메뉴 건너뛰기




Volumn , Issue , 2011, Pages 235-242

System-level optimization of maintenance and replacement decisions for road networks

Author keywords

[No Author keywords available]

Indexed keywords

BUDGET CONTROL; CONSTRUCTION INDUSTRY; PARETO PRINCIPLE; ROADS AND STREETS;

EID: 84856699331     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: 10.1201/b11332-36     Document Type: Conference Paper
Times cited : (5)

References (24)
  • 1
    • 2342469732 scopus 로고
    • Resource-constrained capital budgeting model for bridge maintenance, rehabilitation, and replacement
    • Al-Subhi, K., J.D.W., & F.F. (1990). Resource-constrained capital budgeting model for bridge maintenance, rehabilitation, and replacement. Transportation Research Record 1268, 110-117.
    • (1990) Transportation Research Record , vol.1268 , pp. 110-117
    • Al-Subhi, K.1    W, J.D.2    F, F.3
  • 5
    • 34249034942 scopus 로고    scopus 로고
    • Capturing interdependencies and heterogeneity in the management of multi-facility transportation infrastructure systems
    • Durango-Cohen, P. & P. Sarutipand (2007). Capturing interdependencies and heterogeneity in the management of multi-facility transportation infrastructure systems. Journal of Infrastructure Systems 13(2), 115-123.
    • (2007) Journal of Infrastructure Systems , vol.13 , Issue.2 , pp. 115-123
    • Durango-Cohen, P.1    Sarutipand, P.2
  • 6
    • 0018720409 scopus 로고
    • A model of optimal transport maintenance with demand responsiveness
    • Friesz, T. & J.E. Fernandez (1979). A model of optimal transport maintenance with demand responsiveness. Transportation Research Part B 13(4), 317-339.
    • (1979) Transportation Research Part B , vol.13 , Issue.4 , pp. 317-339
    • Friesz, T.1    Fernandez, J.E.2
  • 7
    • 0032202016 scopus 로고    scopus 로고
    • Scheduling of pavement maintenance to minimize traffic delays
    • Fwa, T.C.R. & A. Muntasir (1998). Scheduling of pavement maintenance to minimize traffic delays. Transportation Research Record 1650, 28-35.
    • (1998) Transportation Research Record , vol.1650 , pp. 28-35
    • Fwa, T.C.R.1    Muntasir, A.2
  • 8
    • 0002539999 scopus 로고
    • A statewide pavement management system
    • Golabi, K., R. Kulkarni, & G. Way (1982). A statewide pavement management system. Interfaces 12(6), 5-21.
    • (1982) Interfaces , vol.12 , Issue.6 , pp. 5-21
    • Golabi, K.1    Kulkarni, R.2    Way, G.3
  • 9
    • 0039054430 scopus 로고
    • Pontis: A system for maintenance optimization and improvement for U.S. bridge networks
    • Golabi, K. & R. Shepard (1982). Pontis: A system for maintenance optimization and improvement for u.s. bridge networks. Interfaces 27(1), 71-88.
    • (1982) Interfaces , vol.27 , Issue.1 , pp. 71-88
    • Golabi, K.1    Shepard, R.2
  • 10
    • 34548173455 scopus 로고    scopus 로고
    • An algorithm for the planning of optimum highway work zones
    • Hajdin, R. & H.P. Lindenmann (2007). An algorithm for the planning of optimum highway work zones. Journal of Infrastructure Systems 13(3), 202-214.
    • (2007) Journal of Infrastructure Systems , vol.13 , Issue.3 , pp. 202-214
    • Hajdin, R.1    Lindenmann, H.P.2
  • 11
    • 33646808628 scopus 로고    scopus 로고
    • Model uncertainty and management of a system of infrastructure facilities
    • Kuhn, K.D. & S.M. Madanat (2005). Model uncertainty and management of a system of infrastructure facilities. Transportation Research Part C 13(5-6).
    • (2005) Transportation Research Part C , vol.13 , pp. 5-6
    • Kuhn, K.D.1    Madanat, S.M.2
  • 12
    • 15944379640 scopus 로고    scopus 로고
    • Computer simulation model: Construction analysis for pavement rehabilitation strategies
    • Lee, E.B. & C.W. Ibbs (2005). Computer simulation model: Construction analysis for pavement rehabilitation strategies. Journal of Construction Engineering & Management 131(4), 449-458.
    • (2005) Journal of Construction Engineering & Management , vol.131 , Issue.4 , pp. 449-458
    • Lee, E.B.1    Ibbs, C.W.2
  • 13
    • 0036643294 scopus 로고    scopus 로고
    • A steady-state solution for the optimal pavement resurfacing problem
    • Li, Y. & S.M. Madanat (2002). A steady-state solution for the optimal pavement resurfacing problem. Transportation Research Part A 36(6), 525-535.
    • (2002) Transportation Research Part A , vol.36 , Issue.6 , pp. 525-535
    • Li, Y.1    Madanat, S.M.2
  • 14
    • 0001891686 scopus 로고
    • Optimal inspection and repair policies for infrastructure facilities
    • Madanat, S.M. & M. Ben-Akiva (1994). Optimal inspection and repair policies for infrastructure facilities. Transportation Science 28, 55-62.
    • (1994) Transportation Science , vol.28 , pp. 55-62
    • Madanat, S.M.1    Ben-Akiva, M.2
  • 15
    • 33747283719 scopus 로고    scopus 로고
    • Adaptive optimization and systematic probing of infrastructure system maintenance policies under model uncertainty
    • Madanat, S.M., P.S., & K.K.D. (2006). Adaptive optimization and systematic probing of infrastructure system maintenance policies under model uncertainty. Journal of Infrastructure Systems 12(3), 192-198.
    • (2006) Journal of Infrastructure Systems , vol.12 , Issue.3 , pp. 192-198
    • Madanat, S.M.1    S, P.2    D, K.K.3
  • 16
    • 69149102428 scopus 로고    scopus 로고
    • Optimal long-term infrastructure maintenance planning accounting for traffic dynamics
    • Ng, M., D.Y. Lin, & S.T. Waller (2009). Optimal long-term infrastructure maintenance planning accounting for traffic dynamics. Computer-Aided Civil and Infrastructure Engineering 24, 459-469.
    • (2009) Computer-Aided Civil and Infrastructure Engineering , vol.24 , pp. 459-469
    • Ng, M.1    Lin, D.Y.2    Waller, S.T.3
  • 17
    • 33847217607 scopus 로고    scopus 로고
    • Pavement resurfacing planning for highway networks: Parametric policy iteration approach
    • Ouyang, Y. (2007). Pavement resurfacing planning for highway networks: Parametric policy iteration approach. Journal of Infrastructure Systems 13(1), 65-71.
    • (2007) Journal of Infrastructure Systems , vol.13 , Issue.1 , pp. 65-71
    • Ouyang, Y.1
  • 18
    • 33745039168 scopus 로고    scopus 로고
    • An analytical solution for the finite-horizon pavement resurfacing planning problem
    • Ouyang, Y. & S.M. Madanat (2006). An analytical solution for the finite-horizon pavement resurfacing planning problem. Transportation Research Part B 40(9), 767-778.
    • (2006) Transportation Research Part B , vol.40 , Issue.9 , pp. 767-778
    • Ouyang, Y.1    Madanat, S.M.2
  • 19
    • 84856731812 scopus 로고
    • The development of optimal strategies for maintenance, rehabilitation and replacement of highway bridges, final report vol. 1: The elements of indiana bridge management system
    • FHWA, U.S. Department of Transportation
    • Sinha, K., M. Saito, Y. Jiang, S. Murthy, A.B. Tee, & M. Bowman (1988). The development of optimal strategies for maintenance, rehabilitation and replacement of highway bridges, final report vol. 1: The elements of indiana bridge management system. Technical report, FHWA/IN/JHRP-88/15, FHWA, U.S. Department of Transportation.
    • (1988) Technical Report, FHWA/IN/JHRP-88/15
    • Sinha, K.1    Saito, M.2    Jiang, Y.3    Murthy, S.4    Tee, A.B.5    Bowman, M.6
  • 20
    • 0033882484 scopus 로고    scopus 로고
    • Optimal inspection, maintenance and rehabilitation policies for networks of infrastructure facilities
    • Smilowitz, K. & S. Madanat (2000). Optimal inspection, maintenance and rehabilitation policies for networks of infrastructure facilities. Computer Aided Civil and Infrastructure Engineering 15(1), 5-13.
    • (2000) Computer Aided Civil and Infrastructure Engineering , vol.15 , Issue.1 , pp. 5-13
    • Smilowitz, K.1    Madanat, S.2
  • 21
    • 34249830539 scopus 로고
    • A time-indexed formulation of non-preemptive single machine scheduling problems
    • Sousa, J.P. & L.A. Wolsey (1992). A time-indexed formulation of non-preemptive single machine scheduling problems. Mathematical Programming 54, 353-367.
    • (1992) Mathematical Programming , vol.54 , pp. 353-367
    • Sousa, J.P.1    Wolsey, L.A.2
  • 22
    • 38149144449 scopus 로고
    • Trend curve optimal control model for highway pavement maintenance: Case study and evaluation
    • Tsunokawa, K. & J. Schofer (1994). Trend curve optimal control model for highway pavement maintenance: Case study and evaluation. Transportation Research Part A 28(2), 151-166.
    • (1994) Transportation Research Part A , vol.28 , Issue.2 , pp. 151-166
    • Tsunokawa, K.1    Schofer, J.2
  • 24
    • 84879702550 scopus 로고    scopus 로고
    • Maintenance optimization for heterogeneous infrastructure systems: Evolutionary algorithms for bottom-up methods
    • Yeo, H., Y. Yoon, & S.M. Madanat (2010). Maintenance optimization for heterogeneous infrastructure systems: Evolutionary algorithms for bottom-up methods. Sustainable Infrastructure Systems, 185-199.
    • (2010) Sustainable Infrastructure Systems , pp. 185-199
    • Yeo, H.1    Yoon, Y.2    Madanat, S.M.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.