메뉴 건너뛰기




Volumn 57, Issue 2, 2009, Pages 592-607

Embedded simulation on a multiprocessor job scheduling system with inspection

Author keywords

Embedded simulation; Inspection; Multiprocessor job scheduling

Indexed keywords

BERTH ALLOCATION; CONTAINER TERMINAL OPERATION; EMBEDDED SIMULATION; EMBEDDED TECHNIQUES; FIRST-IN-FIRST-OUT; FLOW-TIME; INSPECTION ACTIVITIES; JOB SCHEDULING; MULTI PROCESSOR SYSTEMS; MULTIPROCESSOR JOB SCHEDULING; ORIGINAL EQUIPMENT MANUFACTURERS; POWER SUPPLY; PRODUCTION SCHEDULING; QUEUE LENGTHS; REAL-WORLD APPLICATION; SCHEDULING POLICIES; SIMULATION MODEL; WAITING-TIME;

EID: 68649105012     PISSN: 03608352     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.cie.2008.09.011     Document Type: Article
Times cited : (5)

References (20)
  • 4
    • 0033079757 scopus 로고    scopus 로고
    • General multiprocessor task scheduling
    • Chen J., and Lee C.Y. General multiprocessor task scheduling. Naval Research Logistics 46 (1999) 57-74
    • (1999) Naval Research Logistics , vol.46 , pp. 57-74
    • Chen, J.1    Lee, C.Y.2
  • 7
    • 17444376768 scopus 로고    scopus 로고
    • The berth allocation problem: Models and solution methods
    • Guan Y., and Cheung R.K. The berth allocation problem: Models and solution methods. OR Spectrum 26 (2004) 75-92
    • (2004) OR Spectrum , vol.26 , pp. 75-92
    • Guan, Y.1    Cheung, R.K.2
  • 8
    • 0036794414 scopus 로고    scopus 로고
    • A multiprocessor task scheduling model for berth allocation: Heuristic and worst-case analysis
    • Guan Y., Xiao W.Q., Cheung R.K., and Li C.L. A multiprocessor task scheduling model for berth allocation: Heuristic and worst-case analysis. Operations Research Letters 30 (2002) 343-350
    • (2002) Operations Research Letters , vol.30 , pp. 343-350
    • Guan, Y.1    Xiao, W.Q.2    Cheung, R.K.3    Li, C.L.4
  • 9
    • 33751077314 scopus 로고    scopus 로고
    • A simple linear time approximation for multi-processor job scheduling on four processors
    • Huang J., Chen J., Chen S., and Wang J. A simple linear time approximation for multi-processor job scheduling on four processors. Journal of Combinatorial Optimization 13 (2007) 33-45
    • (2007) Journal of Combinatorial Optimization , vol.13 , pp. 33-45
    • Huang, J.1    Chen, J.2    Chen, S.3    Wang, J.4
  • 10
    • 0037232754 scopus 로고    scopus 로고
    • Polynomial time approximation schemes for general multiprocessor job shop scheduling
    • Jansen K., and Porkolab L. Polynomial time approximation schemes for general multiprocessor job shop scheduling. Journal of Algorithms 45 (2002) 167-191
    • (2002) Journal of Algorithms , vol.45 , pp. 167-191
    • Jansen, K.1    Porkolab, L.2
  • 11
  • 12
    • 0032672426 scopus 로고    scopus 로고
    • Scheduling one and two-processor tasks on two parallel processors
    • Lee C.Y., and Cai X. Scheduling one and two-processor tasks on two parallel processors. IIE Transactions 31 (1999) 445-455
    • (1999) IIE Transactions , vol.31 , pp. 445-455
    • Lee, C.Y.1    Cai, X.2
  • 13
    • 0036587860 scopus 로고    scopus 로고
    • A discrete-continuous combined modeling approach for supply chain simulation
    • Lee Y.H., Cho M.K., and Kim Y.B. A discrete-continuous combined modeling approach for supply chain simulation. Simulation 78 5 (2002) 321-329
    • (2002) Simulation , vol.78 , Issue.5 , pp. 321-329
    • Lee, Y.H.1    Cho, M.K.2    Kim, Y.B.3
  • 18
    • 0142030413 scopus 로고    scopus 로고
    • Simulation and analysis for the Kelang container terminal operations
    • Tahar R.M., and Hussian K. Simulation and analysis for the Kelang container terminal operations. Logistic Information Management 13 1 (2000) 14-20
    • (2000) Logistic Information Management , vol.13 , Issue.1 , pp. 14-20
    • Tahar, R.M.1    Hussian, K.2
  • 19
    • 0024731596 scopus 로고
    • An application of discrete-event simulation to on-line control and scheduling in flexible manufacturing
    • Wu S.D., and Wysk R.A. An application of discrete-event simulation to on-line control and scheduling in flexible manufacturing. International Journal of Production Research 27 (1989) 1603-1623
    • (1989) International Journal of Production Research , vol.27 , pp. 1603-1623
    • Wu, S.D.1    Wysk, R.A.2
  • 20
    • 33745125063 scopus 로고    scopus 로고
    • Multiprocessor task scheduling in multistage hybrid flow-shops: An ant colony system approach
    • Ying K.C., and Lin S.W. Multiprocessor task scheduling in multistage hybrid flow-shops: An ant colony system approach. International Journal of Production Research 44 16 (2006) 3161-3177
    • (2006) International Journal of Production Research , vol.44 , Issue.16 , pp. 3161-3177
    • Ying, K.C.1    Lin, S.W.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.