-
1
-
-
34547356612
-
Mip-based heuristics for multi-item capacitated lot-sizing problem with setup times and shortage costs
-
N. Absi, and S. Kedad-Sidhoum Mip-based heuristics for multi-item capacitated lot-sizing problem with setup times and shortage costs RAIRO Operations Research 41 2 2007 171 192
-
(2007)
RAIRO Operations Research
, vol.41
, Issue.2
, pp. 171-192
-
-
Absi, N.1
Kedad-Sidhoum, S.2
-
2
-
-
78650068281
-
Multiple machine continuous setup lotsizing with sequence-dependent setups
-
B. Almada-Lobo, D. Klabjan, M. Carravilla, and J.F. Oliveira Multiple machine continuous setup lotsizing with sequence-dependent setups Computational Optimization and Applications 47 3 2010 529 552
-
(2010)
Computational Optimization and Applications
, vol.47
, Issue.3
, pp. 529-552
-
-
Almada-Lobo, B.1
Klabjan, D.2
Carravilla, M.3
Oliveira, J.F.4
-
4
-
-
43949099319
-
Using splitting methods in continuous digester modeling
-
A. Araujo, J.A. Ferreira, N. Fernandes, and P. de Oliveira Using splitting methods in continuous digester modeling Applied Mathematical Modelling 32 9 2008 1869 1882
-
(2008)
Applied Mathematical Modelling
, vol.32
, Issue.9
, pp. 1869-1882
-
-
Araujo, A.1
Ferreira, J.A.2
Fernandes, N.3
De Oliveira, P.4
-
5
-
-
33845515674
-
Increased capacity in kraft pulp mills: Lignin separation and reduced steam demand compared with recovery boiler upgrade
-
E. Axelsson, M.R. Olsson, and T. Berntsson Increased capacity in kraft pulp mills: Lignin separation and reduced steam demand compared with recovery boiler upgrade Nordic Pulp & Paper Research Journal 21 4 2006 485 492
-
(2006)
Nordic Pulp & Paper Research Journal
, vol.21
, Issue.4
, pp. 485-492
-
-
Axelsson, E.1
Olsson, M.R.2
Berntsson, T.3
-
6
-
-
79951846026
-
Editorial on lot sizing and scheduling: Industrial extensions and research opportunities
-
A. Clark, B. Almada-Lobo, and C. Almeder Editorial on lot sizing and scheduling: Industrial extensions and research opportunities International Journal of Production Research 49 9 2011 1 5
-
(2011)
International Journal of Production Research
, vol.49
, Issue.9
, pp. 1-5
-
-
Clark, A.1
Almada-Lobo, B.2
Almeder, C.3
-
8
-
-
58149250389
-
Solution approaches for the soft drink integrated production lot sizing and scheduling problem
-
D. Ferreira, R. Morabito, and S. Rangel Solution approaches for the soft drink integrated production lot sizing and scheduling problem European Journal of Operational Research 196 2009 697 706
-
(2009)
European Journal of Operational Research
, vol.196
, pp. 697-706
-
-
Ferreira, D.1
Morabito, R.2
Rangel, S.3
-
9
-
-
53549108021
-
Solving a multi-period supply chain problem for a pulp company using heuristics - An application to södra cell ab
-
H. Gunnarsson, and M. Rönnqvist Solving a multi-period supply chain problem for a pulp company using heuristics - An application to södra cell ab International Journal of Production Economics 116 1 2008 75 94
-
(2008)
International Journal of Production Economics
, vol.116
, Issue.1
, pp. 75-94
-
-
Gunnarsson, H.1
Rönnqvist, M.2
-
10
-
-
74149086575
-
A fix-and-optimize approach for the multi-level capacitated lot sizing problem
-
S. Helber, and F. Sahling A fix-and-optimize approach for the multi-level capacitated lot sizing problem International Journal of Production Economics 123 2 2010 247 256
-
(2010)
International Journal of Production Economics
, vol.123
, Issue.2
, pp. 247-256
-
-
Helber, S.1
Sahling, F.2
-
11
-
-
79955056703
-
Single and parallel machine capacitated lotsizing and scheduling: New iterative mip-based neighborhood search heuristics
-
R.J. James, and B. Almada-Lobo Single and parallel machine capacitated lotsizing and scheduling: New iterative mip-based neighborhood search heuristics Computers & Operations Research 38 12 2011 1816 1825
-
(2011)
Computers & Operations Research
, vol.38
, Issue.12
, pp. 1816-1825
-
-
James, R.J.1
Almada-Lobo, B.2
-
13
-
-
75749090414
-
Pathways to a sustainable european pulp and paper industry: Trade-offs between different technologies and system solutions for kraft pulp mills
-
Pts. 1, 2 and 18 994
-
Jonsson, J., & Algehed, J. (2009). Pathways to a sustainable european pulp and paper industry: Trade-offs between different technologies and system solutions for kraft pulp mills. In Pres'09: 12th international conference on process integration, modelling and optimisation for energy saving and pollution reduction (Pts. 1, 2 and 18, pp. 917-922, 994).
-
(2009)
Pres'09: 12th International Conference on Process Integration, Modelling and Optimisation for Energy Saving and Pollution Reduction
, pp. 917-922
-
-
Jonsson, J.1
Algehed, J.2
-
15
-
-
65549090638
-
A swedish integrated pulp and paper mill-energy optimisation and local heat cooperation
-
S. Klugman, M. Karlsson, and B. Moshfegh A swedish integrated pulp and paper mill-energy optimisation and local heat cooperation Energy Policy 37 7 2009 2514 2524
-
(2009)
Energy Policy
, vol.37
, Issue.7
, pp. 2514-2524
-
-
Klugman, S.1
Karlsson, M.2
Moshfegh, B.3
-
16
-
-
0036508153
-
Order allocation for stock cutting in the paper industry
-
S. Menon, and L. Schrage Order allocation for stock cutting in the paper industry Operations Research 50 2 2002 324 332
-
(2002)
Operations Research
, vol.50
, Issue.2
, pp. 324-332
-
-
Menon, S.1
Schrage, L.2
-
18
-
-
0033903519
-
Simultaneous lotsizing and scheduling by combining local search with dual reoptimization
-
H. Meyr Simultaneous lotsizing and scheduling by combining local search with dual reoptimization European Journal of Operational Research 120 2 2000 311 326
-
(2000)
European Journal of Operational Research
, vol.120
, Issue.2
, pp. 311-326
-
-
Meyr, H.1
-
20
-
-
35348864359
-
A coupling cutting stock-lot sizing problem in the paper industry
-
S.C. Poltroniere, K.C. Poldi, F.M.B. Toledo, and M.N. Arenales A coupling cutting stock-lot sizing problem in the paper industry Annals of Operations Research 157 1 2008 91 104
-
(2008)
Annals of Operations Research
, vol.157
, Issue.1
, pp. 91-104
-
-
Poltroniere, S.C.1
Poldi, K.C.2
Toledo, F.M.B.3
Arenales, M.N.4
-
21
-
-
62749114090
-
-
Working paper DT-2004-AM-3
-
Rizk, N., Martel, A., & DAmours, S. (2004). Production planning in the pulp and paper industry. Working paper DT-2004-AM-3, pp. 1-10.
-
(2004)
Production Planning in the Pulp and Paper Industry
, pp. 1-10
-
-
Rizk, N.1
Martel, A.2
Damours, S.3
-
22
-
-
60349090312
-
Solving a multi-level capacitated lot sizing problem with multi-period setup carry-over via a fix-and-optimize heuristic
-
F. Sahling, L. Buschkühl, H. Tempelmeier, and S. Helber Solving a multi-level capacitated lot sizing problem with multi-period setup carry-over via a fix-and-optimize heuristic Computers & Operations Research 36 9 2009 2546 2553
-
(2009)
Computers & Operations Research
, vol.36
, Issue.9
, pp. 2546-2553
-
-
Sahling, F.1
Buschkühl, L.2
Tempelmeier, H.3
Helber, S.4
-
24
-
-
0141733592
-
Multilevel lot sizing with setup times and multiple constrained resources: Internally rolling schedules with lot-sizing windows
-
H. Stadtler Multilevel lot sizing with setup times and multiple constrained resources: Internally rolling schedules with lot-sizing windows Operations Research 51 3 2003 487 502
-
(2003)
Operations Research
, vol.51
, Issue.3
, pp. 487-502
-
-
Stadtler, H.1
|