-
1
-
-
77952515855
-
Pathway to a more sustainable water sector: Sustainability-based asset management
-
D. Marlow, D. Beale, and S.A. Burn Pathway to a more sustainable water sector: sustainability-based asset management Water Science and Technology 61 2010 1245 1255
-
(2010)
Water Science and Technology
, vol.61
, pp. 1245-1255
-
-
Marlow, D.1
Beale, D.2
Burn, S.A.3
-
10
-
-
0027797485
-
Practical Aspects of Providing Reliability in Water Distribution Systems
-
T.M. Walski Practical Aspects of Providing Reliability In Water Distribution Systems Reliability Engineering and System Safety 42 1 1993 13 19
-
(1993)
Reliability Engineering and System Safety
, vol.42
, Issue.1
, pp. 13-19
-
-
Walski, T.M.1
-
11
-
-
0027882649
-
Water Distribution Valve Topology for Reliability Analysis
-
T.M. Walski Water Distribution Valve Topology for Reliability Analysis Reliability Engineering and System Safety 42 1 1993 21 27
-
(1993)
Reliability Engineering and System Safety
, vol.42
, Issue.1
, pp. 21-27
-
-
Walski, T.M.1
-
12
-
-
67349228029
-
Business-oriented prioritization: A novel graphical technique
-
R. Pascual, G. Del Castillo, D. Louit, and P. Knights business-oriented prioritization: a novel graphical technique Reliability Engineering and System Safety 94 8 2009 1308 1313
-
(2009)
Reliability Engineering and System Safety
, vol.94
, Issue.8
, pp. 1308-1313
-
-
Pascual, R.1
Del Castillo, G.2
Louit, D.3
Knights, P.4
-
13
-
-
78751580539
-
A framework for reliability and risk centered maintenance
-
J.T. Selvik, and T. Aven A framework for reliability and risk centered maintenance Reliability Engineering and System Safety 96 2 2011 324 331
-
(2011)
Reliability Engineering and System Safety
, vol.96
, Issue.2
, pp. 324-331
-
-
Selvik, J.T.1
Aven, T.2
-
14
-
-
0141458358
-
A comprehensive framework for evaluation of piping reliability due to erosioncorrosion for risk-informed in-service inspection
-
G. Vinod, S.K. Bidhar, H.S. Kushwaha, A.K. Verma, and A. Srividya A comprehensive framework for evaluation of piping reliability due to erosioncorrosion for risk-informed in-service inspection Reliability Engineering and System Safety 82 2 2003 187 193
-
(2003)
Reliability Engineering and System Safety
, vol.82
, Issue.2
, pp. 187-193
-
-
Vinod, G.1
Bidhar, S.K.2
Kushwaha, H.S.3
Verma, A.K.4
Srividya, A.5
-
15
-
-
1642617608
-
Comparison of approaches for estimating pipe rupture frequencies for risk-informed in-service inspections
-
K. Simola, U. Pulkkinen, H. Talja, P. Karjalainen-Roikonen, and A. Saarenheimo Comparison of approaches for estimating pipe rupture frequencies for risk-informed in-service inspections Reliability Engineering and System Safety 84 1 2004 65 74
-
(2004)
Reliability Engineering and System Safety
, vol.84
, Issue.1
, pp. 65-74
-
-
Simola, K.1
Pulkkinen, U.2
Talja, H.3
Karjalainen-Roikonen, P.4
Saarenheimo, A.5
-
16
-
-
0035545606
-
Reliability-based assessment of ageing bridges using risk ranking and life cycle cost decision analyses
-
DOI 10.1016/S0951-8320(01)00079-5, PII S0951832001000795
-
M.G. Stewart Reliability-based assessment of ageing bridges using risk ranking and life cycle cost decision analyses Reliability Engineering and System Safety 74 3 2001 263 273 (Pubitemid 33018667)
-
(2001)
Reliability Engineering and System Safety
, vol.74
, Issue.3
, pp. 263-273
-
-
Stewart, M.G.1
-
17
-
-
54049102014
-
Multi-attribute risk assessment for risk ranking of natural gas pipelines
-
A.J. Brito, and A.T. de Almeida Multi-attribute risk assessment for risk ranking of natural gas pipelines Reliability Engineering and System Safety 94 2009 187 198
-
(2009)
Reliability Engineering and System Safety
, vol.94
, pp. 187-198
-
-
Brito, A.J.1
De Almeida, A.T.2
-
20
-
-
0028519313
-
Aqueduct management planning: Thirlmere, haweswater and vyrnwy aqueducts
-
R.F. Critchley, and D.I. Aikman Aqueduct management planning: thirlmere, haweswater and vyrnwy aqueducts Water and Environment Journal 8 1994 502 512
-
(1994)
Water and Environment Journal
, vol.8
, pp. 502-512
-
-
Critchley, R.F.1
Aikman, D.I.2
-
21
-
-
84857370012
-
-
MI-AWWA/MWEA Annual Conference American Water Works Assocaition
-
Schumi P. Criticality of Valve Operability. MI-AWWA/MWEA Annual Conference American Water Works Assocaition; 2009.
-
(2009)
Criticality of Valve Operability
-
-
Schumi, P.1
-
22
-
-
77952787576
-
Effective management of large diameter pressure pipes
-
D. Marlow, D. DeSilva, D. Beale, and D. Marney Effective management of large diameter pressure pipes Journal AWWA 102 6 June 2010
-
(2010)
Journal AWWA
, vol.102
, Issue.6
-
-
Marlow, D.1
Desilva, D.2
Beale, D.3
Marney, D.4
-
24
-
-
69249089783
-
Failure assessment modeling to prioritize water pipe renewal: Two case studies
-
P.D. Rogers, and N.S. Grigg Failure assessment modeling to prioritize water pipe renewal: Two case studies Journal of Infrastructure Systems 15 2009 162 171
-
(2009)
Journal of Infrastructure Systems
, vol.15
, pp. 162-171
-
-
Rogers, P.D.1
Grigg, N.S.2
-
26
-
-
0037402085
-
Risk assessment for civil engineering facilities: Critical overview and discussion
-
M.H. Faber, and M.G. Stewart Risk assessment for civil engineering facilities: critical overview and discussion Reliability Engineering and System Safety 80 2003 173 184
-
(2003)
Reliability Engineering and System Safety
, vol.80
, pp. 173-184
-
-
Faber, M.H.1
Stewart, M.G.2
-
27
-
-
34248513088
-
-
IPWEA Australia/NZ Edition ed: Institute of Public Works Engineering Australia
-
IPWEA. International Infrastructure Management Manual. Australia/NZ Edition ed: Institute of Public Works Engineering Australia; 2006.
-
(2006)
International Infrastructure Management Manual
-
-
-
28
-
-
0034980376
-
Classifying medical devices according to their maintenance sensitivity: A practical risk-based approach to PM program management
-
May/June:16776
-
Ridgeway M. Classifying medical devices according to their maintenance sensitivity: A practical risk-based approach to PM program management. Biomedical Instrumentation and Technology. 2001;May/June:16776.
-
(2001)
Biomedical Instrumentation and Technology
-
-
Ridgeway, M.1
-
29
-
-
0242487685
-
Risk-based maintenance (RBM): A quantitative approach for maintenance/inspection scheduling and planning
-
DOI 10.1016/j.jlp.2003.08.011
-
F.I. Khan, and M.M. Haddara Risk-based maintenance (RBM): a quantitative approach for maintenance/inspection scheduling and planning Journal of Loss Prevention in the Process Industries 16 2003 561 573 (Pubitemid 37365795)
-
(2003)
Journal of Loss Prevention in the Process Industries
, vol.16
, Issue.6
, pp. 561-573
-
-
Khan, F.I.1
Haddara, M.M.2
-
30
-
-
34247379830
-
Multilevel risk-based inspection scheme for FPSOs
-
A.K. Lee, C. Serratella, G. Wang, R. Basu, and R. Spong Multilevel risk-based inspection scheme for FPSOs Marine Technology 44 2007 118 124 (Pubitemid 46643616)
-
(2007)
Marine Technology
, vol.44
, Issue.2
, pp. 118-124
-
-
Lee, A.K.1
Serratella, C.2
Wang, G.3
Basu, R.4
Spong, R.5
-
31
-
-
33645105070
-
Risk-based integrity and inspection modeling (rbiim) of process components/system
-
F.I. Khan, M.M. Haddara, and S.K. Bhattacharya Risk-based integrity and inspection modeling (rbiim) of process components/system Risk Analysis 26 2006 203 221
-
(2006)
Risk Analysis
, vol.26
, pp. 203-221
-
-
Khan, F.I.1
Haddara, M.M.2
Bhattacharya, S.K.3
-
33
-
-
0035854273
-
Risk-based model aids selection of pipeline inspection maintenance strategies
-
P.K. Dey, and S.S. Gupta Risk-based model aids selection of pipeline inspection maintenance strategies Oil and Gas Journal 2001 173 184
-
(2001)
Oil and Gas Journal
, pp. 173-184
-
-
Dey, P.K.1
Gupta, S.S.2
-
35
-
-
0031198734
-
Rank-based statistical procedures in analytic hierarchy process
-
PII S0377221796001592
-
I. Basak Rank-based statistical procedures in the analytical hierachy process European Journal of Operational Research 101 1997 39 50 (Pubitemid 127399913)
-
(1997)
European Journal of Operational Research
, vol.101
, Issue.1
, pp. 39-50
-
-
Basak, I.1
-
36
-
-
38249007252
-
Group decision making using the analytic hierarchy process
-
I. Basak, and T. Saaty Group decision making using the analytic hierarchy process Mathematical and Computer Modelling 17 1993 101 109
-
(1993)
Mathematical and Computer Modelling
, vol.17
, pp. 101-109
-
-
Basak, I.1
Saaty, T.2
-
37
-
-
0032124178
-
Aggregating individual judgments and priorities with the Analytic Hierarchy Process
-
PII S0377221797002440
-
E. Forman, and K. Peniwati Aggregating individual judgments and priorities with the analytic hierarchy process European Journal of Operational Research 108 1998 165 169 (Pubitemid 128372596)
-
(1998)
European Journal of Operational Research
, vol.108
, Issue.1
, pp. 165-169
-
-
Forman, E.1
Peniwati, K.2
|