메뉴 건너뛰기




Volumn 15, Issue 2, 2012, Pages 201-216

Dynamic supply chain scheduling

Author keywords

Adaptation; Dynamics; Mathematical programming; Maximum principle; Operations research; Optimal program control; Scheduling; Supply chain

Indexed keywords

ADAPTATION; ADAPTIVE FRAMEWORK; ADAPTIVITY; ADMISSIBLE CONTROL; CALCULATION PROCEDURE; CONTINUOUS PROCESS; CONTROL MODEL; CONTROLLED DIFFERENTIALS; DISCRETE OPTIMIZATION; DYADIC RELATIONS; DYNAMIC PROCESS; DYNAMIC SUPPLY CHAINS; EXECUTION CONTROL; MODERN CONTROL THEORY; NONSTATIONARY; OPERATIONS CONTROL; OPTIMAL CONTROL CALCULATIONS; OPTIMAL CONTROLS; PONTRYAGIN'S MAXIMUM PRINCIPLE; PROBLEM DIMENSIONALITY; PROGRAM CONTROL; RECONFIGURABLE STRUCTURE; SCHEDULE GENERATION; SCHEDULING MODELS; SUPPLY CHAIN PLANNING; SUPPLY CHAIN SCHEDULING;

EID: 84861231928     PISSN: 10946136     EISSN: None     Source Type: Journal    
DOI: 10.1007/s10951-010-0189-6     Document Type: Article
Times cited : (95)

References (56)
  • 2
    • 5144232431 scopus 로고    scopus 로고
    • Executing production schedules in the face of uncertainties: A review and some future directions
    • Aytug, H., Lawley, M. A., McKay, K., Mohan, S., & Uzsoy, R. (2005). Executing production schedules in the face of uncertainties: a review and some future directions. European Journal of Operational Research, 161(1), 86-100.
    • (2005) European Journal of Operational Research , vol.161 , Issue.1 , pp. 86-100
    • Aytug, H.1    Lawley, M.A.2    McKay, K.3    Mohan, S.4    Uzsoy, R.5
  • 6
    • 33744826037 scopus 로고    scopus 로고
    • Order assignment and scheduling in a supply chain
    • Chen, Z. L., & Pundoor, G. (2006). Order assignment and scheduling in a supply chain. Operations Research, 54(3), 555-572.
    • (2006) Operations Research , vol.54 , Issue.3 , pp. 555-572
    • Chen, Z.L.1    Pundoor, G.2
  • 8
    • 12344295804 scopus 로고    scopus 로고
    • On the stability of supply chains
    • Daganzo, C. F. (2004). On the stability of supply chains. Operations Research, 52(6), 909-921.
    • (2004) Operations Research , vol.52 , Issue.6 , pp. 909-921
    • Daganzo, C.F.1
  • 9
    • 29344443473 scopus 로고    scopus 로고
    • On the equivalence of control theoretic, differential, and difference equation approaches to modeling supply chains
    • Disney, S. M., Towill, D. R., & Warburton, R. D. H. (2006). On the equivalence of control theoretic, differential, and difference equation approaches to modeling supply chains. International Journal of Production Economics, 101, 194-208.
    • (2006) International Journal of Production Economics , vol.101 , pp. 194-208
    • Disney, S.M.1    Towill, D.R.2    Warburton, R.D.H.3
  • 11
    • 0001598650 scopus 로고
    • An economic interpretation of optimal control theory
    • Dorfman, R. (1969). An economic interpretation of optimal control theory. American Economic Review, 59, 817-831.
    • (1969) American Economic Review , vol.59 , pp. 817-831
    • Dorfman, R.1
  • 15
    • 0024033635 scopus 로고
    • Simultaneous and dynamic price, production, inventory and capacity decisions
    • Gaimon, C. (1988). Simultaneous and dynamic price, production, inventory and capacity decisions. European Journal of Operational Research, 35, 426-441.
    • (1988) European Journal of Operational Research , vol.35 , pp. 426-441
    • Gaimon, C.1
  • 19
    • 57049089480 scopus 로고    scopus 로고
    • DIMA-A research methodology for comprehensive multi-disciplinary modelling of production and logistics networks
    • Ivanov, D. (2009). DIMA-a research methodology for comprehensive multi-disciplinary modelling of production and logistics networks. International Journal of Production Research, 47(5), 1133-1155.
    • (2009) International Journal of Production Research , vol.47 , Issue.5 , pp. 1133-1155
    • Ivanov, D.1
  • 20
    • 77952593612 scopus 로고    scopus 로고
    • Adaptive aligning of planning decisions on supply chain strategy, design, tactics, and operations
    • Ivanov, D. (2010). Adaptive aligning of planning decisions on supply chain strategy, design, tactics, and operations. International Journal of Production Research, 48(13), 3999-4017.
    • (2010) International Journal of Production Research , vol.48 , Issue.13 , pp. 3999-4017
    • Ivanov, D.1
  • 23
    • 69249208706 scopus 로고    scopus 로고
    • A multi-structural framework for adaptive supply chain planning and operations with structure dynamics considerations
    • Ivanov, D., Sokolov, B., & Kaeschel, J. (2010). A multi-structural framework for adaptive supply chain planning and operations with structure dynamics considerations. European Journal of Operational Research, 200(2), 409-420.
    • (2010) European Journal of Operational Research , vol.200 , Issue.2 , pp. 409-420
    • Ivanov, D.1    Sokolov, B.2    Kaeschel, J.3
  • 24
    • 79960593908 scopus 로고
    • Optimal planning of the process of interaction of moving operating objects
    • Kalinin, V. N., & Sokolov, B. V. (1985). Optimal planning of the process of interaction of moving operating objects. International Journal of Difference Equations, 21(5), 502-506.
    • (1985) International Journal of Difference Equations , vol.21 , Issue.5 , pp. 502-506
    • Kalinin, V.N.1    Sokolov, B.V.2
  • 25
    • 84904773696 scopus 로고
    • A dynamic model and an optimal scheduling algorithm for activities with bans of interrupts
    • Kalinin, V. N., & Sokolov, B. V. (1987). A dynamic model and an optimal scheduling algorithm for activities with bans of interrupts. Automation and Remote Control, 48(1-2), 88-94.
    • (1987) Automation and Remote Control , vol.48 , Issue.1-2 , pp. 88-94
    • Kalinin, V.N.1    Sokolov, B.V.2
  • 26
    • 0031259151 scopus 로고    scopus 로고
    • Maximum principle-based methods for production scheduling with partially sequence-dependent setups
    • Khmelnitsky, E., Kogan, K., & Maimom, O. (1997). Maximum principle-based methods for production scheduling with partially sequence-dependent setups. International Journal of Production Research, 35(10), 2701-2712.
    • (1997) International Journal of Production Research , vol.35 , Issue.10 , pp. 2701-2712
    • Khmelnitsky, E.1    Kogan, K.2    Maimom, O.3
  • 27
    • 0020915621 scopus 로고
    • An algorithm for the computer control of a flexible manufacturing system
    • Kimemia, J. G., & Gershwin, T. I. (1983). An algorithm for the computer control of a flexible manufacturing system. IIE Transactions, 15, 353-362.
    • (1983) IIE Transactions , vol.15 , pp. 353-362
    • Kimemia, J.G.1    Gershwin, T.I.2
  • 29
    • 5644303213 scopus 로고    scopus 로고
    • Planning and scheduling in supply chains: An overview of issues in practice
    • Kreipl, S., & Pinedo, M. (2004). Planning and scheduling in supply chains: an overview of issues in practice. Production and Operations Management, 13(1), 77-92.
    • (2004) Production and Operations Management , vol.13 , Issue.1 , pp. 77-92
    • Kreipl, S.1    Pinedo, M.2
  • 30
    • 34548762520 scopus 로고    scopus 로고
    • A system of models contribution to production network (PN) theory
    • Kuehnle, H. (2008). A system of models contribution to production network (PN) theory. Journal of Intelligent Manufacturing, 18(5), 543-551.
    • (2008) Journal of Intelligent Manufacturing , vol.18 , Issue.5 , pp. 543-551
    • Kuehnle, H.1
  • 31
    • 29344469299 scopus 로고    scopus 로고
    • Controllable, observable and stable state space representations of a generalized order-up-to policy
    • Lalwani, C. S., Disney, S., & Towill, D. R. (2006). Controllable, observable and stable state space representations of a generalized order-up-to policy. International Journal of Production Economics, 101, 172-184.
    • (2006) International Journal of Production Economics , vol.101 , pp. 172-184
    • Lalwani, C.S.1    Disney, S.2    Towill, D.R.3
  • 34
    • 84861227793 scopus 로고    scopus 로고
    • New business models for supply chain excellence
    • N. Mulani Ed., San Francisco: Montgomery Research
    • Mulani, N. P., & Lee, H. L. (2002). New business models for supply chain excellence. In N. Mulani (Ed.), Achieving supply chain excellence through technology. (Vol. 4). San Francisco: Montgomery Research.
    • (2002) Achieving Supply Chain Excellence Through Technology , vol.4
    • Mulani, N.P.1    Lee, H.L.2
  • 36
    • 41449093762 scopus 로고    scopus 로고
    • Integrated process planning and scheduling in a supply chain
    • Moon, C., Lee, Y. H., Jeong, C. S., & Yun, Y. S. (2008). Integrated process planning and scheduling in a supply chain. Computers & Industrial Engineering, 54(4), 1048-1061.
    • (2008) Computers & Industrial Engineering , vol.54 , Issue.4 , pp. 1048-1061
    • Moon, C.1    Lee, Y.H.2    Jeong, C.S.3    Yun, Y.S.4
  • 39
    • 38349091116 scopus 로고    scopus 로고
    • A multi-criteria approach for scheduling semiconductor wafer fabrication facilities
    • Pfund, M. E., Balasubramanian, H., Fowler, J. W., Mason, J. S., & Rose, O. (2008). A multi-criteria approach for scheduling semiconductor wafer fabrication facilities. Journal of Scheduling, 11(1), 29-47.
    • (2008) Journal of Scheduling , vol.11 , Issue.1 , pp. 29-47
    • Pfund, M.E.1    Balasubramanian, H.2    Fowler, J.W.3    Mason, J.S.4    Rose, O.5
  • 44
    • 84883954831 scopus 로고    scopus 로고
    • Scheduling: New trends in industrial environment
    • A. Dolgui et al. Eds., Amsterdam: Elsevier
    • Proth, J. M. (2006). Scheduling: new trends in industrial environment. In A. Dolgui et al. (Eds.), Information control problems in manufacturing (pp. 41-47). Amsterdam: Elsevier.
    • (2006) Information Control Problems in Manufacturing , pp. 41-47
    • Proth, J.M.1
  • 45
    • 50549091754 scopus 로고    scopus 로고
    • Capturing dynamics in integrated supply chain management
    • Puigjaner, L., & Lainez, J. M. (2008). Capturing dynamics in integrated supply chain management. Computers and Chemical Engineering, 32, 2582-2605.
    • (2008) Computers and Chemical Engineering , vol.32 , pp. 2582-2605
    • Puigjaner, L.1    Lainez, J.M.2
  • 46
    • 55149099211 scopus 로고    scopus 로고
    • Optimal production plans and shipment schedules in a supply-chain system with multiple suppliers and multiple buyers
    • Sarker, R., Bhaba, R., & Diponegoro, A. (2009). Optimal production plans and shipment schedules in a supply-chain system with multiple suppliers and multiple buyers. European Journal of Operation Research, 194(3), 753-773.
    • (2009) European Journal of Operation Research , vol.194 , Issue.3 , pp. 753-773
    • Sarker, R.1    Bhaba, R.2    Diponegoro, A.3
  • 48
    • 56549112491 scopus 로고    scopus 로고
    • Integration of process planning and scheduling. A modified genetic algorithm-based approach
    • Shao, X., Li, X., Gao, L., & Zhang, C. (2009). Integration of process planning and scheduling. A modified genetic algorithm-based approach. Computers in Industry, 36(6), 2082-2096.
    • (2009) Computers in Industry , vol.36 , Issue.6 , pp. 2082-2096
    • Shao, X.1    Li, X.2    Gao, L.3    Zhang, C.4
  • 51
    • 12244256822 scopus 로고    scopus 로고
    • Conceptual foundations of quality estimation and analysis for models and multi-model systems
    • Sokolov, B., & Yusupov, R. (2004). Conceptual foundations of quality estimation and analysis for models and multi-model systems. Journal of Computer and Systems Science International, 6, 5-16.
    • (2004) Journal of Computer and Systems Science International , vol.6 , pp. 5-16
    • Sokolov, B.1    Yusupov, R.2
  • 52
    • 56349122567 scopus 로고    scopus 로고
    • Hierarchical supply chain planning architecture for integrated analysis of stability and performance
    • Son, Y.-J., & Venkateswaran, J. (2007). Hierarchical supply chain planning architecture for integrated analysis of stability and performance. International Journal of Simulation and Process Modelling, 3(3), 153-169.
    • (2007) International Journal of Simulation and Process Modelling , vol.3 , Issue.3 , pp. 153-169
    • Son, Y.-J.1    Venkateswaran, J.2
  • 54
    • 34249890486 scopus 로고    scopus 로고
    • A classification of predictive-reactive project scheduling procedures
    • Van de Vonder, S., Demeulemeester, E., & Herroelen, W. (2007). A classification of predictive-reactive project scheduling procedures. Journal of Scheduling, 10(3), 195-207.
    • (2007) Journal of Scheduling , vol.10 , Issue.3 , pp. 195-207
    • Van De Vonder, S.1    Demeulemeester, E.2    Herroelen, W.3
  • 55
    • 38549099696 scopus 로고    scopus 로고
    • Optimal control of serial inventory systems with fixed replenishment intervals
    • Van Houtum, G. Y., Scheller-Wolf, A., & Yi, Y. (2007). Optimal control of serial inventory systems with fixed replenishment intervals. Operations Research, 55(4), 674-687.
    • (2007) Operations Research , vol.55 , Issue.4 , pp. 674-687
    • Van Houtum, G.Y.1    Scheller-Wolf, A.2    Yi, Y.3
  • 56
    • 0242703954 scopus 로고    scopus 로고
    • Rescheduling manufacturing systems: A framework of strategies, policies, and methods
    • Vieira, G. E., Herrmann, J. W., & Lin, E. (2003). Rescheduling manufacturing systems: a framework of strategies, policies, and methods. Journal of Scheduling, 6(1), 35-58.
    • (2003) Journal of Scheduling , vol.6 , Issue.1 , pp. 35-58
    • Vieira, G.E.1    Herrmann, J.W.2    Lin, E.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.