-
1
-
-
33745002932
-
Equipment management strategy under machine capacity loss
-
Sheu D., Lin J. Equipment management strategy under machine capacity loss. Int. J. Prod. Econ. 2006, 103:308-315.
-
(2006)
Int. J. Prod. Econ.
, vol.103
, pp. 308-315
-
-
Sheu, D.1
Lin, J.2
-
2
-
-
0036568443
-
Resource allocation in a few industries: determinants and trends
-
Segelod E. Resource allocation in a few industries: determinants and trends. Int. J. Prod. Econ. 2002, 77:63-77.
-
(2002)
Int. J. Prod. Econ.
, vol.77
, pp. 63-77
-
-
Segelod, E.1
-
3
-
-
0030269827
-
Limited-resource allocation in construction projects
-
Khattab M., Søyland K. Limited-resource allocation in construction projects. Comput. Ind. Eng. 1996, 31:229-232.
-
(1996)
Comput. Ind. Eng.
, vol.31
, pp. 229-232
-
-
Khattab, M.1
Søyland, K.2
-
4
-
-
17444380674
-
On the coefficients of variation of uptime and downtime n manufacturing equipment
-
Li J.S., Meerkov S.M. On the coefficients of variation of uptime and downtime n manufacturing equipment. Math. Probl. Eng. 2005, 1:1-6.
-
(2005)
Math. Probl. Eng.
, vol.1
, pp. 1-6
-
-
Li, J.S.1
Meerkov, S.M.2
-
5
-
-
0030244136
-
Path and equipment allocation for multiple, concurrent processes on networked process plant units
-
Uthgenannt J.A. Path and equipment allocation for multiple, concurrent processes on networked process plant units. Comput. Chem. Eng. 1996, 20:1081-1087.
-
(1996)
Comput. Chem. Eng.
, vol.20
, pp. 1081-1087
-
-
Uthgenannt, J.A.1
-
7
-
-
0029216440
-
Effects of equipment failure uncertainty in batch production scheduling
-
Sanmartí E., Espuña A., Puigjaner L. Effects of equipment failure uncertainty in batch production scheduling. Comput. Chem. Eng. 1995, 19:565-570.
-
(1995)
Comput. Chem. Eng.
, vol.19
, pp. 565-570
-
-
Sanmartí, E.1
Espuña, A.2
Puigjaner, L.3
-
8
-
-
70349334594
-
Modeling the dynamics of heavy equipment management practices and downtime in large highway contractors
-
Prasertrungruang T., Hadikusumo B.H.W. Modeling the dynamics of heavy equipment management practices and downtime in large highway contractors. J. Constr. Eng. Manage. ASCE 2009, 135(10):939-947.
-
(2009)
J. Constr. Eng. Manage. ASCE
, vol.135
, Issue.10
, pp. 939-947
-
-
Prasertrungruang, T.1
Hadikusumo, B.H.W.2
-
9
-
-
43449083507
-
Optimal equipment allocation for high plant flexibility: an industrial case study
-
Castro P.M., Novais A.Q., Carvalho A. Optimal equipment allocation for high plant flexibility: an industrial case study. Ind. Eng. Chem. Res. 2008, 47(8):2742-2761.
-
(2008)
Ind. Eng. Chem. Res.
, vol.47
, Issue.8
, pp. 2742-2761
-
-
Castro, P.M.1
Novais, A.Q.2
Carvalho, A.3
-
10
-
-
33751396886
-
A resource portfolio model for equipment investment and allocation of semiconductor testing industry
-
Wang K., Wang S., Yang S. A resource portfolio model for equipment investment and allocation of semiconductor testing industry. Eur. J. Oper. Res. 2007, 179(2):390-403.
-
(2007)
Eur. J. Oper. Res.
, vol.179
, Issue.2
, pp. 390-403
-
-
Wang, K.1
Wang, S.2
Yang, S.3
-
11
-
-
33845270417
-
Optimal preventive maintenance of leased equipment with corrective minimal repairs
-
Jaturonnatee J., Murthy D.N.P., Boondiskulchok R. Optimal preventive maintenance of leased equipment with corrective minimal repairs. Eur. J. Oper. Res. 2006, 174(1):201-215.
-
(2006)
Eur. J. Oper. Res.
, vol.174
, Issue.1
, pp. 201-215
-
-
Jaturonnatee, J.1
Murthy, D.N.P.2
Boondiskulchok, R.3
-
12
-
-
33645242898
-
Optimal periodic preventive maintenance policy for leased equipment
-
Pongpech J., Murthy D.N.P. Optimal periodic preventive maintenance policy for leased equipment. Reliab. Eng. Syst. Safe. 2006, 91(7):772-777.
-
(2006)
Reliab. Eng. Syst. Safe.
, vol.91
, Issue.7
, pp. 772-777
-
-
Pongpech, J.1
Murthy, D.N.P.2
-
13
-
-
33846303577
-
Optimal preventive maintenance for equipment with two quality states and general failure time distributions
-
Panagiotidou S., Tagaras G. Optimal preventive maintenance for equipment with two quality states and general failure time distributions. Eur. J. Oper. Res. 2007, 180(1):329-353.
-
(2007)
Eur. J. Oper. Res.
, vol.180
, Issue.1
, pp. 329-353
-
-
Panagiotidou, S.1
Tagaras, G.2
-
14
-
-
29744438237
-
Maintenance strategy based on a multicriterion classification of equipments
-
Gómez de León Hijes F., Javier Ruiz Cartagena J. Maintenance strategy based on a multicriterion classification of equipments. Reliab. Eng. Syst. Safe. 2006, 91(4):444-451.
-
(2006)
Reliab. Eng. Syst. Safe.
, vol.91
, Issue.4
, pp. 444-451
-
-
Gómez de León Hijes, F.1
Javier Ruiz Cartagena, J.2
-
15
-
-
0033233872
-
Refractory castables of the new generation in the production of cast iron and steel
-
Akselŕod L.M. Refractory castables of the new generation in the production of cast iron and steel. Refract. Ind. Ceram. 1999, 40(7-8):363-370.
-
(1999)
Refract. Ind. Ceram.
, vol.40
, Issue.7-8
, pp. 363-370
-
-
Akselŕod, L.M.1
-
16
-
-
85040879729
-
Construction of concrete face rockfill dams
-
A. Varty, R.J. Boyle, E.D. Pritchard, R.E. Gill, Construction of concrete face rockfill dams, in: Proceedings of Concrete Face Rockfill Dams-Design, Construction, and Performance, 1985, pp. 435-458.
-
(1985)
Proceedings of Concrete Face Rockfill Dams-Design, Construction, and Performance
, pp. 435-458
-
-
Varty, A.1
Boyle, R.J.2
Pritchard, E.D.3
Gill, R.E.4
-
17
-
-
19644401411
-
Replacement decisions with maintenance under uncertainty: an imbedded optimal control model
-
Dogramaci A., Fraiman N. Replacement decisions with maintenance under uncertainty: an imbedded optimal control model. Oper. Res. 2004, 52:785-794.
-
(2004)
Oper. Res.
, vol.52
, pp. 785-794
-
-
Dogramaci, A.1
Fraiman, N.2
-
18
-
-
34249101884
-
Machine reliability and preventive maintenance planning for cellular manufacturing systems
-
Das K., Lashkari R., Sengupta S. Machine reliability and preventive maintenance planning for cellular manufacturing systems. Eur. J. Oper. Res. 2007, 183:162-180.
-
(2007)
Eur. J. Oper. Res.
, vol.183
, pp. 162-180
-
-
Das, K.1
Lashkari, R.2
Sengupta, S.3
-
19
-
-
33344467496
-
Testing for dependency of failure times in life testing
-
McCool J. Testing for dependency of failure times in life testing. Technometrics 2006, 48:41-48.
-
(2006)
Technometrics
, vol.48
, pp. 41-48
-
-
McCool, J.1
-
20
-
-
30944464890
-
About statistics in fatigue strength
-
Seifried A. About statistics in fatigue strength. Materialwiss. Werkst. 2004, 35:93-111.
-
(2004)
Materialwiss. Werkst.
, vol.35
, pp. 93-111
-
-
Seifried, A.1
-
21
-
-
0010355729
-
Effects of warranty execution on warranty reserve costs
-
Patankar J., Mitra A. Effects of warranty execution on warranty reserve costs. Manage. Sci. 1995, 41:395-400.
-
(1995)
Manage. Sci.
, vol.41
, pp. 395-400
-
-
Patankar, J.1
Mitra, A.2
-
23
-
-
0001326556
-
Reliability analysis of shovel machines used in an open cast coal mine
-
Samanta B., Sarkar B., Mukherjee S. Reliability analysis of shovel machines used in an open cast coal mine. Miner. Resour. Eng. 2001, 10:219-231.
-
(2001)
Miner. Resour. Eng.
, vol.10
, pp. 219-231
-
-
Samanta, B.1
Sarkar, B.2
Mukherjee, S.3
-
24
-
-
33846291054
-
Delay time analysis in microtunneling projects
-
Hegab M., Smith G. Delay time analysis in microtunneling projects. J. Constr. Eng. Manage. 2007, 133:191-195.
-
(2007)
J. Constr. Eng. Manage.
, vol.133
, pp. 191-195
-
-
Hegab, M.1
Smith, G.2
-
25
-
-
67549098078
-
A class of multi-objective expected value decision-making model with birandom coefficients and its application to flow shop scheduling problem
-
Xu J.P., Zhou X.Y. A class of multi-objective expected value decision-making model with birandom coefficients and its application to flow shop scheduling problem. Inform. Sci. 2009, 179(17):2997-3017.
-
(2009)
Inform. Sci.
, vol.179
, Issue.17
, pp. 2997-3017
-
-
Xu, J.P.1
Zhou, X.Y.2
-
26
-
-
34248666540
-
Fuzzy sets
-
Zadeh L.A. Fuzzy sets. Inform. Control 1965, 8:338-353.
-
(1965)
Inform. Control
, vol.8
, pp. 338-353
-
-
Zadeh, L.A.1
-
28
-
-
0002194031
-
Fuzzy variables
-
Nahmias S. Fuzzy variables. Fuzzy Set. Syst. 1978, 1:97-110.
-
(1978)
Fuzzy Set. Syst.
, vol.1
, pp. 97-110
-
-
Nahmias, S.1
-
30
-
-
33745871133
-
Geological and geotechnical characteristics of Xiaolangdi dam, Yellow River, China
-
Liu F., Yu Q., Zhang S., Hou Q. Geological and geotechnical characteristics of Xiaolangdi dam, Yellow River, China. Bull. Eng. Geol. Environ. 2006, 65(3):289-295.
-
(2006)
Bull. Eng. Geol. Environ.
, vol.65
, Issue.3
, pp. 289-295
-
-
Liu, F.1
Yu, Q.2
Zhang, S.3
Hou, Q.4
-
31
-
-
79960214268
-
Applying optimal control model to dynamic equipment allocation problem: case study of concrete-faced rockfill dam construction project
-
Xu J.P., Zeng Z.Q. Applying optimal control model to dynamic equipment allocation problem: case study of concrete-faced rockfill dam construction project. J. Constr. Eng. Manage. 2011, 137(7):536-550.
-
(2011)
J. Constr. Eng. Manage.
, vol.137
, Issue.7
, pp. 536-550
-
-
Xu, J.P.1
Zeng, Z.Q.2
-
32
-
-
0003331505
-
A network parallel genetic algorithm for the one machine sequencing problem
-
Mayer M.K. A network parallel genetic algorithm for the one machine sequencing problem. Comput. Math. Appl. 1999, 37(3):71-78.
-
(1999)
Comput. Math. Appl.
, vol.37
, Issue.3
, pp. 71-78
-
-
Mayer, M.K.1
|