-
1
-
-
33746791541
-
Decision analysis in energy and environmental modeling: an update
-
Zhou P., Ang B.W., Poh K.L. Decision analysis in energy and environmental modeling: an update. Energy 2006, 31(4):2604-2622.
-
(2006)
Energy
, vol.31
, Issue.4
, pp. 2604-2622
-
-
Zhou, P.1
Ang, B.W.2
Poh, K.L.3
-
3
-
-
84962253412
-
Site selection and economic risks for thermal power plant projects under the new Brazilian regulatory framework
-
879-888
-
Ramos D.S., Fadigas E.A.F.A., Lima W.S. Site selection and economic risks for thermal power plant projects under the new Brazilian regulatory framework. International conference on power system technology, Perth, WA, Australia 2000, 2. 879-888.
-
(2000)
International conference on power system technology, Perth, WA, Australia
, vol.2
-
-
Ramos, D.S.1
Fadigas, E.A.F.A.2
Lima, W.S.3
-
4
-
-
84860834628
-
-
Available at:, (accessed on 20.11.09)
-
Valadan Zoej M.J., Mesgri M.S., Beheshtifar S., Karimi M. Thermal power plant site selection using GIS 2005, Available at:, (accessed on 20.11.09). http://www.gisdevelopment.net/application/utility/power/ma05154.htm.
-
(2005)
Thermal power plant site selection using GIS
-
-
Valadan Zoej, M.J.1
Mesgri, M.S.2
Beheshtifar, S.3
Karimi, M.4
-
5
-
-
85009480104
-
Sustainable energy development: The present (2011) situation and possible path to future
-
Lior N. Sustainable energy development: The present (2011) situation and possible path to future. Energy in press;1-18.
-
Energy in press
, pp. 1-18
-
-
Lior, N.1
-
7
-
-
85018021932
-
-
All India generating installed capacity (MW) as on 30/06/2011. Available at: (accessed on 10/07
-
All India generating installed capacity (MW) as on 30/06/2011. Available at: (accessed on 10/07/2011). http://www.cea.nic.in/reports/monthly/executive_rep/jun11/8.pdf.
-
(2011)
-
-
-
8
-
-
85018024195
-
Power Sector Development
-
Available at: (accessed on 24/06
-
Power Sector Development. Available at: (accessed on 24/06/2011). http://www.natcomindia.org/reports_ministries/power/blueprint.pdf.
-
(2011)
-
-
-
9
-
-
84859104709
-
Sustainable development and low carbon growth strategy for India
-
Parikh K. Sustainable development and low carbon growth strategy for India. Energy 2012, 40(1):31-38.
-
(2012)
Energy
, vol.40
, Issue.1
, pp. 31-38
-
-
Parikh, K.1
-
10
-
-
79955651811
-
A fuzzy environmental-technical-economic model for distributed generation planning
-
Zangeneh A., Jadid S., Rahimi-Kian A. A fuzzy environmental-technical-economic model for distributed generation planning. Energy 2011, 36(2):3437-3445.
-
(2011)
Energy
, vol.36
, Issue.2
, pp. 3437-3445
-
-
Zangeneh, A.1
Jadid, S.2
Rahimi-Kian, A.3
-
11
-
-
33845276965
-
The problem of windfarm location: a social multi-criteria evaluation frame work
-
Gamboa G., Munda G. The problem of windfarm location: a social multi-criteria evaluation frame work. Energy Policy 2007, 35:1564-1583.
-
(2007)
Energy Policy
, vol.35
, pp. 1564-1583
-
-
Gamboa, G.1
Munda, G.2
-
12
-
-
0142218356
-
Energy for future: an integrated decision aid for the case of Turkey
-
Topcu Y.I., Ulengin F. Energy for future: an integrated decision aid for the case of Turkey. Energy 2004, 29(1):137-154.
-
(2004)
Energy
, vol.29
, Issue.1
, pp. 137-154
-
-
Topcu, Y.I.1
Ulengin, F.2
-
13
-
-
0035354225
-
A neuro-fuzzy program approach for evaluating electric power generation systems
-
Mamlook R., Akash B.A., Mohsen M.S. A neuro-fuzzy program approach for evaluating electric power generation systems. Energy 2001, 26(6):619-632.
-
(2001)
Energy
, vol.26
, Issue.6
, pp. 619-632
-
-
Mamlook, R.1
Akash, B.A.2
Mohsen, M.S.3
-
14
-
-
1542434005
-
Multi-criteria selection for a wind observation station location using analytic hierarchy process
-
Aras H., Erdoĝmus Ş., Koç E. Multi-criteria selection for a wind observation station location using analytic hierarchy process. Renewable Energy 2004, 29:1383-1392.
-
(2004)
Renewable Energy
, vol.29
, pp. 1383-1392
-
-
Aras, H.1
Erdoĝmus, Ş.2
Koç, E.3
-
15
-
-
38749139863
-
Fuel ethanol production from sugarcane and corn: comparative analysis for a Colombian case
-
Quintero J.A., Montoya M.I., Sánchez O.J., Giraldo O.H., Cardona C.A. Fuel ethanol production from sugarcane and corn: comparative analysis for a Colombian case. Energy 2008, 33(3):385-399.
-
(2008)
Energy
, vol.33
, Issue.3
, pp. 385-399
-
-
Quintero, J.A.1
Montoya, M.I.2
Sánchez, O.J.3
Giraldo, O.H.4
Cardona, C.A.5
-
16
-
-
78649883380
-
Which is the best solar thermal collection technology for electricity generation in north-west India? evaluation of options using the analytical hierarchy process
-
Nixon J.D., Dey P.K., Davies P.A. Which is the best solar thermal collection technology for electricity generation in north-west India? evaluation of options using the analytical hierarchy process. Energy 2010, 35(2):5230-5240.
-
(2010)
Energy
, vol.35
, Issue.2
, pp. 5230-5240
-
-
Nixon, J.D.1
Dey, P.K.2
Davies, P.A.3
-
17
-
-
78650748569
-
Multi-criteria analysis for the selection of space heating system in an industrial building
-
Chinese D., Nardin G., Saro O. Multi-criteria analysis for the selection of space heating system in an industrial building. Energy 2011, 36:556-565.
-
(2011)
Energy
, vol.36
, pp. 556-565
-
-
Chinese, D.1
Nardin, G.2
Saro, O.3
-
18
-
-
0242365693
-
Fuzzy group decision making for facility location selection
-
Kahraman C., Ruan D., Doĝan I. Fuzzy group decision making for facility location selection. Information Sciences 2003, 157:135-153.
-
(2003)
Information Sciences
, vol.157
, pp. 135-153
-
-
Kahraman, C.1
Ruan, D.2
Doĝan, I.3
-
19
-
-
38949134545
-
A fuzzy multi-criteria decision model for international tourist hotels location selection
-
Chou T.Y., Hsu C.L., Chen M.C. A fuzzy multi-criteria decision model for international tourist hotels location selection. International Journal of Hospitability Management 2008, 27:293-301.
-
(2008)
International Journal of Hospitability Management
, vol.27
, pp. 293-301
-
-
Chou, T.Y.1
Hsu, C.L.2
Chen, M.C.3
-
20
-
-
40949146570
-
A new method for plant location selection problem: A fuzzy AHP approach
-
IEEE International Conference on System, Man and Cybernetics
-
Kaboli A, Aryanezhad MB, Shahanaghi K, Niroomand J. A new method for plant location selection problem: A fuzzy AHP approach. IEEE International Conference on System, Man and Cybernetics 2007;582-86.
-
(2007)
, pp. 582-586
-
-
Kaboli, A.1
Aryanezhad, M.B.2
Shahanaghi, K.3
Niroomand, J.4
-
21
-
-
69349099688
-
A comparative analysis for multiattribute selection among renewable energy alternatives using fuzzy axiomatic design and fuzzy analytic hierarchy process
-
Kahraman C., Kaya I., Cebi S. A comparative analysis for multiattribute selection among renewable energy alternatives using fuzzy axiomatic design and fuzzy analytic hierarchy process. Energy 2009, 34(10):1603-1616.
-
(2009)
Energy
, vol.34
, Issue.10
, pp. 1603-1616
-
-
Kahraman, C.1
Kaya, I.2
Cebi, S.3
-
22
-
-
77953162158
-
Multicriteria renewable energy planning using an integrated fuzzy VIKOR & AHP methodology: the case of Istanbul
-
Kaya T., Kahraman C. Multicriteria renewable energy planning using an integrated fuzzy VIKOR & AHP methodology: the case of Istanbul. Energy 2010, 35(6):2517-2527.
-
(2010)
Energy
, vol.35
, Issue.6
, pp. 2517-2527
-
-
Kaya, T.1
Kahraman, C.2
-
24
-
-
48949118500
-
An analytic network process approach for locating undesirable facilities: an example from Istanbul, Turkey
-
Tuzkaya G., Önüt S., Tuzkaya U.R., Gülsün B. An analytic network process approach for locating undesirable facilities: an example from Istanbul, Turkey. Journal of Environmental Management 2008, 88(4):970-983.
-
(2008)
Journal of Environmental Management
, vol.88
, Issue.4
, pp. 970-983
-
-
Tuzkaya, G.1
Önüt, S.2
Tuzkaya, U.R.3
Gülsün, B.4
-
26
-
-
0003099335
-
The outranking approach and the foundations of ELECTRE methods
-
Roy B. The outranking approach and the foundations of ELECTRE methods. Decision Theory 1991, 31:49-73.
-
(1991)
Decision Theory
, vol.31
, pp. 49-73
-
-
Roy, B.1
-
31
-
-
0242269345
-
PROMETHEE and AHP: the design of operational synergies in multicriteria analysis: strengthening PROMETHEE with ideas of AHP
-
Macharis C., Springael J., de Brucker K., Verbeke A. PROMETHEE and AHP: the design of operational synergies in multicriteria analysis: strengthening PROMETHEE with ideas of AHP. European Journal of Operational Research 2004, 153:307-317.
-
(2004)
European Journal of Operational Research
, vol.153
, pp. 307-317
-
-
Macharis, C.1
Springael, J.2
de Brucker, K.3
Verbeke, A.4
-
33
-
-
79953678931
-
Comparative analysis of multi-criteria decision making methodologies and implementation of a warehouse location selection problem
-
Özcan T., Çelebi N., Esnaf Ş. Comparative analysis of multi-criteria decision making methodologies and implementation of a warehouse location selection problem. Expert Systems with Applications 2011, 38:9773-9779.
-
(2011)
Expert Systems with Applications
, vol.38
, pp. 9773-9779
-
-
Özcan, T.1
Çelebi, N.2
Esnaf, Ş.3
-
34
-
-
80053506783
-
An AHP-based fuzzy interval TOPSIS assessment for sustainable expansion of the solid waste management system in Setúbal Peninsula, Portugal
-
Pires A., Chang N.-B., Martinho G. An AHP-based fuzzy interval TOPSIS assessment for sustainable expansion of the solid waste management system in Setúbal Peninsula, Portugal. Resources, Conservation and Recycling 2011, 56:7-21.
-
(2011)
Resources, Conservation and Recycling
, vol.56
, pp. 7-21
-
-
Pires, A.1
Chang, N.-B.2
Martinho, G.3
-
35
-
-
0023383194
-
A fuzzy multicriteria model for comparing energy projects
-
De M., Hipel K.W. A fuzzy multicriteria model for comparing energy projects. Energy 1987, 12(7):599-613.
-
(1987)
Energy
, vol.12
, Issue.7
, pp. 599-613
-
-
De, M.1
Hipel, K.W.2
-
36
-
-
0025700933
-
How to make a decision: the analytic hierarchy process
-
Saaty T.L. How to make a decision: the analytic hierarchy process. European Journal of Operational Research 1990, 48:9-26.
-
(1990)
European Journal of Operational Research
, vol.48
, pp. 9-26
-
-
Saaty, T.L.1
-
37
-
-
33745684420
-
Fuzzy analytical hierarchy process for evaluating and selecting a vendor in a supply chain
-
Haq A.N., Kannan G. Fuzzy analytical hierarchy process for evaluating and selecting a vendor in a supply chain. International Journal of Advanced Manufacturing Technology 2006, 29:826-835.
-
(2006)
International Journal of Advanced Manufacturing Technology
, vol.29
, pp. 826-835
-
-
Haq, A.N.1
Kannan, G.2
-
38
-
-
46149083525
-
Global supplier selection: a fuzzy-AHP approach
-
Chan F.T.S., Kumar N., Tiwari M.K., Lau H.C.W., Choy K.L. Global supplier selection: a fuzzy-AHP approach. International Journal of Production Research 2008, 46(14):3825-3857.
-
(2008)
International Journal of Production Research
, vol.46
, Issue.14
, pp. 3825-3857
-
-
Chan, F.T.S.1
Kumar, N.2
Tiwari, M.K.3
Lau, H.C.W.4
Choy, K.L.5
-
39
-
-
74549199414
-
Selection of maintenance policy for textile industry using hybrid multi-criteria decision making approach
-
Ilangkumaran M., Kumanan S. Selection of maintenance policy for textile industry using hybrid multi-criteria decision making approach. Journal of Manufacturing Technology Management 2009, 20(7):1009-1022.
-
(2009)
Journal of Manufacturing Technology Management
, vol.20
, Issue.7
, pp. 1009-1022
-
-
Ilangkumaran, M.1
Kumanan, S.2
-
40
-
-
41049110990
-
A fuzzy AHP application in government-sponsored R&D project selection
-
Huang C.C., Chu P.Y., Chiang Y.H. A fuzzy AHP application in government-sponsored R&D project selection. Omega 2008, 36:1038-1052.
-
(2008)
Omega
, vol.36
, pp. 1038-1052
-
-
Huang, C.C.1
Chu, P.Y.2
Chiang, Y.H.3
-
41
-
-
33749991524
-
Evaluation of knowledge portal development tools using fuzzy AHP approach: the case of Taiwanese stone industry
-
Kreng V.B., Wu C. Evaluation of knowledge portal development tools using fuzzy AHP approach: the case of Taiwanese stone industry. European Journal of Operational Research 2007, 176:1795-1810.
-
(2007)
European Journal of Operational Research
, vol.176
, pp. 1795-1810
-
-
Kreng, V.B.1
Wu, C.2
-
42
-
-
45849109218
-
Fuzzy AHP approach for selecting the suitable bridge construction method
-
Pan N.F. Fuzzy AHP approach for selecting the suitable bridge construction method. Automation in Construction 2008, 17:958-965.
-
(2008)
Automation in Construction
, vol.17
, pp. 958-965
-
-
Pan, N.F.1
-
46
-
-
0000672127
-
Applications of the extent analysis method on fuzzy AHP
-
Chang D.Y. Applications of the extent analysis method on fuzzy AHP. European Journal of Operational Research 1996, 95:649-655.
-
(1996)
European Journal of Operational Research
, vol.95
, pp. 649-655
-
-
Chang, D.Y.1
-
47
-
-
56349152568
-
Evaluation of hazardous waste transportation firms by using a two step fuzzy-AHP and TOPSIS methodology
-
Gumus A.T. Evaluation of hazardous waste transportation firms by using a two step fuzzy-AHP and TOPSIS methodology. Expert Systems with Applications 2009, 36:4067-4074.
-
(2009)
Expert Systems with Applications
, vol.36
, pp. 4067-4074
-
-
Gumus, A.T.1
-
48
-
-
79953677160
-
A Delphi-AHP-TOPSIS based benchmarking framework for performance improvement of a cold chain
-
Joshi R., Banwet D.K., Shankar R. A Delphi-AHP-TOPSIS based benchmarking framework for performance improvement of a cold chain. Expert Systems with Applications 2011, 38:10170-10182.
-
(2011)
Expert Systems with Applications
, vol.38
, pp. 10170-10182
-
-
Joshi, R.1
Banwet, D.K.2
Shankar, R.3
-
49
-
-
85018027699
-
-
Evaluation of potential pit-head sites for coal-based thermal power stations based on site-suitability index (SSI) using geospatial information.
-
Samantaray AK, Singh NP, Mukherjee TK. Evaluation of potential pit-head sites for coal-based thermal power stations based on site-suitability index (SSI) using geospatial information.
-
-
-
Samantaray, A.K.1
Singh, N.P.2
Mukherjee, T.K.3
-
50
-
-
33847394408
-
Use of multicriteria decision analysis methods for energy planning problems
-
Loken E. Use of multicriteria decision analysis methods for energy planning problems. Renewable Sustainable Energy Review 2007, 11:1584-1595.
-
(2007)
Renewable Sustainable Energy Review
, vol.11
, pp. 1584-1595
-
-
Loken, E.1
-
51
-
-
33748693686
-
Modeling the metrics of lean, agile and leagile supply chain: an ANP based approach
-
Agarwal A., Shankar R., Tiwari R. Modeling the metrics of lean, agile and leagile supply chain: an ANP based approach. European Journal of Operational Research 2006, 173(1):211-225.
-
(2006)
European Journal of Operational Research
, vol.173
, Issue.1
, pp. 211-225
-
-
Agarwal, A.1
Shankar, R.2
Tiwari, R.3
|