-
1
-
-
0040213294
-
Workforce-constrained preventive maintenance scheduling using evolution strategies
-
Ahire, S., et al., 2000. Workforce-constrained preventive maintenance scheduling using evolution strategies. Decision Science Journal, 31 (4), 833-859.
-
(2000)
Decision Science Journal
, vol.31
, Issue.4
, pp. 833-859
-
-
Ahire, S.1
-
2
-
-
33746215640
-
On solving edge detection by emergence
-
DOI 10.1007/11779568-86, Advances in Applied Artificial Intelligence - 19th International Conference on Industrial, Engineering and Other Applications of Applied Intelligent Systems, IEA/AIE 2006, Proceedings
-
Batouche, M., Meshoul, S., and Abbassene, A., 2006. On solving edge detection by emergence. Lecture Notes in Computer Science, 4031, 800-808. (Pubitemid 44089730)
-
(2006)
Lecture Notes in Computer Science (including subseries Lecture Notes in Artificial Intelligence and Lecture Notes in Bioinformatics)
, vol.LNAI
, pp. 800-808
-
-
Batouche, M.1
Meshoul, S.2
Abbassene, A.3
-
4
-
-
0031152504
-
Maximizing the effectiveness of a preventive maintenance system: An adaptive modeling approach
-
Gopalakrishnan, M., Ahire, S.L., and Miller, D.M., 1997. Maximizing the Effectiveness of a preventive maintetance system: an adaptive modelling approach. Management Science, 43 (6), 827-840. (Pubitemid 127579715)
-
(1997)
Management Science
, vol.43
, Issue.6
, pp. 827-840
-
-
Gopalakrishnan, M.1
Ahire, S.L.2
Miller, D.M.3
-
5
-
-
0032187645
-
Scheduling of railway track maintenance activities and crews
-
Higgins, A., 1998. Scheduling of railway track maintenance activities and crews. Journal of the Operational Research Society, 49, 1026-1033. (Pubitemid 128592216)
-
(1998)
Journal of the Operational Research Society
, vol.49
, Issue.10
, pp. 1026-1033
-
-
Higgins, A.1
-
6
-
-
66149094973
-
Proactive, dynamic and multi-criteria scheduling of maintenance activities
-
Marmier, F., Varnier, C., and Zerhouni, N., 2009. Proactive, dynamic and multi-criteria scheduling of maintenance activities. International Journal of Production Research, 47 (8), 2185-2201.
-
(2009)
International Journal of Production Research
, vol.47
, Issue.8
, pp. 2185-2201
-
-
Marmier, F.1
Varnier, C.2
Zerhouni, N.3
-
8
-
-
0036381237
-
An analysis of personnel capacity requirement in the maintenance department by using a simulation method
-
Mjema, E., 2002. An analysis of personnel capacity requirement in the maintenance department by using a simulation method. Journal of Quality Maintenance Engineering, 8 (3), 253-273.
-
(2002)
Journal of Quality Maintenance Engineering
, vol.8
, Issue.3
, pp. 253-273
-
-
Mjema, E.1
-
9
-
-
33746255940
-
An intelligent maintenance system for continuous cost-based prioritisation of maintenance activities
-
DOI 10.1016/j.compind.2006.02.008, PII S0166361506000558
-
Moore, W.J. and Starr, A.G., 2006. An intelligent maintenance system for continuous cost-based prioritization of maintenance activities. Computers in Industry, 57 (6), 595-606. (Pubitemid 44093749)
-
(2006)
Computers in Industry
, vol.57
, Issue.6
, pp. 595-606
-
-
Moore, W.J.1
Starr, A.G.2
-
10
-
-
70349130253
-
Parallel simulated annealing for solving the room assignment problem on shared and distributed memory platforms
-
for PhD Students in Computing, Gabrovo, Bulgaria, 2008
-
Lazarova, M., 2008. Parallel simulated annealing for solving the room assignment problem on shared and distributed memory platforms, ACM International Conference Proceeding Series Vol. 374(2), Proceedings of the 9th International Conference on Computer Systems and Technologies and Workshop for PhD Students in Computing, Gabrovo, Bulgaria, 2008, 1-6.
-
(2008)
ACM International Conference Proceeding Series Vol. 374(2), Proceedings of the 9th International Conference on Computer Systems and Technologies and Workshop
, pp. 1-6
-
-
Lazarova, M.1
-
11
-
-
33750731956
-
Searching for multiobjective preventive maintenance schedules: Combining preferences with evolutionary algorithms
-
DOI 10.1016/j.ejor.2005.12.015, PII S0377221705008477
-
Quan, G., et al., 2007. Searching for multiobjective preventive maintenance schedules: combining preferences with evolutionary algorithms. European Journal of Operational Research, 177 (3), 1969-1984. (Pubitemid 44709462)
-
(2007)
European Journal of Operational Research
, vol.177
, Issue.3
, pp. 1969-1984
-
-
Quan, G.1
Greenwood, G.W.2
Liu, D.3
Hu, S.4
-
12
-
-
0041671072
-
Reactive scheduling of complex system maintenance in a cooperative environment with communication times
-
Quéré, Y.L., et al., 2003. Reactive scheduling of complex system maintenance in a cooperative environment with communication times. IEEE Transactions on Systems, Man, and Cybernetics-Part C: Applications and Reviews, 33 (2), 225-234.
-
(2003)
IEEE Transactions on Systems, Man, and Cybernetics-Part C: Applications and Reviews
, vol.33
, Issue.2
, pp. 225-234
-
-
Quéré, Y.L.1
-
13
-
-
0030587314
-
Parallel simulated annealing algorithms
-
DOI 10.1006/jpdc.1996.0121
-
Ram, D.J., Sreenivas, T.H., and Subramanian, K.G., 1996. Parallel simulated annealing algorithms. Journal of Parallel and Distributed Computing, 37 (2), 207-212. (Pubitemid 126163242)
-
(1996)
Journal of Parallel and Distributed Computing
, vol.37
, Issue.2
, pp. 207-212
-
-
Janaki Ram, D.1
Sreenivas, T.H.2
Ganapathy Subramaniam, K.3
-
14
-
-
0020722266
-
Scheduling of plant maintenance personnel
-
Roberts, S.M. and Escudero, L.F., 1983. Scheduling of plant maintenance personnel. Journal of Optimization Theory and Applications, 39 (3), 323-343.
-
(1983)
Journal of Optimization Theory and Applications
, vol.39
, Issue.3
, pp. 323-343
-
-
Roberts, S.M.1
Escudero, L.F.2
-
15
-
-
79954481011
-
Multi-objective simulated annealing for a maintenance workforce scheduling problem: A case study
-
Cher Ming Tan, ed Vienna, Austria: ARS Publishing
-
Safaei, N., Banjevic, D., and Jardine, A.K.S., 2008. Multi-objective simulated annealing for a maintenance workforce scheduling problem: a case study. In: Cher Ming Tan, ed. Global optimization: focus on simulated annealing. Vienna, Austria: ARS Publishing, 27-48.
-
(2008)
Global Optimization: Focus on Simulated Annealing
, pp. 27-48
-
-
Safaei, N.1
Banjevic, D.2
Jardine, A.K.S.3
-
16
-
-
79954523712
-
Workforce-constrained maintenance scheduling: A case study
-
Safaei, N., Banjevic D., and Jardine, A.K.S., 2011. Workforce-constrained maintenance scheduling: a case study. Journal of Operational Research Society, 62, 1005-1018.
-
(2011)
Journal of Operational Research Society
, vol.62
, pp. 1005-1018
-
-
Safaei, N.1
Banjevic, D.2
Jardine, A.K.S.3
-
17
-
-
0029386329
-
Parallel N-ary speculative computation of simulated annealing
-
Sohn, A., 1995. Parallel N-ary speculative computation of simulated annealing. IEEE Transactions on Parellel and Distributed Systems, 6 (10), 997-1005.
-
(1995)
IEEE Transactions on Parellel and Distributed Systems
, vol.6
, Issue.10
, pp. 997-1005
-
-
Sohn, A.1
-
18
-
-
57049179673
-
Parallel approaches for multiobjective optimization
-
Talbi, E.G., et al., 2008. Parallel approaches for multiobjective optimization. Lecture Notes in Computer Science, 5252, 349-372.
-
(2008)
Lecture Notes in Computer Science
, vol.5252
, pp. 349-372
-
-
Talbi, E.G.1
-
19
-
-
27144523722
-
Solving a dynamic cell formation problem using metaheuristics
-
DOI 10.1016/j.amc.2004.12.021, PII S0096300305000238
-
Tavakkoli-Moghaddam, R., et al., 2005. Solving a dynamic cell formation problem using metaheuristics. Applied Mathematics and Computation, 170 (2), 761-780. (Pubitemid 41497794)
-
(2005)
Applied Mathematics and Computation
, vol.170
, Issue.2
, pp. 761-780
-
-
Tavakkoli-Moghaddam, R.1
Aryanezhad, M.B.2
Safaei, N.3
Azaron, A.4
-
20
-
-
0042679956
-
Scheduling maintenance and determining crew size for stochastically failing equipment
-
Vergin, R.C., 1966. Scheduling maintenance and determining crew size for stochastically failing equipment. Management Science, 13 (2), 52-65.
-
(1966)
Management Science
, vol.13
, Issue.2
, pp. 52-65
-
-
Vergin, R.C.1
-
21
-
-
0342461928
-
Preventive maintenance scheduling by mathematical programming
-
Wagner, H.M, Giglio, R.J., and Glaser, R.G., 1964. Preventive maintenance scheduling by mathematical programming. Management Science, 10 (2), 316-334.
-
(1964)
Management Science
, vol.10
, Issue.2
, pp. 316-334
-
-
Wagner, H.M.1
Giglio, R.J.2
Glaser, R.G.3
-
22
-
-
0033332050
-
Multithreaded architecture approach to parallel DSPs for high performance image processing applications
-
Wittenburg, J.P., Pirsch, P., and Meyer, G, 1999, A multithreaded architecture approach to parallel DSPs for high performance image processing applications, IEEE Workshop on Signal Processing Systems (SiPS 99), 20-22 Oct, 241-250. (Pubitemid 30572049)
-
(1999)
IEEE Workshop on Signal Processing Systems, SiPS: Design and Implementation
, pp. 241-250
-
-
Wittenburg Jens Peter1
Pirsch Peter2
Meyer Gerald3
-
23
-
-
4043115347
-
Application of dynamic scheduling rules in maintenance planning and scheduling
-
Worrall, B. M. and Mert, B., 1980. Application of dynamic scheduling rules in maintenance planning and scheduling. International Journal of Production Research, 18 (1), 57-71.
-
(1980)
International Journal of Production Research
, vol.18
, Issue.1
, pp. 57-71
-
-
Worrall, B.M.1
Mert, B.2
-
24
-
-
0038265271
-
An airline maintenance manpower planning model with flexible strategies
-
DOI 10.1016/S0969-6997(03)00013-9
-
Yanga, T-H., Yanb, S., and Chen, H-H., 2003. An airline maintenance manpower planning model with flexible strategies. Journal of Air Transport Management, 9, 233-239. (Pubitemid 36837707)
-
(2003)
Journal of Air Transport Management
, vol.9
, Issue.4
, pp. 233-239
-
-
Yang, T.-H.1
Yan, S.2
Chen, H.-H.3
|