메뉴 건너뛰기




Volumn 43, Issue 1, 2012, Pages 132-139

Single-machine scheduling with deteriorating jobs

Author keywords

deteriorating jobs; makespan; scheduling; total completion time

Indexed keywords

COMPLETION TIME; DETERIORATING JOBS; MAKESPAN; NONLINEAR FUNCTIONS; POLYNOMIAL-TIME; PROCESSING TIME; SINGLE-MACHINE SCHEDULING; TOTAL COMPLETION TIME; USEFUL PROPERTIES; WEIGHTED COMPLETION;

EID: 84857215221     PISSN: 00207721     EISSN: 14645319     Source Type: Journal    
DOI: 10.1080/00207721003802263     Document Type: Article
Times cited : (8)

References (28)
  • 1
    • 84974859788 scopus 로고
    • A heuristic solution procedure to minimize makespan on a single machine with nonlinear cost functions
    • Alidaee, B. (1990), 'A Heuristic Solution Procedure to Minimize Makespan on a Single Machine with Nonlinear Cost Functions', Journal of the Operational Research Society, 41, 1065-1068.
    • (1990) Journal of the Operational Research Society , vol.41 , pp. 1065-1068
    • Alidaee, B.1
  • 2
    • 0032682389 scopus 로고    scopus 로고
    • Scheduling with time dependent processing times: Review and extensions
    • Alidaee, B., and Womer, N.K. (1999), 'Scheduling with Time Dependent Processing Times: Review and Extensions', Journal of the Operational Research Society, 50, 711-729.
    • (1999) Journal of the Operational Research Society , vol.50 , pp. 711-729
    • Alidaee, B.1    Womer, N.K.2
  • 3
    • 0034325430 scopus 로고    scopus 로고
    • Minimizing maximum lateness under linear deterioration
    • Bachman, A., and Janiak, A. (2000), 'Minimizing Maximum Lateness under Linear Deterioration', European Journal of Operational Research, 126, 557-566.
    • (2000) European Journal of Operational Research , vol.126 , pp. 557-566
    • Bachman, A.1    Janiak, A.2
  • 4
    • 0037203614 scopus 로고    scopus 로고
    • Minimizing the total weighted completion of deteriorating jobs
    • Bachman, A., Janiak, A., and Kovalyov, M.Y. (2002), 'Minimizing the Total Weighted Completion of Deteriorating Jobs', Information Processing Letters, 81, 81-84.
    • (2002) Information Processing Letters , vol.81 , pp. 81-84
    • Bachman, A.1    Janiak, A.2    Kovalyov, M.Y.3
  • 5
    • 0025429963 scopus 로고
    • Scheduling deteriorating jobs on a single processor
    • Browne, S., and Yechiali, U. (1990), 'Scheduling Deteriorating Jobs on a Single Processor', Operations Research, 38, 495-498.
    • (1990) Operations Research , vol.38 , pp. 495-498
    • Browne, S.1    Yechiali, U.2
  • 6
    • 0004670639 scopus 로고    scopus 로고
    • On a scheduling problem of time deteriorating jobs
    • Cai, J.Y., Cai, P., and Zhu, Y. (1998), 'On a Scheduling Problem of Time Deteriorating Jobs', Journal of Complexity, 14, 190-209.
    • (1998) Journal of Complexity , vol.14 , pp. 190-209
    • Cai, J.Y.1    Cai, P.2    Zhu, Y.3
  • 7
    • 0037211214 scopus 로고    scopus 로고
    • Scheduling start time dependent tasks with deadlines and identical initial processing times on a single machine
    • Cheng, T.C.E., and Ding, Q. (2003), 'Scheduling Start Time Dependent Tasks with Deadlines and Identical Initial Processing Times on a Single Machine', Computers and Operations Research, 30, 51-62.
    • (2003) Computers and Operations Research , vol.30 , pp. 51-62
    • Cheng, T.C.E.1    Ding, Q.2
  • 8
    • 0034349899 scopus 로고    scopus 로고
    • Single machine scheduling with deadlines and increasing rates of processing times
    • Cheng, T.C.E., and Ding, Q. (2000), 'Single Machine Scheduling with Deadlines and Increasing Rates of Processing Times', Acta Informatica, 36, 673-692.
    • (2000) Acta Informatica , vol.36 , pp. 673-692
    • Cheng, T.C.E.1    Ding, Q.2
  • 9
    • 0035502107 scopus 로고    scopus 로고
    • Single machine scheduling with step-deteriorating processing time
    • Cheng, T.C.E., and Ding, Q. (2001), 'Single Machine Scheduling with Step-deteriorating Processing Time', European Journal of Operational Research, 134, 623-630.
    • (2001) European Journal of Operational Research , vol.134 , pp. 623-630
    • Cheng, T.C.E.1    Ding, Q.2
  • 13
    • 0024137249 scopus 로고
    • Single facility scheduling with nonlinear processing times
    • Gupta, J.N.D., and Gupta, S.K. (1988), 'Single Facility Scheduling with Nonlinear Processing Times', Computers and Industrial Engineering, 14, 387-393.
    • (1988) Computers and Industrial Engineering , vol.14 , pp. 387-393
    • Gupta, J.N.D.1    Gupta, S.K.2
  • 14
    • 2342514890 scopus 로고    scopus 로고
    • Makespan minimization in single-machine scheduling with stepdeterioration of processing times
    • Jeng, A.A.K., and Lin, B.M.T. (2004), 'Makespan Minimization in Single-machine Scheduling with Stepdeterioration of Processing Times', Journal of the Operational Research Society, 55, 247-255.
    • (2004) Journal of the Operational Research Society , vol.55 , pp. 247-255
    • Jeng, A.A.K.1    Lin, B.M.T.2
  • 15
    • 4744369369 scopus 로고    scopus 로고
    • Minimizing the total completion time in single-machine scheduling with stepdeteriorating jobs
    • Jeng, A.A.K., and Lin, B.M.T. (2005), 'Minimizing the Total Completion Time in Single-machine Scheduling with Stepdeteriorating Jobs', Computers and Operations Research, 32, 521-536.
    • (2005) Computers and Operations Research , vol.32 , pp. 521-536
    • Jeng, A.A.K.1    Lin, B.M.T.2
  • 16
    • 68249107269 scopus 로고    scopus 로고
    • Parallel-machine scheduling of simple linear deteriorating jobs
    • Ji, M., and Cheng, T.C.E. (2009), 'Parallel-machine Scheduling of Simple Linear Deteriorating Jobs', Theoretical Computer Science, 410, 3761-3768.
    • (2009) Theoretical Computer Science , vol.410 , pp. 3761-3768
    • Ji, M.1    Cheng, T.C.E.2
  • 17
  • 18
    • 33750993497 scopus 로고    scopus 로고
    • Single-machine and two-machine flowshop scheduling with general learning functions
    • Koulamas, C., and Kyparisis, G.J. (2007), 'Single-machine and Two-machine Flowshop Scheduling with General Learning Functions', European Journal of Operational Research, 178, 402-407.
    • (2007) European Journal of Operational Research , vol.178 , pp. 402-407
    • Koulamas, C.1    Kyparisis, G.J.2
  • 19
    • 0032136143 scopus 로고    scopus 로고
    • Scheduling deteriorating jobs to minimize makespan
    • Kubiak, W., and Velde, S. (1998), 'Scheduling Deteriorating Jobs to Minimize Makespan', Naval Research Logistics, 45, 511-523.
    • (1998) Naval Research Logistics , vol.45 , pp. 511-523
    • Kubiak, W.1    Velde, S.2
  • 20
    • 0028463787 scopus 로고
    • Scheduling jobs under linear deterioration
    • Mosheiov, G. (1994), 'Scheduling Jobs under Linear Deterioration', Computers and Operations Research, 21, 653-659.
    • (1994) Computers and Operations Research , vol.21 , pp. 653-659
    • Mosheiov, G.1
  • 21
    • 0029390921 scopus 로고
    • Scheduling jobs with step-deterioration: Minimizing makespan on a single and multimachine
    • Mosheiov, G. (1995), 'Scheduling Jobs with Step-deterioration: Minimizing Makespan on a Single and Multimachine', Computers and Industrial Engineering, 28, 869-879.
    • (1995) Computers and Industrial Engineering , vol.28 , pp. 869-879
    • Mosheiov, G.1
  • 23
    • 0028533158 scopus 로고
    • Single machine scheduling with start time-dependent processing times: Some solvable cases
    • Sundararaghavan, P.S., and Kunnathur, A.S. (1994), 'Single Machine Scheduling with Start Time-dependent Processing Times: Some Solvable Cases', European Journal of Operational Research, 78, 394-403.
    • (1994) European Journal of Operational Research , vol.78 , pp. 394-403
    • Sundararaghavan, P.S.1    Kunnathur, A.S.2
  • 24
    • 67549084335 scopus 로고    scopus 로고
    • Single machine scheduling problems under the effects of nonlinear deterioration and time-dependent learning
    • Toksari, M.D., Oron, D., and Güner, E. (2009), 'Single Machine Scheduling Problems under the Effects of Nonlinear Deterioration and Time-dependent Learning', Mathematical and Computer Modelling, 50, 401-406.
    • (2009) Mathematical and Computer Modelling , vol.50 , pp. 401-406
    • Toksari, M.D.1    Oron, D.2    Güner, E.3
  • 25
    • 0017921371 scopus 로고
    • The single machine problem with quadratic penalty function of completion times: A branch-and-bound solution
    • Townsend, W. (1978), 'The Single Machine Problem with Quadratic Penalty Function of Completion Times: A Branch-and-bound Solution', Management Science, 24, 530-534.
    • (1978) Management Science , vol.24 , pp. 530-534
    • Townsend, W.1
  • 26
    • 33749005938 scopus 로고    scopus 로고
    • A note on scheduling problems with learning effect and deteriorating jobs
    • Wang, J.B. (2006), 'A Note on Scheduling Problems with Learning Effect and Deteriorating Jobs', International Journal of Systems Science, 37, 827-833.
    • (2006) International Journal of Systems Science , vol.37 , pp. 827-833
    • Wang, J.B.1
  • 27
  • 28
    • 72049090643 scopus 로고    scopus 로고
    • Some scheduling problems with deteriorating jobs and learning effects
    • Yang, D.L., and Kuo, W.H. (2010), 'Some Scheduling Problems with Deteriorating Jobs and Learning Effects', Computers and Industrial Engineering, 58, 25-28.
    • (2010) Computers and Industrial Engineering , vol.58 , pp. 25-28
    • Yang, D.L.1    Kuo, W.H.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.