메뉴 건너뛰기




Volumn 36, Issue 8, 2012, Pages 3513-3544

A discrete time optimal control model with uncertainty for dynamic machine allocation problem and its application to manufacturing and construction industries

Author keywords

Discrete time; Dynamic allocation; Machine management; Optimal control

Indexed keywords

APPLICATION EXAMPLES; CRISP MODELS; DISCRETE TIME; DISCRETE-TIME OPTIMAL CONTROL; DYNAMIC ALLOCATIONS; EXPECTED VALUE MODEL; EXPECTED VALUE OPERATORS; FUZZY VARIABLE; MACHINE ALLOCATION; MACHINE BREAKDOWN; MACHINE FAILURE; MACHINE MANAGEMENTS; MACHINE PRODUCTIVITY; OPTIMAL CONTROL MODEL; OPTIMAL CONTROLS; OPTIMIZATION METHOD; PARTICLE SWARM OPTIMIZATION APPROACHES; THEORETICAL ALGORITHMS;

EID: 84859841421     PISSN: 0307904X     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.apm.2011.10.031     Document Type: Article
Times cited : (18)

References (32)
  • 1
    • 33745002932 scopus 로고    scopus 로고
    • Equipment management strategy under machine capacity loss
    • Sheu D., Lin J. Equipment management strategy under machine capacity loss. Int. J. Prod. Econ. 2006, 103:308-315.
    • (2006) Int. J. Prod. Econ. , vol.103 , pp. 308-315
    • Sheu, D.1    Lin, J.2
  • 2
    • 0036568443 scopus 로고    scopus 로고
    • Resource allocation in a few industries: determinants and trends
    • Segelod E. Resource allocation in a few industries: determinants and trends. Int. J. Prod. Econ. 2002, 77:63-77.
    • (2002) Int. J. Prod. Econ. , vol.77 , pp. 63-77
    • Segelod, E.1
  • 3
    • 0030269827 scopus 로고    scopus 로고
    • Limited-resource allocation in construction projects
    • Khattab M., Søyland K. Limited-resource allocation in construction projects. Comput. Ind. Eng. 1996, 31:229-232.
    • (1996) Comput. Ind. Eng. , vol.31 , pp. 229-232
    • Khattab, M.1    Søyland, K.2
  • 4
    • 17444380674 scopus 로고    scopus 로고
    • On the coefficients of variation of uptime and downtime n manufacturing equipment
    • Li J.S., Meerkov S.M. On the coefficients of variation of uptime and downtime n manufacturing equipment. Math. Probl. Eng. 2005, 1:1-6.
    • (2005) Math. Probl. Eng. , vol.1 , pp. 1-6
    • Li, J.S.1    Meerkov, S.M.2
  • 5
    • 0030244136 scopus 로고    scopus 로고
    • Path and equipment allocation for multiple, concurrent processes on networked process plant units
    • Uthgenannt J.A. Path and equipment allocation for multiple, concurrent processes on networked process plant units. Comput. Chem. Eng. 1996, 20:1081-1087.
    • (1996) Comput. Chem. Eng. , vol.20 , pp. 1081-1087
    • Uthgenannt, J.A.1
  • 7
    • 0029216440 scopus 로고
    • Effects of equipment failure uncertainty in batch production scheduling
    • Sanmartí E., Espuña A., Puigjaner L. Effects of equipment failure uncertainty in batch production scheduling. Comput. Chem. Eng. 1995, 19:565-570.
    • (1995) Comput. Chem. Eng. , vol.19 , pp. 565-570
    • Sanmartí, E.1    Espuña, A.2    Puigjaner, L.3
  • 8
    • 70349334594 scopus 로고    scopus 로고
    • Modeling the dynamics of heavy equipment management practices and downtime in large highway contractors
    • Prasertrungruang T., Hadikusumo B.H.W. Modeling the dynamics of heavy equipment management practices and downtime in large highway contractors. J. Constr. Eng. Manage. ASCE 2009, 135(10):939-947.
    • (2009) J. Constr. Eng. Manage. ASCE , vol.135 , Issue.10 , pp. 939-947
    • Prasertrungruang, T.1    Hadikusumo, B.H.W.2
  • 9
    • 43449083507 scopus 로고    scopus 로고
    • Optimal equipment allocation for high plant flexibility: an industrial case study
    • Castro P.M., Novais A.Q., Carvalho A. Optimal equipment allocation for high plant flexibility: an industrial case study. Ind. Eng. Chem. Res. 2008, 47(8):2742-2761.
    • (2008) Ind. Eng. Chem. Res. , vol.47 , Issue.8 , pp. 2742-2761
    • Castro, P.M.1    Novais, A.Q.2    Carvalho, A.3
  • 10
    • 33751396886 scopus 로고    scopus 로고
    • A resource portfolio model for equipment investment and allocation of semiconductor testing industry
    • Wang K., Wang S., Yang S. A resource portfolio model for equipment investment and allocation of semiconductor testing industry. Eur. J. Oper. Res. 2007, 179(2):390-403.
    • (2007) Eur. J. Oper. Res. , vol.179 , Issue.2 , pp. 390-403
    • Wang, K.1    Wang, S.2    Yang, S.3
  • 11
    • 33845270417 scopus 로고    scopus 로고
    • Optimal preventive maintenance of leased equipment with corrective minimal repairs
    • Jaturonnatee J., Murthy D.N.P., Boondiskulchok R. Optimal preventive maintenance of leased equipment with corrective minimal repairs. Eur. J. Oper. Res. 2006, 174(1):201-215.
    • (2006) Eur. J. Oper. Res. , vol.174 , Issue.1 , pp. 201-215
    • Jaturonnatee, J.1    Murthy, D.N.P.2    Boondiskulchok, R.3
  • 12
    • 33645242898 scopus 로고    scopus 로고
    • Optimal periodic preventive maintenance policy for leased equipment
    • Pongpech J., Murthy D.N.P. Optimal periodic preventive maintenance policy for leased equipment. Reliab. Eng. Syst. Safe. 2006, 91(7):772-777.
    • (2006) Reliab. Eng. Syst. Safe. , vol.91 , Issue.7 , pp. 772-777
    • Pongpech, J.1    Murthy, D.N.P.2
  • 13
    • 33846303577 scopus 로고    scopus 로고
    • Optimal preventive maintenance for equipment with two quality states and general failure time distributions
    • Panagiotidou S., Tagaras G. Optimal preventive maintenance for equipment with two quality states and general failure time distributions. Eur. J. Oper. Res. 2007, 180(1):329-353.
    • (2007) Eur. J. Oper. Res. , vol.180 , Issue.1 , pp. 329-353
    • Panagiotidou, S.1    Tagaras, G.2
  • 14
    • 29744438237 scopus 로고    scopus 로고
    • Maintenance strategy based on a multicriterion classification of equipments
    • Gómez de León Hijes F., Javier Ruiz Cartagena J. Maintenance strategy based on a multicriterion classification of equipments. Reliab. Eng. Syst. Safe. 2006, 91(4):444-451.
    • (2006) Reliab. Eng. Syst. Safe. , vol.91 , Issue.4 , pp. 444-451
    • Gómez de León Hijes, F.1    Javier Ruiz Cartagena, J.2
  • 15
    • 0033233872 scopus 로고    scopus 로고
    • Refractory castables of the new generation in the production of cast iron and steel
    • Akselŕod L.M. Refractory castables of the new generation in the production of cast iron and steel. Refract. Ind. Ceram. 1999, 40(7-8):363-370.
    • (1999) Refract. Ind. Ceram. , vol.40 , Issue.7-8 , pp. 363-370
    • Akselŕod, L.M.1
  • 17
    • 19644401411 scopus 로고    scopus 로고
    • Replacement decisions with maintenance under uncertainty: an imbedded optimal control model
    • Dogramaci A., Fraiman N. Replacement decisions with maintenance under uncertainty: an imbedded optimal control model. Oper. Res. 2004, 52:785-794.
    • (2004) Oper. Res. , vol.52 , pp. 785-794
    • Dogramaci, A.1    Fraiman, N.2
  • 18
    • 34249101884 scopus 로고    scopus 로고
    • Machine reliability and preventive maintenance planning for cellular manufacturing systems
    • Das K., Lashkari R., Sengupta S. Machine reliability and preventive maintenance planning for cellular manufacturing systems. Eur. J. Oper. Res. 2007, 183:162-180.
    • (2007) Eur. J. Oper. Res. , vol.183 , pp. 162-180
    • Das, K.1    Lashkari, R.2    Sengupta, S.3
  • 19
    • 33344467496 scopus 로고    scopus 로고
    • Testing for dependency of failure times in life testing
    • McCool J. Testing for dependency of failure times in life testing. Technometrics 2006, 48:41-48.
    • (2006) Technometrics , vol.48 , pp. 41-48
    • McCool, J.1
  • 20
    • 30944464890 scopus 로고    scopus 로고
    • About statistics in fatigue strength
    • Seifried A. About statistics in fatigue strength. Materialwiss. Werkst. 2004, 35:93-111.
    • (2004) Materialwiss. Werkst. , vol.35 , pp. 93-111
    • Seifried, A.1
  • 21
    • 0010355729 scopus 로고
    • Effects of warranty execution on warranty reserve costs
    • Patankar J., Mitra A. Effects of warranty execution on warranty reserve costs. Manage. Sci. 1995, 41:395-400.
    • (1995) Manage. Sci. , vol.41 , pp. 395-400
    • Patankar, J.1    Mitra, A.2
  • 23
    • 0001326556 scopus 로고    scopus 로고
    • Reliability analysis of shovel machines used in an open cast coal mine
    • Samanta B., Sarkar B., Mukherjee S. Reliability analysis of shovel machines used in an open cast coal mine. Miner. Resour. Eng. 2001, 10:219-231.
    • (2001) Miner. Resour. Eng. , vol.10 , pp. 219-231
    • Samanta, B.1    Sarkar, B.2    Mukherjee, S.3
  • 24
    • 33846291054 scopus 로고    scopus 로고
    • Delay time analysis in microtunneling projects
    • Hegab M., Smith G. Delay time analysis in microtunneling projects. J. Constr. Eng. Manage. 2007, 133:191-195.
    • (2007) J. Constr. Eng. Manage. , vol.133 , pp. 191-195
    • Hegab, M.1    Smith, G.2
  • 25
    • 67549098078 scopus 로고    scopus 로고
    • A class of multi-objective expected value decision-making model with birandom coefficients and its application to flow shop scheduling problem
    • Xu J.P., Zhou X.Y. A class of multi-objective expected value decision-making model with birandom coefficients and its application to flow shop scheduling problem. Inform. Sci. 2009, 179(17):2997-3017.
    • (2009) Inform. Sci. , vol.179 , Issue.17 , pp. 2997-3017
    • Xu, J.P.1    Zhou, X.Y.2
  • 26
  • 28
    • 0002194031 scopus 로고
    • Fuzzy variables
    • Nahmias S. Fuzzy variables. Fuzzy Set. Syst. 1978, 1:97-110.
    • (1978) Fuzzy Set. Syst. , vol.1 , pp. 97-110
    • Nahmias, S.1
  • 30
    • 33745871133 scopus 로고    scopus 로고
    • Geological and geotechnical characteristics of Xiaolangdi dam, Yellow River, China
    • Liu F., Yu Q., Zhang S., Hou Q. Geological and geotechnical characteristics of Xiaolangdi dam, Yellow River, China. Bull. Eng. Geol. Environ. 2006, 65(3):289-295.
    • (2006) Bull. Eng. Geol. Environ. , vol.65 , Issue.3 , pp. 289-295
    • Liu, F.1    Yu, Q.2    Zhang, S.3    Hou, Q.4
  • 31
    • 79960214268 scopus 로고    scopus 로고
    • Applying optimal control model to dynamic equipment allocation problem: case study of concrete-faced rockfill dam construction project
    • Xu J.P., Zeng Z.Q. Applying optimal control model to dynamic equipment allocation problem: case study of concrete-faced rockfill dam construction project. J. Constr. Eng. Manage. 2011, 137(7):536-550.
    • (2011) J. Constr. Eng. Manage. , vol.137 , Issue.7 , pp. 536-550
    • Xu, J.P.1    Zeng, Z.Q.2
  • 32
    • 0003331505 scopus 로고    scopus 로고
    • A network parallel genetic algorithm for the one machine sequencing problem
    • Mayer M.K. A network parallel genetic algorithm for the one machine sequencing problem. Comput. Math. Appl. 1999, 37(3):71-78.
    • (1999) Comput. Math. Appl. , vol.37 , Issue.3 , pp. 71-78
    • Mayer, M.K.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.