메뉴 건너뛰기




Volumn 32, Issue 3, 2005, Pages 521-536

Minimizing the total completion time in single-machine scheduling with step-deteriorating jobs

Author keywords

Branch and bound algorithm; Single machine scheduling; Step deterioration; Total completion time

Indexed keywords

ALGORITHMS; COMPUTATIONAL METHODS; DIFFERENTIAL EQUATIONS; FUNCTIONS; MACHINERY; MATHEMATICAL MODELS; OPTIMIZATION; PARAMETER ESTIMATION; SCHEDULING;

EID: 4744369369     PISSN: 03050548     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.cor.2003.08.001     Document Type: Article
Times cited : (26)

References (16)
  • 1
    • 0035502107 scopus 로고    scopus 로고
    • Single machine scheduling with step-deteriorating processing times
    • Cheng T.C.E., Ding Q. Single machine scheduling with step-deteriorating processing times. European Journal of Operational Research. 134:2001;623-630.
    • (2001) European Journal of Operational Research , vol.134 , pp. 623-630
    • Cheng, T.C.E.1    Ding, Q.2
  • 3
    • 38249036438 scopus 로고
    • Optimal repayment policies for multiple loans
    • Gupta S.K., Kunnathur A.S., Dandapai K. Optimal repayment policies for multiple loans. Omega. 15:1987;323-330.
    • (1987) Omega , vol.15 , pp. 323-330
    • Gupta, S.K.1    Kunnathur, A.S.2    Dandapai, K.3
  • 6
    • 0029292057 scopus 로고
    • A note on single-processor scheduling with time-dependent execution times
    • Chen Z.L. A note on single-processor scheduling with time-dependent execution times. Operations Research Letters. 17:1995;127-129.
    • (1995) Operations Research Letters , vol.17 , pp. 127-129
    • Chen, Z.L.1
  • 7
    • 0034349899 scopus 로고    scopus 로고
    • Single machine scheduling with deadlines and increasing rate of processing times
    • Cheng T.C.E., Ding Q. Single machine scheduling with deadlines and increasing rate of processing times. Acta Informatica. 36:2000;673-692.
    • (2000) Acta Informatica , vol.36 , pp. 673-692
    • Cheng, T.C.E.1    Ding, Q.2
  • 8
    • 0028463787 scopus 로고
    • Scheduling jobs under simple linear deterioration
    • Mosheiov G. Scheduling jobs under simple linear deterioration. Computers and Operations Research. 21:1994;653-659.
    • (1994) Computers and Operations Research , vol.21 , pp. 653-659
    • Mosheiov, G.1
  • 9
    • 0025700721 scopus 로고
    • Minimizing the makespan with late start penalties added to processing times in a single facility scheduling problem
    • Kunnathur A.S., Gupta S.K. Minimizing the makespan with late start penalties added to processing times in a single facility scheduling problem. European Journal of Operational Research. 47:1990;56-64.
    • (1990) European Journal of Operational Research , vol.47 , pp. 56-64
    • Kunnathur, A.S.1    Gupta, S.K.2
  • 10
    • 0032136143 scopus 로고    scopus 로고
    • Scheduling deteriorating jobs to minimize makespan
    • Kubiak W., van de Velde S.L. Scheduling deteriorating jobs to minimize makespan. Naval Research Logistics. 45:1998;511-523.
    • (1998) Naval Research Logistics , vol.45 , pp. 511-523
    • Kubiak, W.1    Van De Velde, S.L.2
  • 11
    • 0029390921 scopus 로고
    • Scheduling jobs with step-deterioration; Minimizing makespan on a single and multi-machine
    • Mosheiov G. Scheduling jobs with step-deterioration; minimizing makespan on a single and multi-machine. Computers and Industrial Engineering. 28:1995;869-879.
    • (1995) Computers and Industrial Engineering , vol.28 , pp. 869-879
    • Mosheiov, G.1
  • 12
    • 0028533158 scopus 로고
    • Single machine scheduling with start time dependent processing times: Some solvable cases
    • Sundararaghavan P.S., Kunnathur A.S. Single machine scheduling with start time dependent processing times. some solvable cases European Journal of Operational Research. 79:1994;394-403.
    • (1994) European Journal of Operational Research , vol.79 , pp. 394-403
    • Sundararaghavan, P.S.1    Kunnathur, A.S.2
  • 13
    • 4744341906 scopus 로고    scopus 로고
    • Makespan minimization in single-machine scheduling with step-deterioration of processing times
    • manuscript submitted for publication
    • Jeng AAK, Lin BMT. Makespan minimization in single-machine scheduling with step-deterioration of processing times. Journal of the Operational Research Society 2002, manuscript submitted for publication.
    • (2002) Journal of the Operational Research Society
    • Jeng, A.A.K.1    Lin, B.M.T.2
  • 15
    • 0032682389 scopus 로고    scopus 로고
    • Scheduling with time dependent processing times: Review and extensions
    • Alidaee B., Womer N.K. Scheduling with time dependent processing times. review and extensions Journal of the Operational Research Society. 50:1999;711-720.
    • (1999) Journal of the Operational Research Society , vol.50 , pp. 711-720
    • Alidaee, B.1    Womer, N.K.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.