S0305-0548(03)00038-8 (Pubitemid 38135878)
    • (2004) Computers and Operations Research , vol.31 , Issue.5 , pp. 791-801
    • Ying, K.-C.1    Liao, C.-J.2
  • 11
    • 1642559633 scopus 로고    scopus 로고
    • Ant-colony algorithms for permutation flowshop scheduling to minimize makespan/total flow time of jobs
    • Rajendran C, Ziegler H (2004) Ant-colony algorithms for permutation flowshop scheduling to minimize makespan/total flow time of jobs. Eur J Oper Res 155:426-438
    • (2004) Eur J Oper Res , vol.155 , pp. 426-438
    • Rajendran, C.1    Ziegler, H.2
  • 12
    • 1442285828 scopus 로고    scopus 로고
    • Dynamic rescheduling that simultaneously considers efficiency and stability
    • Rangsaritratsamee R, Ferrell WG, Kurz MB (2004) Dynamic rescheduling that simultaneously considers efficiency and stability. Comput Ind Eng 46:1-15
    • (2004) Comput Ind Eng , vol.46 , pp. 1-15
    • Rangsaritratsamee, R.1    Ferrell, W.G.2    Kurz, M.B.3
  • 13
    • 10844252155 scopus 로고    scopus 로고
    • Metaheuristics for minimizing the makespan of the dynamic shop scheduling problem
    • Liu SQ, Ong HL, Ng KM (2005) Metaheuristics for minimizing the makespan of the dynamic shop scheduling problem. Adv Eng Sofw 36:199-205
    • (2005) Adv Eng Sofw , vol.36 , pp. 199-205
    • Liu, S.Q.1    Ong, H.L.2    Ng, K.M.3
  • 14
    • 34247223607 scopus 로고    scopus 로고
    • Hybrid ant colony optimization and visibility studies applied to a job-shop scheduling problem
    • DOI 10.1016/j.amc.2006.09.023, PII S0096300306012355
    • Heinonen J, Pettersson F (2007) Hybrid ant colony optimization and visibility studies applied to a job-shop scheduling problem. Appl Math Comput 187:989-998 (Pubitemid 46627889)
    • (2007) Applied Mathematics and Computation , vol.187 , Issue.2 , pp. 989-998
    • Heinonen, J.1    Pettersson, F.2
  • 15
    • 33845735022 scopus 로고    scopus 로고
    • Industrial applications of the ant colony optimization algorithm
    • DOI 10.1007/s00170-005-0254-z
    • Fox B, Xiang W, Lee HP (2007) Industrial applications of the ant colony optimization algorithm. Int J Adv Manuf Technol 31:805-814. doi:10.1007/s00170- 005-0254-z (Pubitemid 46005353)
    • (2007) International Journal of Advanced Manufacturing Technology , vol.31 , Issue.7-8 , pp. 805-814
    • Fox, B.1    Xiang, W.2    Lee, H.P.3
  • 16
    • 33847695701 scopus 로고    scopus 로고
    • Minimizing makespan during environmental stress screening using a genetic algorithm and an ant colony optimization
    • DOI 10.1007/s00170-005-0346-9
    • Pradhan S, Lam SSY (2007) Minimizing makespan during environmental stress screening using a genetic algorithm and an ant colony optimization. Int J Adv Manuf Technol 32:571-577 (Pubitemid 46375271)
    • (2007) International Journal of Advanced Manufacturing Technology , vol.32 , Issue.5-6 , pp. 571-577
    • Pradhan, S.1    Lam, S.S.Y.2
  • 17
    • 34249903338 scopus 로고    scopus 로고
    • Multi-heuristic desirability ant colony system heuristic for non-permutation flowshop scheduling problems
    • DOI 10.1007/s00170-006-0492-8
    • Ying K-C, Lin S-W (2007) Multi-heuristic desirability ant colony system heuristic for non-permutation flowshop scheduling problems. Int J Adv Manuf Technol 33:793-802. doi:10.1007/s00170-006-0492-8 (Pubitemid 46870786)
    • (2007) International Journal of Advanced Manufacturing Technology , vol.33 , Issue.7-8 , pp. 793-802
    • Ying, K.-C.1    Lin, S.-W.2
  • 18
    • 49049098244 scopus 로고    scopus 로고
    • Overlapping production scheduling planning with multiple objectives-an ant colony approach
    • Huang R-H, Yang C-L (2008) Overlapping production scheduling planning with multiple objectives-an ant colony approach. Int J Prod Econ 115:163-170
    • (2008) Int J Prod Econ , vol.115 , pp. 163-170
    • Huang, R.-H.1    Yang, C.-L.2
  • 19
    • 34548613299 scopus 로고    scopus 로고
    • Ant colony optimization combined with taboo search for the job shop scheduling problem
    • DOI 10.1016/j.cor.2006.07.003, PII S0305054806001481
    • Huang K-L, Liao C-J (2008) Ant colony optimization combined with taboo search for the job shop scheduling problem. Comput Oper Res 35:1030-1046. doi:10.1016/j.cor.2006.07.003 (Pubitemid 47404760)
    • (2008) Computers and Operations Research , vol.35 , Issue.4 , pp. 1030-1046
    • Huang, K.-L.1    Liao, C.-J.2
  • 20
    • 52649172737 scopus 로고    scopus 로고
    • Ant colony system for job shop scheduling with time windows
    • doi:10.1007/s00170-007-1203-9
    • Huang R-H, Yang C-L (2008) Ant colony system for job shop scheduling with time windows. Int J Adv Manuf Technol 39:151-157. doi:10.1007/s00170-007-1203-9
    • (2008) Int J Adv Manuf Technol , vol.39 , pp. 151-157
    • Huang, R.-H.1    Yang, C.-L.2
  • 21
    • 36249018423 scopus 로고    scopus 로고
    • Ant colony intelligence in multi-agent dynamic manufacturing scheduling
    • DOI 10.1016/j.engappai.2007.03.008, PII S0952197607000437
    • Xiang W, Lee HP (2008) Ant colony intelligence in multiagent dynamic manufacturing scheduling. Eng App Artif Intel 21:73-85 (Pubitemid 350123695)
    • (2008) Engineering Applications of Artificial Intelligence , vol.21 , Issue.1 , pp. 73-85
    • Xiang, W.1    Lee, H.P.2
  • 22
    • 70449637498 scopus 로고    scopus 로고
    • Performance of an ant colony optimization algorithm in dynamic job shop scheduling problems
    • Zhou R, Nee AYC, Lee HP (2009) Performance of an ant colony optimization algorithm in dynamic job shop scheduling problems. Int J Prod Res 47(11):2903-2920
    • (2009) Int J Prod Res , vol.47 , Issue.11 , pp. 2903-2920
    • Zhou, R.1    Nee, A.Y.C.2    Lee, H.P.3
  • 24
    • 77957861680 scopus 로고    scopus 로고
    • Sequencing and scheduling of job and tool in a flexible manufacturing system using ant colony optimization algorithm
    • doi:10.1007/s00170-010-2583-9
    • Udhayakumar P, Kumanan S (2010) Sequencing and scheduling of job and tool in a flexible manufacturing system using ant colony optimization algorithm. Int J Adv Manuf Technol. doi:10.1007/s00170-010-2583-9
    • (2010) Int J Adv Manuf Technol
    • Udhayakumar, P.1    Kumanan, S.2
  • 25
    • 20644453535 scopus 로고    scopus 로고
    • Sensitivity-based conceptual design and tolerance allocation using the continuous ants colony algorithm (CACO)
    • DOI 10.1007/s00170-003-1846-0
    • Prabhaharan G, Asokan P, Rajendran S (2005) Sensitivity-based conceptual design and tolerance allocation using the continuous ants colony algorithm (CACO). Int J Adv Manuf Technol 25:516-526. doi:10.1007/s00170-003-1846-0 (Pubitemid 40833863)
    • (2005) International Journal of Advanced Manufacturing Technology , vol.25 , Issue.5-6 , pp. 516-526
    • Prabhaharan, G.1    Asokan, P.2    Rajendran, S.3
  • 26
    • 33744550911 scopus 로고    scopus 로고
    • Optimization of depth of cut in multi-pass turning using nontraditional optimization techniques
    • DOI 10.1007/s00170-005-2526-z
    • Satishkumar S, Asokan P, Kumanan S (2006) Optimization of depth of cut in multi-pass turning using nontraditional optimization techniques. Int J Adv Manuf Technol 29:230-238. doi:10.1007/s00170-005-2526-z (Pubitemid 43814095)
    • (2006) International Journal of Advanced Manufacturing Technology , vol.29 , Issue.3-4 , pp. 230-238
    • Satishkumar, S.1    Asokan, P.2    Kumanan, S.3
  • 27
    • 78650301474 scopus 로고    scopus 로고
    • Application of ACO-BPN to thermal error modeling of NC machine tool
    • doi:10.1007/s00170-010-2520-y
    • Guo Q-J, Yang J-G, Wu H (2010) Application of ACO-BPN to thermal error modeling of NC machine tool. Int J Adv Manuf Technol 50:667-675. doi:10.1007/s00170-010-2520-y
    • (2010) Int J Adv Manuf Technol , vol.50 , pp. 667-675
    • Guo, Q.-J.1    Yang, J.-G.2    Wu, H.3
  • 28
    • 80053567242 scopus 로고    scopus 로고
    • Makespan minimization of a flowshop sequence-dependent group scheduling problem
    • doi:10.1007/s00170-011-3206-9
    • Salmasi N, Logendran R, Skandari MR (2011) Makespan minimization of a flowshop sequence-dependent group scheduling problem. Int J Adv Manuf Technol. doi:10.1007/s00170-011-3206-9
    • (2011) Int J Adv Manuf Technol
    • Salmasi, N.1    Logendran, R.2    Skandari, M.R.3
  • 32
    • 69649088452 scopus 로고    scopus 로고
    • Due window scheduling with sequence-dependent setup on parallel machines using three hybrid metaheuristic algorithms
    • doi:10.1007/s00170-008-1885-7
    • Behnamian J, Zandieh M, Fatemi Ghomi SMT (2009) Due window scheduling with sequence-dependent setup on parallel machines using three hybrid metaheuristic algorithms. Int J Adv Manuf Technol 44:795-808. doi:10.1007/s00170-008-1885-7
    • (2009) Int J Adv Manuf Technol , vol.44 , pp. 795-808
    • Behnamian, J.1    Zandieh, M.2    Fatemi Ghomi, S.M.T.3
  • 33
    • 79958830028 scopus 로고    scopus 로고
    • Ant colony optimization technique for the sequence-dependent flowshop scheduling problem
    • doi:10.1007/s00170-010-3037-0
    • Mirabi M (2011) Ant colony optimization technique for the sequence-dependent flowshop scheduling problem. Int J Adv Manuf Technol 55:317-326. doi:10.1007/s00170-010-3037-0
    • (2011) Int J Adv Manuf Technol , vol.55 , pp. 317-326
    • Mirabi, M.1
  • 34
    • 79958810237 scopus 로고    scopus 로고
    • Multi-objective optimization algorithms for flow shop scheduling problem: A review and prospects
    • doi:10.1007/s00170-010-3094-4
    • Sun Y, Zhang C, Gao L, Wang X (2011) Multi-objective optimization algorithms for flow shop scheduling problem: a review and prospects. Int J Adv Manuf Technol 55:723-739. doi:10.1007/s00170-010-3094-4
    • (2011) Int J Adv Manuf Technol , vol.55 , pp. 723-739
    • Sun, Y.1    Zhang, C.2    Gao, L.3    Wang, X.4
  • 35
    • 33748519291 scopus 로고    scopus 로고
    • An ant colony algorithm for scheduling in flowshops with sequence-dependent setup times of jobs
    • DOI 10.1007/s00170-005-0093-y, Intelligent Disassembly in the Demanufacturing Process
    • Gajpal Y, Rajendran C, Ziegler H (2006) An ant colony algorithm for scheduling in flowshops with sequence-dependent setup times of jobs. Int J Adv Manuf Technol 30:416-424. doi:10.1007/s00170-005-0093-y (Pubitemid 44370976)
    • (2006) International Journal of Advanced Manufacturing Technology , vol.30 , Issue.5-6 , pp. 416-424
    • Gajpal, Y.1    Rajendran, C.2    Ziegler, H.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.