메뉴 건너뛰기




Volumn 63, Issue 1, 2012, Pages 1-12

Integrated pulp and paper mill planning and scheduling

Author keywords

Energy plant; MIP based heuristic; Production planning and scheduling; Pulp and paper mill

Indexed keywords

BLACK LIQUOR; COUNTER PRESSURE; CRITICAL PRODUCTION; CUSTOMER DEMANDS; DEMAND PATTERN; ELECTRICAL ENERGY; ENERGY PLANT; FEASIBLE SOLUTION; LOCAL SEARCH HEURISTICS; MATERIAL FLOW; MIP-BASED HEURISTIC; NEW MODEL; OPERATION COST; PAPER MACHINE; PAPER-TYPE; PLANNING AND SCHEDULING; PRODUCTION BOTTLENECKS; PRODUCTION PLANNING AND SCHEDULING; PULP AND PAPER MILL; REAL WORLD DATA; RECOVERY BOILERS; RECYCLED FIBERS; SEQUENCE DEPENDENT SETUPS; SIMPLE STOCHASTIC; VIRGIN FIBERS; WASTE STREAM; WOOD CHIP;

EID: 84857736148     PISSN: 03608352     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.cie.2012.01.008     Document Type: Article
Times cited : (63)

References (25)
  • 1
    • 34547356612 scopus 로고    scopus 로고
    • Mip-based heuristics for multi-item capacitated lot-sizing problem with setup times and shortage costs
    • N. Absi, and S. Kedad-Sidhoum Mip-based heuristics for multi-item capacitated lot-sizing problem with setup times and shortage costs RAIRO Operations Research 41 2 2007 171 192
    • (2007) RAIRO Operations Research , vol.41 , Issue.2 , pp. 171-192
    • Absi, N.1    Kedad-Sidhoum, S.2
  • 5
    • 33845515674 scopus 로고    scopus 로고
    • Increased capacity in kraft pulp mills: Lignin separation and reduced steam demand compared with recovery boiler upgrade
    • E. Axelsson, M.R. Olsson, and T. Berntsson Increased capacity in kraft pulp mills: Lignin separation and reduced steam demand compared with recovery boiler upgrade Nordic Pulp & Paper Research Journal 21 4 2006 485 492
    • (2006) Nordic Pulp & Paper Research Journal , vol.21 , Issue.4 , pp. 485-492
    • Axelsson, E.1    Olsson, M.R.2    Berntsson, T.3
  • 6
    • 79951846026 scopus 로고    scopus 로고
    • Editorial on lot sizing and scheduling: Industrial extensions and research opportunities
    • A. Clark, B. Almada-Lobo, and C. Almeder Editorial on lot sizing and scheduling: Industrial extensions and research opportunities International Journal of Production Research 49 9 2011 1 5
    • (2011) International Journal of Production Research , vol.49 , Issue.9 , pp. 1-5
    • Clark, A.1    Almada-Lobo, B.2    Almeder, C.3
  • 8
    • 58149250389 scopus 로고    scopus 로고
    • Solution approaches for the soft drink integrated production lot sizing and scheduling problem
    • D. Ferreira, R. Morabito, and S. Rangel Solution approaches for the soft drink integrated production lot sizing and scheduling problem European Journal of Operational Research 196 2009 697 706
    • (2009) European Journal of Operational Research , vol.196 , pp. 697-706
    • Ferreira, D.1    Morabito, R.2    Rangel, S.3
  • 9
    • 53549108021 scopus 로고    scopus 로고
    • Solving a multi-period supply chain problem for a pulp company using heuristics - An application to södra cell ab
    • H. Gunnarsson, and M. Rönnqvist Solving a multi-period supply chain problem for a pulp company using heuristics - An application to södra cell ab International Journal of Production Economics 116 1 2008 75 94
    • (2008) International Journal of Production Economics , vol.116 , Issue.1 , pp. 75-94
    • Gunnarsson, H.1    Rönnqvist, M.2
  • 10
    • 74149086575 scopus 로고    scopus 로고
    • A fix-and-optimize approach for the multi-level capacitated lot sizing problem
    • S. Helber, and F. Sahling A fix-and-optimize approach for the multi-level capacitated lot sizing problem International Journal of Production Economics 123 2 2010 247 256
    • (2010) International Journal of Production Economics , vol.123 , Issue.2 , pp. 247-256
    • Helber, S.1    Sahling, F.2
  • 11
    • 79955056703 scopus 로고    scopus 로고
    • Single and parallel machine capacitated lotsizing and scheduling: New iterative mip-based neighborhood search heuristics
    • R.J. James, and B. Almada-Lobo Single and parallel machine capacitated lotsizing and scheduling: New iterative mip-based neighborhood search heuristics Computers & Operations Research 38 12 2011 1816 1825
    • (2011) Computers & Operations Research , vol.38 , Issue.12 , pp. 1816-1825
    • James, R.J.1    Almada-Lobo, B.2
  • 15
    • 65549090638 scopus 로고    scopus 로고
    • A swedish integrated pulp and paper mill-energy optimisation and local heat cooperation
    • S. Klugman, M. Karlsson, and B. Moshfegh A swedish integrated pulp and paper mill-energy optimisation and local heat cooperation Energy Policy 37 7 2009 2514 2524
    • (2009) Energy Policy , vol.37 , Issue.7 , pp. 2514-2524
    • Klugman, S.1    Karlsson, M.2    Moshfegh, B.3
  • 16
    • 0036508153 scopus 로고    scopus 로고
    • Order allocation for stock cutting in the paper industry
    • S. Menon, and L. Schrage Order allocation for stock cutting in the paper industry Operations Research 50 2 2002 324 332
    • (2002) Operations Research , vol.50 , Issue.2 , pp. 324-332
    • Menon, S.1    Schrage, L.2
  • 18
    • 0033903519 scopus 로고    scopus 로고
    • Simultaneous lotsizing and scheduling by combining local search with dual reoptimization
    • H. Meyr Simultaneous lotsizing and scheduling by combining local search with dual reoptimization European Journal of Operational Research 120 2 2000 311 326
    • (2000) European Journal of Operational Research , vol.120 , Issue.2 , pp. 311-326
    • Meyr, H.1
  • 22
    • 60349090312 scopus 로고    scopus 로고
    • Solving a multi-level capacitated lot sizing problem with multi-period setup carry-over via a fix-and-optimize heuristic
    • F. Sahling, L. Buschkühl, H. Tempelmeier, and S. Helber Solving a multi-level capacitated lot sizing problem with multi-period setup carry-over via a fix-and-optimize heuristic Computers & Operations Research 36 9 2009 2546 2553
    • (2009) Computers & Operations Research , vol.36 , Issue.9 , pp. 2546-2553
    • Sahling, F.1    Buschkühl, L.2    Tempelmeier, H.3    Helber, S.4
  • 24
    • 0141733592 scopus 로고    scopus 로고
    • Multilevel lot sizing with setup times and multiple constrained resources: Internally rolling schedules with lot-sizing windows
    • H. Stadtler Multilevel lot sizing with setup times and multiple constrained resources: Internally rolling schedules with lot-sizing windows Operations Research 51 3 2003 487 502
    • (2003) Operations Research , vol.51 , Issue.3 , pp. 487-502
    • Stadtler, H.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.