Efficient estimation of arc criticalities in stochastic activity networks
-
R.A. Bowman Efficient estimation of arc criticalities in stochastic activity networks Management Science 41 1995 58 67
-
(1995)
Management Science
, vol.41
, pp. 58-67
-
-
Bowman, R.A.1
-
3
-
-
0036466460
-
The computational complexity of the criticality problems in a network with interval activity times
-
DOI 10.1016/S0377-2217(01)00048-0, PII S0377221701000480
-
S. Chanas, and P. Zieliński The computational complexity of the criticality problems in a network with interval activity times Production, Manufacturing and Logistics 136 2002 541 550 (Pubitemid 33094120)
-
(2002)
European Journal of Operational Research
, vol.136
, Issue.3
, pp. 541-550
-
-
Chanas, S.1
Zielinski, P.2
-
4
-
-
34249099938
-
Analysis of critical paths in a project network with fuzzy activity times
-
S.P. Chen Analysis of critical paths in a project network with fuzzy activity times European Journal of Operational Research 183 2007 442 459
-
(2007)
European Journal of Operational Research
, vol.183
, pp. 442-459
-
-
Chen, S.P.1
-
5
-
-
34047265638
-
Applying fuzzy method for measuring criticality in project network
-
T.C. Chen, and S.F. Huang Applying fuzzy method for measuring criticality in project network Information Sciences 177 2007 2448 2458
-
(2007)
Information Sciences
, vol.177
, pp. 2448-2458
-
-
Chen, T.C.1
Huang, S.F.2
-
6
-
-
0031257870
-
An uncertainty importance measure of activities in PERT networks
-
J.G. Cho, and B.J. Yum An uncertainty importance measure of activities in PERT networks International Journal of Project Management 35 1997 2737 2770
-
(1997)
International Journal of Project Management
, vol.35
, pp. 2737-2770
-
-
Cho, J.G.1
Yum, B.J.2
-
8
-
-
0022012461
-
Approximating the criticality indices of the activities in PERT networks
-
B.M. Dodin, and S.E. Elmaghraby Approximating the criticality indices of the activities in PERT networks Management Science 31 1985 207 223
-
(1985)
Management Science
, vol.31
, pp. 207-223
-
-
Dodin, B.M.1
Elmaghraby, S.E.2
-
11
-
-
0037125664
-
Path critical index and activity critical index in PERT networks
-
DOI 10.1016/S0377-2217(01)00268-5, PII S0377221701002685
-
S.M.T. Fatemi Ghomi, and E. Teimouri Path critical index and activity critical index in PERT networks European Journal of Operational Research 141 2002 147 152 (Pubitemid 34545623)
-
(2002)
European Journal of Operational Research
, vol.141
, Issue.1
, pp. 147-152
-
-
Fatemi Ghomi, S.M.T.1
Teimouri, E.2
-
12
-
-
0034313858
-
Analysis of the effects of uncertainty, risk-pooling, and subcontracting mechanisms on project performance
-
G. Gutierrez, and A. Paul Analysis of the effects of uncertainty, risk-pooling and subcontracting mechanisms on project performance Operations Research 48 2000 927 938 (Pubitemid 32189513)
-
(2000)
Operations Research
, vol.48
, Issue.6
, pp. 927-938
-
-
Gutierrez, G.1
Paul, A.2
-
13
-
-
55349133844
-
Fuzzy expert system for determining the criticality of activities in mega projects, hybrid intelligent systems
-
Jassbi, J.; Jafari, H.; Khanmohammadi, S.; 2008. Fuzzy expert system for determining the criticality of activities in mega projects, hybrid intelligent systems. In: Eighth International Conference on Hybrid Intelligent Systems, pp. 246-251.
-
(2008)
Eighth International Conference on Hybrid Intelligent Systems
, pp. 246-251
-
-
Jassbi, J.1
Jafari, H.2
Khanmohammadi, S.3
-
14
-
-
0034559432
-
Experimental evaluation of state-of-the-art heuristics for the resource constrained project scheduling problem
-
R. Kolisch, and S. Hartman Experimental evaluation of state-of-the-art heuristics for the resource constrained project scheduling problem European Journal of Operational Research 127 2000 394 407
-
(2000)
European Journal of Operational Research
, vol.127
, pp. 394-407
-
-
Kolisch, R.1
Hartman, S.2
-
15
-
-
0035399734
-
Use of fuzzy number in project risk (criticality) assessment
-
D. Kuchta Use of fuzzy number in project risk (criticality) assessment International Journal of Project Management 19 2002 305 310
-
(2002)
International Journal of Project Management
, vol.19
, pp. 305-310
-
-
Kuchta, D.1
-
16
-
-
0022785024
-
Markov and Markov regenerative pert networks
-
V.G. Kulkarni, and V.G. Adlakha Markov and Markov regenerative pert networks Operations Research 34 1986 769 781
-
(1986)
Operations Research
, vol.34
, pp. 769-781
-
-
Kulkarni, V.G.1
Adlakha, V.G.2
-
17
-
-
0037335622
-
Fuzzy critical path method based on signed-distance ranking and statistical confidence-interval estimates
-
F.T. Lin, and J.S. Yao Fuzzy critical path method based on signed-distance ranking and statistical confidence-interval estimates Journal of Supercomputing 24 2003 305 325
-
(2003)
Journal of Supercomputing
, vol.24
, pp. 305-325
-
-
Lin, F.T.1
Yao, J.S.2
-
18
-
-
0003107787
-
Distribution of the time through a directed, acyclic network
-
J.J. Martin Distribution of the time through a directed, acyclic network Operations Research 13 1965 46 66
-
(1965)
Operations Research
, vol.13
, pp. 46-66
-
-
Martin, J.J.1
-
20
-
-
59649105935
-
A multiple criteria decision model for assigning priorities to activities in project management
-
C.M.M. Mota, A.T. Almeida, and L.H. Alencar A multiple criteria decision model for assigning priorities to activities in project management International Journal of Project Management 27 2009 175 181
-
(2009)
International Journal of Project Management
, vol.27
, pp. 175-181
-
-
Mota, C.M.M.1
Almeida, A.T.2
Alencar, L.H.3
-
21
-
-
77955065221
-
-
Project Management Institute first ed. Project Management Institute
-
Project Management Institute, 2009. Practice Standard for Project Risk Management, first ed. Project Management Institute.
-
(2009)
Practice Standard for Project Risk Management
-
-
-
24
-
-
0038654496
-
Why projects are 'always' late: A rationale based on manual simulation of a PERT/CPM network
-
R.J. Schonberger Why projects are 'always' late: a rationale based on manual simulation of a PERT/CPM network Interfaces 11 1981 66 70
-
(1981)
Interfaces
, vol.11
, pp. 66-70
-
-
Schonberger, R.J.1
-
27
-
-
0000738834
-
Monte Carlo methods and the PERT problem
-
R.M. Van Slyke Monte Carlo methods and the PERT problem Operations Research 11 1963 839 860
-
(1963)
Operations Research
, vol.11
, pp. 839-860
-
-
Van Slyke, R.M.1
|