메뉴 건너뛰기




Volumn 20, Issue 2, 2010, Pages 172-183

Nonlinear optimization method for short-term hydro scheduling considering head-dependency

Author keywords

Cascaded reservoirs; Head dependency; Nonlinear optimization; Short term hydro scheduling

Indexed keywords

ADDITIONAL COMPUTATION TIME; CASCADED RESERVOIRS; COMPETITIVE ENVIRONMENT; HYDRO SCHEDULING; HYDRO-SYSTEM; LINEAR OPTIMIZATION; NON-LINEAR OPTIMIZATION; NONLINEAR OPTIMIZATION METHODS; WATER DISCHARGES;

EID: 77949554829     PISSN: 1430144X     EISSN: 15463109     Source Type: Journal    
DOI: 10.1002/etep.301     Document Type: Article
Times cited : (44)

References (28)
  • 1
    • 0029404086 scopus 로고
    • Hydro-dominated short-term hydrothermal scheduling via a hybrid simulation-optimisation approach: A case study
    • Soares S, Ohishi T. Hydro-dominated short-term hydrothermal scheduling via a hybrid simulation-optimisation approach: A case study. IEE Proceedings- Generation Transmission and Distribution 1995; 142:569-575.
    • (1995) IEE Proceedings-generation Transmission and Distribution , vol.142 , pp. 569-575
    • Soares, S.1    Ohishi, T.2
  • 3
    • 43449119838 scopus 로고    scopus 로고
    • A spot price of electricity algorithm applied to lossy short-term hydrothermal scheduling problem with limited energy supply thermal units
    • Yasar C, Fadil S, Babadagi M. A spot price of electricity algorithm applied to lossy short-term hydrothermal scheduling problem with limited energy supply thermal units. European Transactions on Electrical Power 2008; 18:296-312.
    • (2008) European Transactions on Electrical Power , vol.18 , pp. 296-312
    • Yasar, C.1    Fadil, S.2    Babadagi, M.3
  • 8
    • 0029407272 scopus 로고
    • A multiobjective approach to the short-term scheduling of a hydroelectric power system
    • Lyra C, Ferreira LRM. A multiobjective approach to the short-term scheduling of a hydroelectric power system. IEEE Transactions on Power Systems 1995; 10:1750-1755.
    • (1995) IEEE Transactions on Power Systems , vol.10 , pp. 1750-1755
    • Lyra, C.1    Ferreira, L.R.M.2
  • 9
    • 0036474056 scopus 로고    scopus 로고
    • Optimal dispatch of generating units of the Itaipú hydroelectric plant
    • Arce A, Ohishi T, Soares S. Optimal dispatch of generating units of the Itaipú hydroelectric plant. IEEE Transactions on Power Systems 2002; 17:154-158.
    • (2002) IEEE Transactions on Power Systems , vol.17 , pp. 154-158
    • Arce, A.1    Ohishi, T.2    Soares, S.3
  • 11
    • 0036778841 scopus 로고    scopus 로고
    • Short term hydro scheduling using two-phase neural network
    • Naresh R, Sharma J. Short term hydro scheduling using two-phase neural network. Electrical Power and Energy Systems 2002; 24:583-590.
    • (2002) Electrical Power and Energy Systems , vol.24 , pp. 583-590
    • Naresh, R.1    Sharma, J.2
  • 12
    • 0037210636 scopus 로고    scopus 로고
    • Hopfield neural networks for optimal scheduling of fixed head hydrothermal power systems
    • Basu M. Hopfield neural networks for optimal scheduling of fixed head hydrothermal power systems. Electric Power Systems Research 2003; 64:11-15.
    • (2003) Electric Power Systems Research , vol.64 , pp. 11-15
    • Basu, M.1
  • 13
    • 18544381881 scopus 로고    scopus 로고
    • A self-adaptive chaotic particle swarm algorithm for short term hydroelectric system scheduling in deregulated environment
    • Jiang CW, Bompard E. A self-adaptive chaotic particle swarm algorithm for short term hydroelectric system scheduling in deregulated environment. Energy Conversion and Management 2005; 46:2689-2696.
    • (2005) Energy Conversion and Management , vol.46 , pp. 2689-2696
    • Jiang, C.W.1    Bompard, E.2
  • 14
    • 41949127174 scopus 로고    scopus 로고
    • An enhanced differential evolution algorithm for daily optimal hydro generation scheduling
    • Yuan X, Zhang Y, Wang L, Yuan Y. An enhanced differential evolution algorithm for daily optimal hydro generation scheduling. Computers & Mathematics with Applications 2008; 55:2458-2468.
    • (2008) Computers & Mathematics with Applications , vol.55 , pp. 2458-2468
    • Yuan, X.1    Zhang, Y.2    Wang, L.3    Yuan, Y.4
  • 15
    • 33746601474 scopus 로고    scopus 로고
    • Hydraulically coupled power-plants commitment within short-term operation planning in mixed hydro-thermal power systems
    • Rakic MV, Markovic ZM. Hydraulically coupled power-plants commitment within short-term operation planning in mixed hydro-thermal power systems. European Transactions on Electrical Power 1997; 7:323-330.
    • (1997) European Transactions on Electrical Power , vol.7 , pp. 323-330
    • Rakic, M.V.1    Markovic, Z.M.2
  • 16
    • 11344285550 scopus 로고    scopus 로고
    • Short term hydroelectric scheduling combining network flow and interior point approaches
    • Oliveira ARL, Soares S, Nepomuceno L. Short term hydroelectric scheduling combining network flow and interior point approaches. Electrical Power and Energy Systems 2005; 27:91-99.
    • (2005) Electrical Power and Energy Systems , vol.27 , pp. 91-99
    • Oliveira, A.R.L.1    Soares, S.2    Nepomuceno, L.3
  • 18
    • 0033080313 scopus 로고    scopus 로고
    • Scheduling hydro power systems with restricted operating zones and discharge ramping constraints
    • Guan X, Svoboda A, Li C-A. Scheduling hydro power systems with restricted operating zones and discharge ramping constraints. IEEE Transactions on Power Systems 1999; 14:126-131.
    • (1999) IEEE Transactions on Power Systems , vol.14 , pp. 126-131
    • Guan, X.1    Svoboda, A.2    Li, C.-A.3
  • 22
    • 33646075166 scopus 로고    scopus 로고
    • Improving the B&B search for large-scale hydrothermal weekly scheduling problems
    • Parrilla E, García-González J. Improving the B&B search for large-scale hydrothermal weekly scheduling problems. Electrical Power and Energy Systems 2006; 28:339-348.
    • (2006) Electrical Power and Energy Systems , vol.28 , pp. 339-348
    • Parrilla, E.1    García-González, J.2
  • 23
    • 33947674280 scopus 로고    scopus 로고
    • Risk-averse profit-based optimal scheduling of a hydro-chain in the day-ahead electricity market
    • García-González J, Parrilla E, Mateo A. Risk-averse profit-based optimal scheduling of a hydro-chain in the day-ahead electricity market. European Journal of Operational Research 2007; 181:1354-1369.
    • (2007) European Journal of Operational Research , vol.181 , pp. 1354-1369
    • García-González, J.1    Parrilla, E.2    Mateo, A.3
  • 24
    • 36849045754 scopus 로고    scopus 로고
    • Short-term hydropower production planning by stochastic programming
    • Fleten S-E, Kristoffersenb TK. Short-term hydropower production planning by stochastic programming. Computers & Operations Research 2008; 35:2656-2671.
    • (2008) Computers & Operations Research , vol.35 , pp. 2656-2671
    • Fleten, S.-E.1    Kristoffersenb, T.K.2
  • 25
    • 0032592944 scopus 로고    scopus 로고
    • Scheduling hydrothermal power systems with cascaded and head-dependent reservoirs
    • Ni E, Guan X, Li R. Scheduling hydrothermal power systems with cascaded and head-dependent reservoirs. IEEE Transactions on Power Systems 1999; 14:1127-1132.
    • (1999) IEEE Transactions on Power Systems , vol.14 , pp. 1127-1132
    • Ni, E.1    Guan, X.2    Li, R.3
  • 26
    • 34248231120 scopus 로고    scopus 로고
    • Dynamic optimal power flow approach to account for consumer response in short term hydrothermal coordination studies
    • Uturbey W, Simões Costa A. Dynamic optimal power flow approach to account for consumer response in short term hydrothermal coordination studies. IET Generation Transmission and Distribution 2007; 1:414-421.
    • (2007) IET Generation Transmission and Distribution , vol.1 , pp. 414-421
    • Uturbey, W.1    Simões, C.A.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.