메뉴 건너뛰기




Volumn 17, Issue 8, 2008, Pages 958-965

Fuzzy AHP approach for selecting the suitable bridge construction method

Author keywords

Bridge construction; Expert knowledge; Fuzzy analytical hierarchy process; Fuzzy set theory; Multi criteria decision making

Indexed keywords

ANALYTIC HIERARCHY PROCESS; BRIDGES; CONSTRUCTION; CONSTRUCTION INDUSTRY; DECISION MAKING; FUZZY LOGIC; FUZZY SETS; HIERARCHICAL SYSTEMS; NUMBER THEORY; PROBLEM SOLVING;

EID: 45849109218     PISSN: 09265805     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.autcon.2008.03.005     Document Type: Article
Times cited : (280)

References (37)
  • 2
    • 45849100399 scopus 로고    scopus 로고
    • available at http://en.wikipedia.org/wiki/West Gate Bridge, accessed 8/15/2007
    • Wikipedia, West Gate Bridge (2007). http://en.wikipedia.org/wiki/West available at http://en.wikipedia.org/wiki/West Gate Bridge, accessed 8/15/2007
    • (2007) Wikipedia, West Gate Bridge
  • 3
    • 45849124115 scopus 로고    scopus 로고
    • available at http://news.bbc.co.uk/2/hi/asia-pacific/6945301.stm, accessed 9/20/2007
    • BBC News. Chinese bridge collapse kills 36 (2007). http://news.bbc.co.uk/2/hi/asia-pacific/6945301.stm available at http://news.bbc.co.uk/2/hi/asia-pacific/6945301.stm, accessed 9/20/2007
    • (2007) Chinese bridge collapse kills 36
    • BBC News1
  • 4
    • 0036605004 scopus 로고    scopus 로고
    • Automated inspection and restoration of steel bridges-a critical review of methods and enabling technologies
    • McCrea A., Chamberlain D., and Navon R. Automated inspection and restoration of steel bridges-a critical review of methods and enabling technologies. Automation in Construction 11 (2002) 351-373
    • (2002) Automation in Construction , vol.11 , pp. 351-373
    • McCrea, A.1    Chamberlain, D.2    Navon, R.3
  • 5
    • 25144487170 scopus 로고    scopus 로고
    • A fuzzy reasoning knowledge-based system for assessing rain impact in highway construction scheduling: Part 1. analytical model
    • Pan N.F., Hadipriono F.C., and Whitlatch E. A fuzzy reasoning knowledge-based system for assessing rain impact in highway construction scheduling: Part 1. analytical model. Journal of Intelligent and Fuzzy Systems 16 3 (2005) 157-167
    • (2005) Journal of Intelligent and Fuzzy Systems , vol.16 , Issue.3 , pp. 157-167
    • Pan, N.F.1    Hadipriono, F.C.2    Whitlatch, E.3
  • 6
    • 23744483570 scopus 로고    scopus 로고
    • Object-oriented framework for durability assessment and life cycle costing of highway bridges
    • Ugwu O.O., Kumaraswamy M.M., Kung F., and Ng S.T. Object-oriented framework for durability assessment and life cycle costing of highway bridges. Automation in Construction 14 (2005) 611-632
    • (2005) Automation in Construction , vol.14 , pp. 611-632
    • Ugwu, O.O.1    Kumaraswamy, M.M.2    Kung, F.3    Ng, S.T.4
  • 7
    • 33845719766 scopus 로고    scopus 로고
    • Evaluation of building performance using fuzzy FTA
    • Pan N.F. Evaluation of building performance using fuzzy FTA. Journal of Construction Management and Economics 24 12 (2006) 1241-1252
    • (2006) Journal of Construction Management and Economics , vol.24 , Issue.12 , pp. 1241-1252
    • Pan, N.F.1
  • 8
    • 29144478770 scopus 로고    scopus 로고
    • Sustainability appraisal in infrastructure projects (USAIP): Part 2: A case study in bridge design
    • Ugwu O.O., Kumaraswamy M.M., Wong A., and Ng S.T. Sustainability appraisal in infrastructure projects (USAIP): Part 2: A case study in bridge design. Automation in Construction 15 (2006) 229-238
    • (2006) Automation in Construction , vol.15 , pp. 229-238
    • Ugwu, O.O.1    Kumaraswamy, M.M.2    Wong, A.3    Ng, S.T.4
  • 12
    • 0032072401 scopus 로고    scopus 로고
    • Advanced automation or conventional construction process?
    • Hastak M. Advanced automation or conventional construction process?. Automation in Construction 7 (1998) 299-314
    • (1998) Automation in Construction , vol.7 , pp. 299-314
    • Hastak, M.1
  • 14
    • 11944249373 scopus 로고    scopus 로고
    • Contractor selection using the analytic network process
    • Cheng E.W.L., and Li H. Contractor selection using the analytic network process. Construction Management and Economics 22 (2004) 1021-1032
    • (2004) Construction Management and Economics , vol.22 , pp. 1021-1032
    • Cheng, E.W.L.1    Li, H.2
  • 16
    • 27744450360 scopus 로고    scopus 로고
    • Decision support system for selecting the proper project delivery method using Analytical Hierarchy Process (AHP)
    • Mahdi I.M., and Alreshaid K. Decision support system for selecting the proper project delivery method using Analytical Hierarchy Process (AHP). International Journal of Project Management 23 (2005) 564-572
    • (2005) International Journal of Project Management , vol.23 , pp. 564-572
    • Mahdi, I.M.1    Alreshaid, K.2
  • 18
    • 33744906554 scopus 로고    scopus 로고
    • Developing a model to measure the effectiveness of safety management systems of construction sites
    • Teo E.A.L., and Ling F.Y.Y. Developing a model to measure the effectiveness of safety management systems of construction sites. Building and Environment 41 11 (2006) 1584-1592
    • (2006) Building and Environment , vol.41 , Issue.11 , pp. 1584-1592
    • Teo, E.A.L.1    Ling, F.Y.Y.2
  • 20
    • 0034288043 scopus 로고    scopus 로고
    • The analytic hierarchy process applied to maintenance strategy selection
    • Bevilacqua M., and Braglia M. The analytic hierarchy process applied to maintenance strategy selection. Reliability Engineering and System Safety 70 1 (2000) 71-83
    • (2000) Reliability Engineering and System Safety , vol.70 , Issue.1 , pp. 71-83
    • Bevilacqua, M.1    Braglia, M.2
  • 21
    • 33645230448 scopus 로고    scopus 로고
    • A combined goal programming-AHP approach to maintenance selection problem
    • Bertolini M., and Bevilacqua M. A combined goal programming-AHP approach to maintenance selection problem. Reliability Engineering and System Safety 91 (2006) 839-848
    • (2006) Reliability Engineering and System Safety , vol.91 , pp. 839-848
    • Bertolini, M.1    Bevilacqua, M.2
  • 23
    • 0041325311 scopus 로고    scopus 로고
    • A procedure for multi-criteria selection of building assemblies
    • Nassar N., Thabet W., and Beliveau Y. A procedure for multi-criteria selection of building assemblies. Automation in Construction 12 (2003) 543-560
    • (2003) Automation in Construction , vol.12 , pp. 543-560
    • Nassar, N.1    Thabet, W.2    Beliveau, Y.3
  • 24
    • 46549093655 scopus 로고
    • Fuzzy hierarchy analysis
    • Buckley J.J. Fuzzy hierarchy analysis. Fuzzy Sets and Systems 17 (1985) 233-247
    • (1985) Fuzzy Sets and Systems , vol.17 , pp. 233-247
    • Buckley, J.J.1
  • 25
    • 0000914493 scopus 로고
    • Multi-criteria decision analysis with fuzzy pairwise comparison
    • Boender C.G.E., de Graan J.G., and Lootsma F.A. Multi-criteria decision analysis with fuzzy pairwise comparison. Fuzzy Sets and Systems 29 (1989) 133-143
    • (1989) Fuzzy Sets and Systems , vol.29 , pp. 133-143
    • Boender, C.G.E.1    de Graan, J.G.2    Lootsma, F.A.3
  • 26
    • 0000672127 scopus 로고    scopus 로고
    • Applications of the extent analysis method on fuzzy AHP
    • Chang D.Y. Applications of the extent analysis method on fuzzy AHP. European Journal of Operational Research 95 (1996) 649-655
    • (1996) European Journal of Operational Research , vol.95 , pp. 649-655
    • Chang, D.Y.1
  • 27
    • 0030837856 scopus 로고    scopus 로고
    • Evaluating naval tactical missile systems by fuzzy AHP based on the grade value of membership function
    • Cheng C.H. Evaluating naval tactical missile systems by fuzzy AHP based on the grade value of membership function. European Journal of Operational Research 96 (1996) 343-350
    • (1996) European Journal of Operational Research , vol.96 , pp. 343-350
    • Cheng, C.H.1
  • 28
    • 0031381524 scopus 로고    scopus 로고
    • Deriving weights from pairwise comparison matrices
    • Barzilai J. Deriving weights from pairwise comparison matrices. Journal of Operational Research Society 48 (1997) 1226-1232
    • (1997) Journal of Operational Research Society , vol.48 , pp. 1226-1232
    • Barzilai, J.1
  • 29
    • 0002296389 scopus 로고    scopus 로고
    • Extension of the TOPSIS for group decision-making under fuzzy environment
    • Chen C.T. Extension of the TOPSIS for group decision-making under fuzzy environment. Fuzzy Sets and Systems 114 (2000) 1-9
    • (2000) Fuzzy Sets and Systems , vol.114 , pp. 1-9
    • Chen, C.T.1
  • 30
    • 3342984611 scopus 로고    scopus 로고
    • Fuzzy MCDM approach for planning and design tenders selection in public office buildings
    • Hsieh T.Y., Lu S.T., and Tzeng G.H. Fuzzy MCDM approach for planning and design tenders selection in public office buildings. International Journal of Project Management 22 7 (2004) 573-584
    • (2004) International Journal of Project Management , vol.22 , Issue.7 , pp. 573-584
    • Hsieh, T.Y.1    Lu, S.T.2    Tzeng, G.H.3
  • 31
    • 29144521375 scopus 로고    scopus 로고
    • Fuzzy multi-attribute decision-making method based on eigenvector of fuzzy attribute evaluation space
    • Gu X., and Zhu Q. Fuzzy multi-attribute decision-making method based on eigenvector of fuzzy attribute evaluation space. Decision Support Systems 41 (2006) 400-410
    • (2006) Decision Support Systems , vol.41 , pp. 400-410
    • Gu, X.1    Zhu, Q.2
  • 32
    • 34447565099 scopus 로고    scopus 로고
    • Application of a fuzzy based decision making methodology to construction project risk assessment
    • Zeng J., An M., and Smith N.J. Application of a fuzzy based decision making methodology to construction project risk assessment. International Journal of Project Management 25 (2007) 589-600
    • (2007) International Journal of Project Management , vol.25 , pp. 589-600
    • Zeng, J.1    An, M.2    Smith, N.J.3
  • 33
    • 33847071199 scopus 로고    scopus 로고
    • Selection of optimum maintenance strategies based on a fuzzy analytic hierarchy process
    • Wang L., Chu J., and Wu J. Selection of optimum maintenance strategies based on a fuzzy analytic hierarchy process. International of production economics 107 (2007) 151-163
    • (2007) International of production economics , vol.107 , pp. 151-163
    • Wang, L.1    Chu, J.2    Wu, J.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.