메뉴 건너뛰기




Volumn 111, Issue 8, 2011, Pages 1332-1354

Modeling supply chain performance and stability

Author keywords

Autoregressive integrated moving average; Manufacturing industries; Overall performance index number; Supply chain management; Supply chain performance and stability; System dynamics

Indexed keywords

ANTICIPATORY ACTIONS; ARIMA MODELS; AUTO-REGRESSIVE INTEGRATED MOVING AVERAGE; COMBINED MODEL; CONTINUOUS IMPROVEMENTS; DESIGN/METHODOLOGY/APPROACH; INTEGRATED APPROACH; LONG-TERM MANAGEMENT; MANUFACTURING INDUSTRIES; ON-TIME DELIVERY; OPERATION MANAGERS; PERFORMANCE INDICES; PRODUCT RELIABILITY; SEMICONDUCTOR EQUIPMENT; SUPPLY CHAIN EFFICIENCY; SUPPLY CHAIN PERFORMANCE; SYSTEM DYNAMICS; TOP MANAGEMENT; WORKING EFFICIENCY;

EID: 84859168328     PISSN: 02635577     EISSN: None     Source Type: Journal    
DOI: 10.1108/02635571111171649     Document Type: Article
Times cited : (35)

References (64)
  • 1
    • 3242741390 scopus 로고    scopus 로고
    • Analyzing alternatives for improvement in supply chain performance
    • Agarwal, A. and Shankar, R. (2002), "Analyzing alternatives for improvement in supply chain performance", Work Study, Vol. 51 No. 1, pp. 32-7.
    • (2002) Work Study , vol.51 , Issue.1 , pp. 32-7
    • Agarwal, A.1    Shankar, R.2
  • 2
    • 0142018386 scopus 로고    scopus 로고
    • Renga: A systems approach to facilitating inter-organizational network development
    • DOI 10.1002/sdr.215, Consulting and Practice
    • Akkermans, H. (2001), "Renga: a system approach to facilitating inter-organizational network development", System Dynamics Review, Vol. 17 No. 3, pp. 179-93. (Pubitemid 33690313)
    • (2001) System Dynamics Review , vol.17 , Issue.3 , pp. 179-193
    • Akkermans, H.1
  • 5
    • 34447538190 scopus 로고    scopus 로고
    • Towards an aggregation performance measurement system model in a supply chain context
    • DOI 10.1016/j.compind.2007.05.012, PII S0166361507000759
    • Berrah, L. and Cliville, V. (2007), "Towards an aggregation performance measurement system model in a supply chain context", Computers in Industry, Vol. 58 No. 7, pp. 709-19. (Pubitemid 47064406)
    • (2007) Computers in Industry , vol.58 , Issue.7 , pp. 709-719
    • Berrah, L.1    Cliville, V.2
  • 7
    • 34447249471 scopus 로고    scopus 로고
    • Performance measurement of supply chain management: A balanced scorecard approach
    • DOI 10.1016/j.cie.2007.04.001, PII S0360835207000617
    • Bhagwat, R. and Sharma, M.K. (2007), "Performance measurement of supply chain management: a balanced scorecard approach", Computers&Industrial Engineering, Vol. 53 No. 1, pp. 43-62. (Pubitemid 47042304)
    • (2007) Computers and Industrial Engineering , vol.53 , Issue.1 , pp. 43-62
    • Bhagwat, R.1    Sharma, M.K.2
  • 8
    • 0040691456 scopus 로고    scopus 로고
    • Improving forecasting for telemarketing centers by ARIMA modeling with intervention
    • PII S0169207098000375
    • Bianchi, L., Jarrett, J. and Hanumara, R.C. (1998), "Improving forecasting for telemarketing centres by ARIMA modelling with intervention", International Journal of Forecasting, Vol. 14 No. 4, pp. 497-504. (Pubitemid 128340123)
    • (1998) International Journal of Forecasting , vol.14 , Issue.4 , pp. 497-504
    • Bianchi, L.1    Jarrett, J.2    Choudary Hanumara, R.3
  • 9
    • 34447514173 scopus 로고    scopus 로고
    • Evolution management towards interoperable supply chains using performance measurement
    • DOI 10.1016/j.compind.2007.05.011, PII S0166361507000760
    • Blanc, S., Ducq, Y. and Vallespir, B. (2007), "Evolution management towards interoperable supply chains using performance measurement", Computers in Industry, Vol. 58 No. 7, pp. 720-32. (Pubitemid 47064407)
    • (2007) Computers in Industry , vol.58 , Issue.7 , pp. 720-732
    • Blanc, S.1    Ducq, Y.2    Vallespir, B.3
  • 11
    • 0002035694 scopus 로고    scopus 로고
    • Using the balanced scorecard to measure supply chain performance
    • Brewer, P.C. and Speh, T.W. (2000), "Using the balanced scorecard to measure supply chain performance", Journal of Business Logistics, Vol. 21 No. 1, pp. 75-92.
    • (2000) Journal of Business Logistics , vol.21 , Issue.1 , pp. 75-92
    • Brewer, P.C.1    Speh, T.W.2
  • 12
    • 0037109647 scopus 로고    scopus 로고
    • Analysing supply chain performance using a balanced measurement method
    • DOI 10.1080/00207540210161669
    • Bullinger, H.J., Kuhner, M. and Hoof, A.V. (2002), "Analyzing supply chain performance using a balanced measurement method", International Journal of Production Research, Vol. 40 No. 15, pp. 3533-43. (Pubitemid 35377567)
    • (2002) International Journal of Production Research , vol.40 , Issue.15 SPEC. , pp. 3533-3543
    • Bullinger, H.-J.1    Kuhner, M.2    Van Hoof, A.3
  • 14
    • 3242712963 scopus 로고    scopus 로고
    • An innovative performance measurement method for supply chain management
    • DOI 10.1108/13598540310484618
    • Chan, F.T.S. and Qi, H.J. (2003), "An innovative performance measurement method for supply chain management", Supply Chain Management: An International Journal, Vol. 8 No. 3, pp. 209-23. (Pubitemid 38947751)
    • (2003) Supply Chain Management , vol.8 , Issue.3 , pp. 209-223
    • Chan, F.T.S.1    Qi, H.J.2
  • 17
    • 79952747135 scopus 로고    scopus 로고
    • An ARIMA-intervention analysis model for the financial crisis in China's manufacturing industry
    • Chung, R.C.P., Ip, W.H. and Chan, S.L. (2009), "An ARIMA-intervention analysis model for the financial crisis in China's manufacturing industry", International Journal of Engineering Business Management, Vol. 1 No. 1, pp. 15-18.
    • (2009) International Journal of Engineering Business Management , vol.1 , Issue.1 , pp. 15-18
    • Chung, R.C.P.1    Ip, W.H.2    Chan, S.L.3
  • 18
    • 79953885222 scopus 로고    scopus 로고
    • Changing perspective of capabilities in the dynamic supply chain era
    • Defee, C.C. and Fugate, B.S. (2010), "Changing perspective of capabilities in the dynamic supply chain era", The International Journal of Logistics Management, Vol. 21 No. 2, pp. 180-206.
    • (2010) The International Journal of Logistics Management , vol.21 , Issue.2 , pp. 180-206
    • Defee, C.C.1    Fugate, B.S.2
  • 19
    • 33947662628 scopus 로고    scopus 로고
    • Supply chain coordination with contracts game between complementary suppliers
    • Ding, D. and Chen, J. (2007), "Supply chain coordination with contracts game between complementary suppliers", International Journal of Information Technology & Decision Making, Vol. 6 No. 1, pp. 163-75.
    • (2007) International Journal of Information Technology & Decision Making , vol.6 , Issue.1 , pp. 163-75
    • Ding, D.1    Chen, J.2
  • 21
    • 35548986219 scopus 로고    scopus 로고
    • Information risks management in supply chains: An assessment and mitigation framework
    • Faisal, M.N., Banwet, D.K. and Shankar, R. (2007), "Information risks management in supply chains: an assessment and mitigation framework", Journal of Enterprise Information Management, Vol. 20 No. 6, pp. 677-99.
    • (2007) Journal of Enterprise Information Management , vol.20 , Issue.6 , pp. 677-99
    • Faisal, M.N.1    Banwet, D.K.2    Shankar, R.3
  • 22
    • 0001095296 scopus 로고    scopus 로고
    • Logistics Performance Measurement and Customer Success
    • PII S0019850197000783
    • Fawcett, S.E. and Cooper, M.B. (1998), "Logistics performance and measurement and customer success", Industrial Marketing Management, Vol. 27, pp. 341-57. (Pubitemid 128375190)
    • (1998) Industrial Marketing Management , vol.27 , Issue.4 , pp. 341-357
    • Fawcett, S.E.1    Cooper, M.B.2
  • 23
    • 0002725436 scopus 로고
    • Industry dynamics - A major breakthrough for decision makers
    • Forrester, J.W. (1958), "Industry dynamics - a major breakthrough for decision makers", Harvard Business Review, Vol. 36 No. 4, pp. 37-66.
    • (1958) Harvard Business Review , vol.36 , Issue.4 , pp. 37-66
    • Forrester, J.W.1
  • 27
    • 0031076668 scopus 로고    scopus 로고
    • An integrated dynamic performance measurement system for improving manufacturing competitiveness
    • Ghalayini, A.M., Noble, J.S. and Crowe, T.J. (1997), "An integrated dynamic performance measurement system for improving manufacturing competitiveness", International Journal of Production Economics, Vol. 48 No. 3, pp. 207-25. (Pubitemid 127382096)
    • (1997) International Journal of Production Economics , vol.48 , Issue.3 , pp. 207-225
    • Ghalayini, A.M.1    Noble, J.S.2    Crowe, T.J.3
  • 28
    • 79957606628 scopus 로고    scopus 로고
    • An ARIMA supply chain model with a generalized ordering policy
    • Gilbert, K.C. and Chatpattananan, V. (2006), "An ARIMA supply chain model with a generalized ordering policy", Journal of Modelling in Management, Vol. 1 No. 1, pp. 33-51.
    • (2006) Journal of Modelling in Management , vol.1 , Issue.1 , pp. 33-51
    • Gilbert, K.C.1    Chatpattananan, V.2
  • 31
    • 0031121196 scopus 로고    scopus 로고
    • Rule-based ARIMA models for FMS
    • PII S0924013696025319
    • Ip, W.H. (1997), "Rule-based ARIMA models for FMS", Journal of Materials Processing Technology, Vol. 66, pp. 240-3. (Pubitemid 127414973)
    • (1997) Journal of Materials Processing Technology , vol.66 , Issue.1-3 , pp. 240-243
    • Ip, W.H.1
  • 35
    • 33646355123 scopus 로고    scopus 로고
    • Methodology for monitoring supply chain performance: A fuzzy logic approach
    • Lau, H.C.W., Pang, K. and Wong, C.W.Y. (2001), "Methodology for monitoring supply chain performance: a fuzzy logic approach", Logistics Information Management, Vol. 15 No. 4, pp. 271-80.
    • (2001) Logistics Information Management , vol.15 , Issue.4 , pp. 271-80
    • Lau, H.C.W.1    Pang, K.2    Wong, C.W.Y.3
  • 36
    • 33746227577 scopus 로고    scopus 로고
    • Formulating business strategies from a stakeholder's perspective: Korean healthcare it business cases
    • DOI 10.1155/ASP.2005.541, PII S0219622005001714
    • Lim, G. and Lee, H. (2005), "Formulating business strategies from a stakeholder's perspective: Korean healthcare IT business cases", International Journal of Information Technology & Decision Making, Vol. 4 No. 4, pp. 541-66. (Pubitemid 44099614)
    • (2005) International Journal of Information Technology and Decision Making , vol.4 , Issue.4 , pp. 541-566
    • Lim, G.1    Lee, H.2    Kim, T.3
  • 38
  • 39
    • 0032613818 scopus 로고    scopus 로고
    • Defining supply chain management: A historical perspective and practical guidelines
    • Lummus, R.R. and Vokurka, R.J. (1999), "Defining supply chain management: a historical perspective and practical guidelines", Industrial Management & Data Systems, Vol. 99 No. 1, pp. 11-17.
    • (1999) Industrial Management & Data Systems , vol.99 , Issue.1 , pp. 11-17
    • Lummus, R.R.1    Vokurka, R.J.2
  • 40
    • 9144249730 scopus 로고    scopus 로고
    • Performance observation and analysis of an information re-engineered supply chain: A case study of an automotive firm
    • Lyons, A., Coleman, J., Kehoe, D. and Coronado, A. (2004), "Performance observation and analysis of an information re-engineered supply chain: a case study of an automotive firm", Industrial Management & Data Systems, Vol. 104 No. 8, pp. 658-66.
    • (2004) Industrial Management & Data Systems , vol.104 , Issue.8 , pp. 658-66
    • Lyons, A.1    Coleman, J.2    Kehoe, D.3    Coronado, A.4
  • 41
    • 3242699467 scopus 로고    scopus 로고
    • Reorganization of distribution in globalization of markets: The dynamic context of supply chain management", Supply Chain Management: The
    • Mattsson, L.G. (2003), "Reorganization of distribution in globalization of markets: the dynamic context of supply chain management", Supply Chain Management: An International Journal, Vol. 8 No. 5, pp. 416-26.
    • (2003) An International Journal , vol.8 , Issue.5 , pp. 416-26
    • Mattsson, L.G.1
  • 42
    • 2542478153 scopus 로고    scopus 로고
    • Metrics and performance measurement in operations management: Dealing with the metrics maze
    • Melnyk, S.A., Stewart, D.M. and Swink, M. (2004), "Metrics and performance measurement in operations management: dealing with the metrics maze", Journal of Operations Management, Vol. 22 No. 3, pp. 209-18.
    • (2004) Journal of Operations Management , vol.22 , Issue.3 , pp. 209-18
    • Melnyk, S.A.1    Stewart, D.M.2    Swink, M.3
  • 43
    • 0001996521 scopus 로고
    • An efficiency/effectiveness approach to logistics performance analysis
    • Mentzer, J.T. and Konrad, B.P. (1991), "An efficiency/effectiveness approach to logistics performance analysis", Journal of Business Logistics, Vol. 12 No. 1, pp. 33-62.
    • (1991) Journal of Business Logistics , vol.12 , Issue.1 , pp. 33-62
    • Mentzer, J.T.1    Konrad, B.P.2
  • 44
    • 0035437895 scopus 로고    scopus 로고
    • Supply chain strategies, capabilities, and performance
    • Morash, E.A. (2001), "Supply chain strategies, capabilities and performance", Transportation Journal, Vol. 41 No. 1, pp. 37-54. (Pubitemid 33382346)
    • (2001) Transportation Journal , vol.41 , Issue.1 , pp. 37-54
    • Morash, E.A.1
  • 45
    • 1642336323 scopus 로고    scopus 로고
    • Stability analysis and stabilization strategies for linear supply chains
    • Nagatani, T. and Helbing, D. (2004), "Stability analysis and stabilization strategies for linear supply chains", Physica A: Statistical and Theoretical Physics, Vol. 335 Nos 3/4, pp. 644-60.
    • (2004) Physica A: Statistical and Theoretical Physics , vol.335 , Issue.3-4 , pp. 644-60
    • Nagatani, T.1    Helbing, D.2
  • 46
    • 3843144923 scopus 로고
    • Performance measurement system design: A literature review and research agenda
    • DOI 10.1108/01443579510083622
    • Neely, A., Gregory, M. and Platts, K. (1995), "Performance measurement system design - a literature review and research agenda", International Journal of Operations & Production Management, Vol. 15 No. 4, pp. 80-116. (Pubitemid 39046837)
    • (1995) International Journal of Operations and Production Management , vol.15 , Issue.4 , pp. 80-116
    • Neely, A.1    Gregory, M.2    Platts, K.3
  • 48
    • 10444243337 scopus 로고    scopus 로고
    • Performance measurement and evaluation of suppliers in supply chain: An evolutionary fuzzy-based approach
    • Ohdar, R. and Ray, P.K. (2004), "Performance measurement and evaluation of suppliers in supply chain: an evolutionary fuzzy-based approach", Journal of Manufacturing Technology Management, Vol. 15 No. 8, pp. 723-34.
    • (2004) Journal of Manufacturing Technology Management , vol.15 , Issue.8 , pp. 723-34
    • Ohdar, R.1    Ray, P.K.2
  • 49
    • 0037448268 scopus 로고    scopus 로고
    • Does supply chain management really pay? Six perspectives to measure the performance of managing a supply chain
    • DOI 10.1016/S0377-2217(02)00396-X, PII S037722170200396X
    • Otto, A. and Kotzab, H. (2003), "Does supply chain management really pay? Six perspectives to measure the performance of managing a supply chain", European Journal of Operational Research, Vol. 144, pp. 306-20. (Pubitemid 35214205)
    • (2003) European Journal of Operational Research , vol.144 , Issue.2 , pp. 306-320
    • Otto, A.1    Kotzab, H.2
  • 50
    • 2442428307 scopus 로고    scopus 로고
    • The effectiveness of using e-collaboration tools in the supply chain: An assessment study with system dynamics
    • DOI 10.1016/S1478-4092(03)00005-0
    • Ovalle, O.R. and Marques, A.C. (2003), "The effectiveness of using e-collaboration tools in the supply chain: an assessment study with system dynamics", Journal of Purchasing & Supply Management, Vol. 9, pp. 151-63. (Pubitemid 38613748)
    • (2003) Journal of Purchasing and Supply Management , vol.9 , Issue.4 , pp. 151-163
    • Ovalle, O.R.1    Marquez, A.C.2
  • 52
    • 0030211890 scopus 로고    scopus 로고
    • The role of system dynamics in project management
    • DOI 10.1016/0263-7863(95)00075-5
    • Rodrigues, A. and Bowers, J. (1996), "The role of system dynamics in project management", International Journal of Project Management, Vol. 14 No. 4, pp. 213-20. (Pubitemid 126381460)
    • (1996) International Journal of Project Management , vol.14 , Issue.4 , pp. 213-220
    • Rodrigues, A.1    Bowers, J.2
  • 53
    • 0035627607 scopus 로고    scopus 로고
    • Quality management in a supply chain perspective: Strategic and operative choices in a textile-apparel network
    • Romano, P. and Vinelli, A. (2001), "Quality management in a supply chain perspective: strategic and operative choices in a textile-apparel network", International Journal of Operations & Production Management, Vol. 21 No. 4, pp. 446-60.
    • (2001) International Journal of Operations & Production Management , vol.21 , Issue.4 , pp. 446-60
    • Romano, P.1    Vinelli, A.2
  • 54
    • 69249164758 scopus 로고    scopus 로고
    • Can trend forecasting improve stability in supply chains? A response to Forrester's challenge in Appendix L of industrial dynamics
    • Saeed, K. (2009), "Can trend forecasting improve stability in supply chains? A response to Forrester's challenge in Appendix L of industrial dynamics", System Dynamics Review, Vol. 25 No. 1, pp. 63-78.
    • (2009) System Dynamics Review , vol.25 , Issue.1 , pp. 63-78
    • Saeed, K.1
  • 56
    • 0011637148 scopus 로고    scopus 로고
    • Benchmarking internal supply chain performance: Development of a framework
    • Shah, J. and Singh, N. (2001), "Benchmarking internal supply chain performance: development of a framework", Journal of Supply Chain Management, Vol. 37 No. 1, pp. 37-47.
    • (2001) Journal of Supply Chain Management , vol.37 , Issue.1 , pp. 37-47
    • Shah, J.1    Singh, N.2
  • 60
    • 0001849522 scopus 로고    scopus 로고
    • Time compression and supply chain management - A guided tour
    • Towill, D.R. (1996), "Time compression and supply chain management - a guided tour", Supply Chain Management: An International Journal, Vol. 1 No. 1, pp. 15-27. (Pubitemid 39010567)
    • (1996) Supply Chain Management , vol.1 , Issue.1 , pp. 15-27
    • Towill, D.R.1
  • 62
    • 33947128605 scopus 로고    scopus 로고
    • Supply chain performance measurement system using DEA modeling
    • DOI 10.1108/02635570710734271
    • Wong, W.P. and Wong, K.Y. (2007), "Supply chain performance measurement system using DEA modeling", Industrial Management & Data Systems, Vol. 107 No. 3, pp. 361-81. (Pubitemid 46399049)
    • (2007) Industrial Management and Data Systems , vol.107 , Issue.3 , pp. 361-381
    • Wong, W.P.1    Wong, K.Y.2
  • 63
    • 71849101065 scopus 로고    scopus 로고
    • Integrative performance evaluation for supply chain system based on logarithm triangular fuzzy number - AHP method
    • Yang, J. (2009), "Integrative performance evaluation for supply chain system based on logarithm triangular fuzzy number - AHP method", Kybernetes, Vol. 38 No. 10, pp. 1760-70.
    • (2009) Kybernetes , vol.38 , Issue.10 , pp. 1760-70
    • Yang, J.1
  • 64
    • 13244261013 scopus 로고    scopus 로고
    • An ARIMA approach to forecasting electricity price with accuracy improvement by predicted errors
    • 2004 IEEE Power Engineering Society General Meeting
    • Zhou, M., Yan, Z., Ni, Y. and Li, G. (2004), "An ARIMA approach to forecasting electricity price with accuracy improvement by predicted errors", IEEE: Power Engineering Society General Meeting, Vol. 1, pp. 233-8. (Pubitemid 40192000)
    • (2004) 2004 IEEE Power Engineering Society General Meeting , vol.1 , pp. 233-238
    • Zhou, M.1    Yan, Z.2    Ni, Y.3    Li, G.4


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.