메뉴 건너뛰기




Volumn 20, Issue 1, 2004, Pages 35-47

Pragmatic aspects of the solution of FMS scheduling problems using hybrid dynamical approach

Author keywords

Controlled buffer technique; Demand rate; Dynamical division of series; FMS Scheduling; Hybrid dynamical approach (HDA); Manufacturing simulation; Overlapping production; Switched server

Indexed keywords

COMPUTER CONTROL; COMPUTER INTEGRATED MANUFACTURING; COMPUTER SIMULATION; SCHEDULING; SERVERS;

EID: 1242287953     PISSN: 07365845     EISSN: None     Source Type: Journal    
DOI: 10.1016/S0736-5845(03)00054-1     Document Type: Article
Times cited : (10)

References (16)
  • 1
    • 0024611210 scopus 로고
    • Stable, distributed, real-time scheduling of flexible manufacturing (Assembly) disassembly systems
    • Perkins J.R., Kumar P.R. Stable, distributed, real-time scheduling of flexible manufacturing (Assembly) disassembly systems. IEEE Trans Autom Control. 34(2):1989;139-148.
    • (1989) IEEE Trans Autom Control , vol.34 , Issue.2 , pp. 139-148
    • Perkins, J.R.1    Kumar, P.R.2
  • 2
    • 0035202918 scopus 로고    scopus 로고
    • Hybrid dynamical approach makes FMS scheduling more effective - Periodica Polytechnica, Budapest University of Technology and Economics
    • Somlo J. Hybrid dynamical approach makes FMS scheduling more effective - Periodica Polytechnica, Budapest University of Technology and Economics. Ser Mech Eng. 45(2):2001;175-200.
    • (2001) Ser Mech Eng , vol.45 , Issue.2 , pp. 175-200
    • Somlo, J.1
  • 5
    • 0000900396 scopus 로고    scopus 로고
    • Regularizability of complex switched server queuing networks modelled as hybrid dynamical systems
    • Savkin A.V. Regularizability of complex switched server queuing networks modelled as hybrid dynamical systems. Syst Control Lett. 35(5):1998;291-300.
    • (1998) Syst Control Lett , vol.35 , Issue.5 , pp. 291-300
    • Savkin, A.V.1
  • 6
    • 0033878117 scopus 로고    scopus 로고
    • Linear cyclic differential automata: A simple class of hybrid dynamical systems
    • Savkin A.V., Matveev A.S. Linear cyclic differential automata. a simple class of hybrid dynamical systems Automatica. 36(5):2000;727-734.
    • (2000) Automatica , vol.36 , Issue.5 , pp. 727-734
    • Savkin, A.V.1    Matveev, A.S.2
  • 7
    • 0028416433 scopus 로고
    • Distributed scheduling of flexible manufacturing systems: Stability and performance
    • Perkins J.R., Humes C., Kumar P.R. Distributed scheduling of flexible manufacturing systems: stability and performance. IEEE Trans Robotics Automation. 10(2):1994;133-141.
    • (1994) IEEE Trans Robotics Automation , vol.10 , Issue.2 , pp. 133-141
    • Perkins, J.R.1    Humes, C.2    Kumar, P.R.3
  • 8
    • 0035485518 scopus 로고    scopus 로고
    • Queuing network models in the design and analysis of semiconductor wafer fabs
    • Kumar S., Kumar P.R. Queuing network models in the design and analysis of semiconductor wafer fabs. IEEE Trans Robotics Automation. 17(5):2001;548-561.
    • (2001) IEEE Trans Robotics Automation , vol.17 , Issue.5 , pp. 548-561
    • Kumar, S.1    Kumar, P.R.2
  • 9
    • 0028744478 scopus 로고
    • Scheduling semiconductor manufacturing plants
    • Kumar P.R. Scheduling semiconductor manufacturing plants. IEEE Control Syst Mag. 14(6):1994;30-40.
    • (1994) IEEE Control Syst Mag , vol.14 , Issue.6 , pp. 30-40
    • Kumar, P.R.1
  • 10
    • 0028481114 scopus 로고
    • Efficient scheduling to reduce mean and variance of cycle-time in semiconductor manufacturing plants
    • Lu S.C.H., Ramaswamy D., Kumar P.R. Efficient scheduling to reduce mean and variance of cycle-time in semiconductor manufacturing plants. IEEE Trans On Semiconductor Manufacturing. 7(3):1994;374-385.
    • (1994) IEEE Trans on Semiconductor Manufacturing , vol.7 , Issue.3 , pp. 374-385
    • Lu, S.C.H.1    Ramaswamy, D.2    Kumar, P.R.3
  • 11
    • 1242264521 scopus 로고    scopus 로고
    • Solution of FMS scheduling problems using the hybrid dynamical approach PROLAMAT 2001
    • Budapest, Hungary, 7-10 November
    • Somlo J, Savkin AV, Lukanyin V. Solution of FMS scheduling problems using the hybrid dynamical approach PROLAMAT 2001. Digital Enterprise Challenges, Budapest, Hungary, 7-10 November, 2001. p. 506-21.
    • (2001) Digital Enterprise Challenges , pp. 506-521
    • Somlo, J.1    Savkin, A.V.2    Lukanyin, V.3
  • 12
    • 1242309548 scopus 로고    scopus 로고
    • Hybrid dynamical approach to FMS scheduling. A Case Study
    • Balatonfured, June
    • Somlo J, Anufriev A, Lipovszki Gy. Hybrid dynamical approach to FMS scheduling. A Case Study. RAAD 2002. Balatonfured, June 2002.
    • (2002) RAAD 2002
    • Somlo, J.1    Anufriev, A.2    Lipovszki, Gy.3
  • 14
    • 29144523307 scopus 로고    scopus 로고
    • Process modelling of event controlled buffer systems by discrete event simulation
    • Budapest University of Technology and Economics, Department of Manufacturing Engineering
    • Anufriev A. Process modelling of event controlled buffer systems by discrete event simulation. Special report. Budapest University of Technology and Economics, Department of Manufacturing Engineering, 2002.
    • (2002) Special Report
    • Anufriev, A.1
  • 15
    • 1242264518 scopus 로고    scopus 로고
    • PhD dissertation, Budapest University of Technology and Economics, prepared for defence, Budapest
    • Anufriev A. Hybrid dynamic approach to FMS scheduling. PhD dissertation, Budapest University of Technology and Economics, prepared for defence, Budapest 2002, pp. 1-109.
    • (2002) Hybrid Dynamic Approach to FMS Scheduling , pp. 1-109
    • Anufriev, A.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.