메뉴 건너뛰기




Volumn 5, Issue 4, 2008, Pages 125-143

Case studies for improving FMS scheduling by lot streaming in flow-shop systems

Author keywords

Brute Force Method; Excess Time Coefficient; FMS Scheduling; Global Minimum of Production Time; Joinable Schedule Approach; Lot Streaming; Scheduling Priority Rules

Indexed keywords


EID: 84861386109     PISSN: 17858860     EISSN: None     Source Type: Journal    
DOI: None     Document Type: Article
Times cited : (1)

References (23)
  • 1
    • 21844508729 scopus 로고
    • Lot Streaming in Two-Machine Flow Shop with Set up Time
    • Baker K. R: Lot Streaming in Two-Machine Flow Shop with Set up Time, Annual of Operations Research 57, 1995, pp. 1-11
    • (1995) Annual of Operations Research , vol.57 , pp. 1-11
    • Baker, K.R.1
  • 2
    • 0028698198 scopus 로고
    • Lot Streaming in a Two-Stage Flow-Shop with Set up Processing and Removal Times Separated
    • Cetinkaya, F. C.: Lot Streaming in a Two-Stage Flow-Shop with Set up Processing and Removal Times Separated, Journal of the Operational Research Society 45(12), 1994, pp. 1445-1455
    • (1994) Journal of the Operational Research Society , vol.45 , Issue.12 , pp. 1445-1455
    • Cetinkaya, F.C.1
  • 7
    • 0033702610 scopus 로고    scopus 로고
    • Evaluation of the Potential Benefits of Lot Streaming in Flow Shop Systems
    • Kalir A., Sarin C.: Evaluation of the Potential Benefits of Lot Streaming in Flow Shop Systems, International Journal of Production Economics 66, 2000, pp. 131-142
    • (2000) International Journal of Production Economics , vol.66 , pp. 131-142
    • Kalir, A.1    Sarin, C.2
  • 8
    • 0037372761 scopus 로고    scopus 로고
    • Constructing Near Optimal Schedules for the Flow Shop Lot Streaming Problem with Sublot-Attached Setups
    • Kalir A., Sarin C.: Constructing Near Optimal Schedules for the Flow Shop Lot Streaming Problem with Sublot-Attached Setups, Journal of Combinatorial Optimization 7(1), 2003, pp. 23-44
    • (2003) Journal of Combinatorial Optimization , vol.7 , Issue.1 , pp. 23-44
    • Kalir, A.1    Sarin, C.2
  • 9
    • 0013356811 scopus 로고    scopus 로고
    • A Near-Optimal Heuristic for the Sequencing Problem in Multiple-Batch Flow-Shops with Small Equal Sublots
    • Kalir A. A., Sarin S. C.: A Near-Optimal Heuristic for the Sequencing Problem in Multiple-Batch Flow-Shops with Small Equal Sublots, Omega 29, 2001, pp. 577-584
    • (2001) Omega , vol.29 , pp. 577-584
    • Kalir, A.A.1    Sarin, S.C.2
  • 10
    • 84875034484 scopus 로고    scopus 로고
    • Improvement of FMS Scheduling Efficiency by Optimal Lot Streaming for Flow Shop Problems
    • BUTE, Budapest, Hungary, May 29-30
    • th National Conference, BUTE, Budapest, Hungary, May 29-30, 2008
    • (2008) th National Conference
    • Ezedeen, K.1    Somló, J.2
  • 15
    • 0142039797 scopus 로고    scopus 로고
    • Scheduling of Production of Flexible Manufacturing Systems Using Hybrid Dynamical Method
    • Budapest University of Technology, Hungary
    • Koncz T.: Scheduling of Production of Flexible Manufacturing Systems Using Hybrid Dynamical Method, Thesis of Master of Science, Budapest University of Technology, Hungary, 2002
    • (2002) Thesis of Master of Science
    • Koncz, T.1
  • 21
    • 0026896286 scopus 로고
    • Two and Three Machine Flow Shop Scheduling Problems with Equal Sized Transfer Batches
    • Vickson R., B. Alfredsson: Two and Three Machine Flow Shop Scheduling Problems with Equal Sized Transfer Batches, International Journal Production Research 30, 1992, pp. 1551-1574
    • (1992) International Journal Production Research , vol.30 , pp. 1551-1574
    • Vickson, R.1    Alfredsson, B.2
  • 22
    • 0029378595 scopus 로고
    • Optimal Lot Streaming for Multiple Products in a Two:Machine Flow Shop
    • Vickson R. G.: Optimal Lot Streaming for Multiple Products in a Two:Machine Flow Shop, European Journal of Operational Research 85, 1993, pp. 556-575
    • (1993) European Journal of Operational Research , vol.85 , pp. 556-575
    • Vickson, R.G.1
  • 23
    • 13444302670 scopus 로고    scopus 로고
    • Multi-job Lot Streaming to Minimize the Mean Completion Time in m-Hybrid Flow Shops
    • W. Zhang, C. Yin, J. Liu, R. J. Linn: Multi-job Lot Streaming to Minimize the Mean Completion Time in m-Hybrid Flow Shops, International Journal of Production Economics 96, 2005, pp. 189-200
    • (2005) International Journal of Production Economics , vol.96 , pp. 189-200
    • Zhang, W.1    Yin, C.2    Liu, J.3    Linn, R.J.4


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.