-
1
-
-
0040213294
-
Workforce-constrained preventive maintenance scheduling using evolution strategies
-
Ahire S, Greenwood G, Gupta A and Terwilliger M (2000). Workforce-constrained preventive maintenance scheduling using evolution strategies. Decision Sci J 31:833-859.
-
(2000)
Decision Sci. J.
, vol.31
, pp. 833-859
-
-
Ahire, S.1
Greenwood, G.2
Gupta, A.3
Terwilliger, M.4
-
2
-
-
41149106315
-
Preventive maintenance scheduling of multi-cogeneration plants using integer programming
-
DOI 10.1057/palgrave.jors.2602386, PII 2602386
-
Alardhi M and Labib AW (2008). Preventive maintetance scheduling of multi-cogeneration plants using integer programming. J Opl Res Soc 59:503-509. (Pubitemid 351438521)
-
(2008)
Journal of the Operational Research Society
, vol.59
, Issue.4
, pp. 503-509
-
-
Alardhi, M.1
Labib, A.W.2
-
3
-
-
54049149435
-
An exact 6-constraint method for bi-objective combinatorial optimization problems: Application to the Traveling Salesman Problem with Profits
-
Bérubé J-F, Gendreau M and Potvin J-Y (2009). An exact 6-constraint method for bi-objective combinatorial optimization problems: Application to the Traveling Salesman Problem with Profits. Eur J Opl Res 194:39-50.
-
(2009)
Eur. J. Opl. Res.
, vol.194
, pp. 39-50
-
-
Bérubé, J.-F.1
Gendreau, M.2
Potvin, J.-Y.3
-
4
-
-
21844488838
-
Planning the size and organization of KLM's aircraft maintenance personnel
-
Dijkstra MC, Kroon LG, Salomon M, Van Nunen J and Van Wassenhove LN (1994). Planning the size and organization of KLM's aircraft maintenance personnel. Interfaces 24(6):47-58.
-
(1994)
Interfaces
, vol.24
, Issue.6
, pp. 47-58
-
-
Dijkstra, M.C.1
Kroon, L.G.2
Salomon, M.3
Van Nunen, J.4
Van Wassenhove, L.N.5
-
5
-
-
24344434513
-
Multiobjective combinatorial optimization-theory, methodology, and applications
-
Ehrgott M and Gandibleux X eds, Kluwer Academic Publishers: Dordrecht
-
Ehrgott M and Gandibleux X (2002). Multiobjective combinatorial optimization-theory, methodology, and applications. In: Ehrgott M and Gandibleux X (eds). Multiple Criteria Optimization: State of the Art Annotated Bibliographic Surveys. Kluwer Academic Publishers: Dordrecht, pp 369-444.
-
(2002)
Multiple Criteria Optimization: State of the Art Annotated Bibliographic Surveys
, pp. 369-444
-
-
Ehrgott, M.1
Gandibleux, X.2
-
6
-
-
0031152504
-
Maximizing the effectiveness of a preventive maintenance system: An adaptive modeling approach
-
Gopalakrishnan M, Ahire SL and Miller DM (1997). Maximizing the effectiveness of a preventive maintenance system: An adaptive modelling approach. Mngt Sci 43:827-840. (Pubitemid 127579715)
-
(1997)
Management Science
, vol.43
, Issue.6
, pp. 827-840
-
-
Gopalakrishnan, M.1
Ahire, S.L.2
Miller, D.M.3
-
7
-
-
0032187645
-
Scheduling of railway track maintenance activities and crews
-
Higgins A (1998). Scheduling of railway track maintenance activities and crews. J Opl Res Soc 49:1026-1033. (Pubitemid 128592216)
-
(1998)
Journal of the Operational Research Society
, vol.49
, Issue.10
, pp. 1026-1033
-
-
Higgins, A.1
-
8
-
-
79954531387
-
-
LINDO Systems Inc, LINDO Systems Inc.: Chicago, US
-
LINDO Systems Inc. (2008). Extended Lingo: Version 10.0+ Users Guide. LINDO Systems Inc.: Chicago, US.
-
(2008)
Extended Lingo: Version 10.0+ Users Guide
-
-
-
9
-
-
0000700371
-
Maintenance policies for stochastically failing equipment: A survey
-
McCall J (1965). Maintenance policies for stochastically failing equipment: A survey. Mngt Sci 11:493-524.
-
(1965)
Mngt Sci.
, vol.11
, pp. 493-524
-
-
McCall, J.1
-
11
-
-
33746255940
-
An intelligent maintenance system for continuous cost-based prioritisation of maintenance activities
-
DOI 10.1016/j.compind.2006.02.008, PII S0166361506000558
-
Moore WJ and Starr AG (2006). An intelligent maintenance system for continuous cost-based prioritization of maintenance activities. Comput Ind 57:595-606. (Pubitemid 44093749)
-
(2006)
Computers in Industry
, vol.57
, Issue.6
, pp. 595-606
-
-
Moore, W.J.1
Starr, A.G.2
-
13
-
-
33749320228
-
Two-phase method and Lagrangian relaxation to solve the Bi-objective set covering problem
-
DOI 10.1007/s10479-006-0060-5
-
Prins C, Prodhon C and Calvo RW (2006). Two-phase method and Lagrangian relaxation to solve the bi-objective set covering problem. Ann Opns Res 147:23-41. (Pubitemid 44496799)
-
(2006)
Annals of Operations Research
, vol.147
, Issue.1
, pp. 23-41
-
-
Prins, C.1
Prodhon, C.2
Calvo, R.W.3
-
14
-
-
34648839878
-
Two phase algorithms for the bi-objective assignment problem
-
DOI 10.1016/j.ejor.2006.12.054, PII S0377221707000781
-
Przybylski A, Gandibleux X and Ehrgott M (2008). Two phase algorithms for the bi-objective assignment problem. Eur J Opl Res 185:509-533. (Pubitemid 47454672)
-
(2008)
European Journal of Operational Research
, vol.185
, Issue.2
, pp. 509-533
-
-
Przybylski, A.1
Gandibleux, X.2
Ehrgott, M.3
-
15
-
-
33750731956
-
Searching for multiobjective preventive maintenance schedules: Combining preferences with evolutionary algorithms
-
DOI 10.1016/j.ejor.2005.12.015, PII S0377221705008477
-
Quan G, Greenwood GW, Liu D and Hu S (2007). Searching for multiobjective preventive maintenance schedules: Combining preferences with evolutionary algorithms. Eur J Opl Res 177:1969-1984. (Pubitemid 44709462)
-
(2007)
European Journal of Operational Research
, vol.177
, Issue.3
, pp. 1969-1984
-
-
Quan, G.1
Greenwood, G.W.2
Liu, D.3
Hu, S.4
-
16
-
-
70449686055
-
Corrective maintenance through dynamic work allocation and pre-emption: Case study and application
-
Quintanaa R, Leunga MT, Villalobosb JR and Graul M (2009). Corrective maintenance through dynamic work allocation and pre-emption: Case study and application. Int J Prod Res 47:3539-3557.
-
(2009)
Int. J. Prod. Res.
, vol.47
, pp. 3539-3557
-
-
Quintanaa, R.1
Leunga, M.T.2
Villalobosb, J.R.3
Graul, M.4
-
18
-
-
79954481011
-
Multi-objective simulated annealing for a maintenance workforce scheduling problem: A case study
-
Cher Ming Tan ed, ARS Publishing: Vienna: Austria
-
Safaei N, Banjevic D and Jardine AKS (2008). Multi-objective simulated annealing for a maintenance workforce scheduling problem: A case study. In: Cher Ming Tan (ed). Global optimization: Focus on Simulated Annealing. ARS Publishing: Vienna: Austria, pp 27-48.
-
(2008)
Global Optimization: Focus on Simulated Annealing
, pp. 27-48
-
-
Safaei, N.1
Banjevic, D.2
Jardine, A.K.S.3
-
19
-
-
52049091896
-
A memetic algorithm for the flexible flow line scheduling problem with processor blocking
-
Tavakkoli-Moghaddam R, Safaei N and Sassani F (2008). A memetic algorithm for the flexible flow line scheduling problem with processor blocking. Comput Opns Res 36:402-414.
-
(2008)
Comput. Opns Res.
, vol.36
, pp. 402-414
-
-
Tavakkoli-Moghaddam, R.1
Safaei, N.2
Sassani, F.3
-
20
-
-
0042679956
-
Scheduling maintenance and determining crew size for stochastically failing equipment
-
Vergin RC (1966). Scheduling maintenance and determining crew size for stochastically failing equipment. Mngt Sci 13:52-65.
-
(1966)
Mngt Sci.
, vol.13
, pp. 52-65
-
-
Vergin, R.C.1
-
21
-
-
0342461928
-
Preventive maintenance scheduling by mathematical programming
-
Wagner HM, Giglio RJ and Glaser RG (1964). Preventive maintenance scheduling by mathematical programming. Mngt Sci 10:316-334.
-
(1964)
Mngt Sci.
, vol.10
, pp. 316-334
-
-
Wagner, H.M.1
Giglio, R.J.2
Glaser, R.G.3
-
22
-
-
4043115347
-
Application of dynamic scheduling rules in maintenance planning and scheduling
-
Worrall BM and Mert B (1980). Application of dynamic scheduling rules in maintenance planning and scheduling. Int J Prod Res 18:57-71.
-
(1980)
Int. J. Prod. Res.
, vol.18
, pp. 57-71
-
-
Worrall, B.M.1
Mert, B.2
-
23
-
-
0038265271
-
An airline maintenance manpower planning model with flexible strategies
-
DOI 10.1016/S0969-6997(03)00013-9
-
Yanga T-H, Yanb S and Chen H-H (2003). An airline maintenance manpower planning model with flexible strategies. J Air Transport Mngt 9:233-239. (Pubitemid 36837707)
-
(2003)
Journal of Air Transport Management
, vol.9
, Issue.4
, pp. 233-239
-
-
Yang, T.-H.1
Yan, S.2
Chen, H.-H.3
|