메뉴 건너뛰기




Volumn 62, Issue 6, 2011, Pages 1005-1018

Bi-objective workforce-constrained maintenance scheduling: A case study

Author keywords

bi objective optimization; mixed integer programming; Workforce constrained maintenance scheduling

Indexed keywords

CONSTRAINED OPTIMIZATION; INTEGER PROGRAMMING; NUMERICAL METHODS; PERSONNEL; REPAIR; SCHEDULING; SENSITIVITY ANALYSIS;

EID: 79954523712     PISSN: 01605682     EISSN: 14769360     Source Type: Journal    
DOI: 10.1057/jors.2010.51     Document Type: Article
Times cited : (26)

References (23)
  • 1
    • 0040213294 scopus 로고    scopus 로고
    • Workforce-constrained preventive maintenance scheduling using evolution strategies
    • Ahire S, Greenwood G, Gupta A and Terwilliger M (2000). Workforce-constrained preventive maintenance scheduling using evolution strategies. Decision Sci J 31:833-859.
    • (2000) Decision Sci. J. , vol.31 , pp. 833-859
    • Ahire, S.1    Greenwood, G.2    Gupta, A.3    Terwilliger, M.4
  • 2
    • 41149106315 scopus 로고    scopus 로고
    • Preventive maintenance scheduling of multi-cogeneration plants using integer programming
    • DOI 10.1057/palgrave.jors.2602386, PII 2602386
    • Alardhi M and Labib AW (2008). Preventive maintetance scheduling of multi-cogeneration plants using integer programming. J Opl Res Soc 59:503-509. (Pubitemid 351438521)
    • (2008) Journal of the Operational Research Society , vol.59 , Issue.4 , pp. 503-509
    • Alardhi, M.1    Labib, A.W.2
  • 3
    • 54049149435 scopus 로고    scopus 로고
    • An exact 6-constraint method for bi-objective combinatorial optimization problems: Application to the Traveling Salesman Problem with Profits
    • Bérubé J-F, Gendreau M and Potvin J-Y (2009). An exact 6-constraint method for bi-objective combinatorial optimization problems: Application to the Traveling Salesman Problem with Profits. Eur J Opl Res 194:39-50.
    • (2009) Eur. J. Opl. Res. , vol.194 , pp. 39-50
    • Bérubé, J.-F.1    Gendreau, M.2    Potvin, J.-Y.3
  • 5
    • 24344434513 scopus 로고    scopus 로고
    • Multiobjective combinatorial optimization-theory, methodology, and applications
    • Ehrgott M and Gandibleux X eds, Kluwer Academic Publishers: Dordrecht
    • Ehrgott M and Gandibleux X (2002). Multiobjective combinatorial optimization-theory, methodology, and applications. In: Ehrgott M and Gandibleux X (eds). Multiple Criteria Optimization: State of the Art Annotated Bibliographic Surveys. Kluwer Academic Publishers: Dordrecht, pp 369-444.
    • (2002) Multiple Criteria Optimization: State of the Art Annotated Bibliographic Surveys , pp. 369-444
    • Ehrgott, M.1    Gandibleux, X.2
  • 6
    • 0031152504 scopus 로고    scopus 로고
    • Maximizing the effectiveness of a preventive maintenance system: An adaptive modeling approach
    • Gopalakrishnan M, Ahire SL and Miller DM (1997). Maximizing the effectiveness of a preventive maintenance system: An adaptive modelling approach. Mngt Sci 43:827-840. (Pubitemid 127579715)
    • (1997) Management Science , vol.43 , Issue.6 , pp. 827-840
    • Gopalakrishnan, M.1    Ahire, S.L.2    Miller, D.M.3
  • 7
    • 0032187645 scopus 로고    scopus 로고
    • Scheduling of railway track maintenance activities and crews
    • Higgins A (1998). Scheduling of railway track maintenance activities and crews. J Opl Res Soc 49:1026-1033. (Pubitemid 128592216)
    • (1998) Journal of the Operational Research Society , vol.49 , Issue.10 , pp. 1026-1033
    • Higgins, A.1
  • 8
    • 79954531387 scopus 로고    scopus 로고
    • LINDO Systems Inc, LINDO Systems Inc.: Chicago, US
    • LINDO Systems Inc. (2008). Extended Lingo: Version 10.0+ Users Guide. LINDO Systems Inc.: Chicago, US.
    • (2008) Extended Lingo: Version 10.0+ Users Guide
  • 9
    • 0000700371 scopus 로고
    • Maintenance policies for stochastically failing equipment: A survey
    • McCall J (1965). Maintenance policies for stochastically failing equipment: A survey. Mngt Sci 11:493-524.
    • (1965) Mngt Sci. , vol.11 , pp. 493-524
    • McCall, J.1
  • 11
    • 33746255940 scopus 로고    scopus 로고
    • An intelligent maintenance system for continuous cost-based prioritisation of maintenance activities
    • DOI 10.1016/j.compind.2006.02.008, PII S0166361506000558
    • Moore WJ and Starr AG (2006). An intelligent maintenance system for continuous cost-based prioritization of maintenance activities. Comput Ind 57:595-606. (Pubitemid 44093749)
    • (2006) Computers in Industry , vol.57 , Issue.6 , pp. 595-606
    • Moore, W.J.1    Starr, A.G.2
  • 12
  • 13
    • 33749320228 scopus 로고    scopus 로고
    • Two-phase method and Lagrangian relaxation to solve the Bi-objective set covering problem
    • DOI 10.1007/s10479-006-0060-5
    • Prins C, Prodhon C and Calvo RW (2006). Two-phase method and Lagrangian relaxation to solve the bi-objective set covering problem. Ann Opns Res 147:23-41. (Pubitemid 44496799)
    • (2006) Annals of Operations Research , vol.147 , Issue.1 , pp. 23-41
    • Prins, C.1    Prodhon, C.2    Calvo, R.W.3
  • 14
    • 34648839878 scopus 로고    scopus 로고
    • Two phase algorithms for the bi-objective assignment problem
    • DOI 10.1016/j.ejor.2006.12.054, PII S0377221707000781
    • Przybylski A, Gandibleux X and Ehrgott M (2008). Two phase algorithms for the bi-objective assignment problem. Eur J Opl Res 185:509-533. (Pubitemid 47454672)
    • (2008) European Journal of Operational Research , vol.185 , Issue.2 , pp. 509-533
    • Przybylski, A.1    Gandibleux, X.2    Ehrgott, M.3
  • 15
    • 33750731956 scopus 로고    scopus 로고
    • Searching for multiobjective preventive maintenance schedules: Combining preferences with evolutionary algorithms
    • DOI 10.1016/j.ejor.2005.12.015, PII S0377221705008477
    • Quan G, Greenwood GW, Liu D and Hu S (2007). Searching for multiobjective preventive maintenance schedules: Combining preferences with evolutionary algorithms. Eur J Opl Res 177:1969-1984. (Pubitemid 44709462)
    • (2007) European Journal of Operational Research , vol.177 , Issue.3 , pp. 1969-1984
    • Quan, G.1    Greenwood, G.W.2    Liu, D.3    Hu, S.4
  • 16
    • 70449686055 scopus 로고    scopus 로고
    • Corrective maintenance through dynamic work allocation and pre-emption: Case study and application
    • Quintanaa R, Leunga MT, Villalobosb JR and Graul M (2009). Corrective maintenance through dynamic work allocation and pre-emption: Case study and application. Int J Prod Res 47:3539-3557.
    • (2009) Int. J. Prod. Res. , vol.47 , pp. 3539-3557
    • Quintanaa, R.1    Leunga, M.T.2    Villalobosb, J.R.3    Graul, M.4
  • 18
    • 79954481011 scopus 로고    scopus 로고
    • Multi-objective simulated annealing for a maintenance workforce scheduling problem: A case study
    • Cher Ming Tan ed, ARS Publishing: Vienna: Austria
    • Safaei N, Banjevic D and Jardine AKS (2008). Multi-objective simulated annealing for a maintenance workforce scheduling problem: A case study. In: Cher Ming Tan (ed). Global optimization: Focus on Simulated Annealing. ARS Publishing: Vienna: Austria, pp 27-48.
    • (2008) Global Optimization: Focus on Simulated Annealing , pp. 27-48
    • Safaei, N.1    Banjevic, D.2    Jardine, A.K.S.3
  • 19
    • 52049091896 scopus 로고    scopus 로고
    • A memetic algorithm for the flexible flow line scheduling problem with processor blocking
    • Tavakkoli-Moghaddam R, Safaei N and Sassani F (2008). A memetic algorithm for the flexible flow line scheduling problem with processor blocking. Comput Opns Res 36:402-414.
    • (2008) Comput. Opns Res. , vol.36 , pp. 402-414
    • Tavakkoli-Moghaddam, R.1    Safaei, N.2    Sassani, F.3
  • 20
    • 0042679956 scopus 로고
    • Scheduling maintenance and determining crew size for stochastically failing equipment
    • Vergin RC (1966). Scheduling maintenance and determining crew size for stochastically failing equipment. Mngt Sci 13:52-65.
    • (1966) Mngt Sci. , vol.13 , pp. 52-65
    • Vergin, R.C.1
  • 21
    • 0342461928 scopus 로고
    • Preventive maintenance scheduling by mathematical programming
    • Wagner HM, Giglio RJ and Glaser RG (1964). Preventive maintenance scheduling by mathematical programming. Mngt Sci 10:316-334.
    • (1964) Mngt Sci. , vol.10 , pp. 316-334
    • Wagner, H.M.1    Giglio, R.J.2    Glaser, R.G.3
  • 22
    • 4043115347 scopus 로고
    • Application of dynamic scheduling rules in maintenance planning and scheduling
    • Worrall BM and Mert B (1980). Application of dynamic scheduling rules in maintenance planning and scheduling. Int J Prod Res 18:57-71.
    • (1980) Int. J. Prod. Res. , vol.18 , pp. 57-71
    • Worrall, B.M.1    Mert, B.2
  • 23
    • 0038265271 scopus 로고    scopus 로고
    • An airline maintenance manpower planning model with flexible strategies
    • DOI 10.1016/S0969-6997(03)00013-9
    • Yanga T-H, Yanb S and Chen H-H (2003). An airline maintenance manpower planning model with flexible strategies. J Air Transport Mngt 9:233-239. (Pubitemid 36837707)
    • (2003) Journal of Air Transport Management , vol.9 , Issue.4 , pp. 233-239
    • Yang, T.-H.1    Yan, S.2    Chen, H.-H.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.