Volumn 137, Issue 12, 2011, Pages 1164-1175

Identification of risk paths in international construction projects using structural equation modeling

Author keywords

International construction; Risk identification; Risk paths; Structural equation modeling

Indexed keywords

CAUSAL RELATIONSHIPS; CONSTRUCTION PROJECTS; COST OVERRUNS; DECISION MAKERS; FOREIGN COUNTRIES; IDENTIFICATION OF RISKS; INDIVIDUAL RISKS; INTERNATIONAL CONSTRUCTION; INTERNATIONAL CONSTRUCTION PROJECTS; INTERNATIONAL MARKETS; MITIGATION STRATEGY; PROJECT COST; PROJECT ENVIRONMENT; PROJECT SYSTEMS; RISK FACTORS; RISK IDENTIFICATION; STRUCTURAL EQUATION MODELING; STRUCTURAL EQUATION MODELING TECHNIQUES; TOTAL EFFECT; TURKISHS;

EID: 84855944211     PISSN: 07339364     EISSN: None     Source Type: Journal    
DOI: 10.1061/(ASCE)CO.1943-7862.0000382     Document Type: Article
Times cited : (180)

References (51)
  • 1
    • 0031705846 scopus 로고    scopus 로고
    • Factors affecting contractors' risk of cost overburden
    • Akinci, B., and Fischer, M. (1998). Factors affecting contractors' risk of cost overburden.. J. Manage. Eng. 0742-597X, 14 (1), 67-76. 10.1061/(ASCE)0742-597X(1998)14:1(67) (Pubitemid 128633455)
    • (1998) Journal of Management in Engineering , vol.14 , Issue.1 , pp. 67-76
    • Akinci, B.1    Fischer, M.2
  • 2
    • 0025491311 scopus 로고
    • Systematic risk management approach for construction projects
    • 0733-9364, 10.1061/(ASCE)0733-9364(1990)116:3(533)
    • Al-Bahar, J. F., and Crandall, K. C. (1990). Systematic risk management approach for construction projects.. J. Constr. Eng. Manage. 0733-9364, 116 (3), 533-546. 10.1061/(ASCE)0733-9364(1990)116:3(533)
    • (1990) J. Constr. Eng. Manage. , vol.116 , Issue.3 , pp. 533-546
    • Al-Bahar, J.F.1    Crandall, K.C.2
  • 3
    • 77951276981 scopus 로고    scopus 로고
    • Causes, effects, benefits, and remedies of change orders on public construction projects in Oman
    • 0733-9364, 10.1061/(ASCE)CO.1943-7862.0000154
    • Alnuaimi, A. S., Taha, R. A., Mohsin, M. A., and Al-Harthi, A. S. (2010). Causes, effects, benefits, and remedies of change orders on public construction projects in Oman.. J. Constr. Eng. Manage. 0733-9364, 136 (5), 615-622. 10.1061/(ASCE)CO.1943-7862.0000154
    • (2010) J. Constr. Eng. Manage. , vol.136 , Issue.5 , pp. 615-622
    • Alnuaimi, A.S.1    Taha, R.A.2    Mohsin, M.A.3    Al-Harthi, A.S.4
  • 4
    • 41649112685 scopus 로고
    • Structural equation modeling in practice: A review and recommended two-step approach
    • 0033-2909, 10.1037/0033-2909.103.3.411
    • Anderson, J., and Gerbing, D. (1988). Structural equation modeling in practice: A review and recommended two-step approach.. Psychol. Bull. 0033-2909, 103 (3), 411-423. 10.1037/0033-2909.103.3.411
    • (1988) Psychol. Bull. , vol.103 , Issue.3 , pp. 411-423
    • Anderson, J.1    Gerbing, D.2
  • 5
    • 0000115558 scopus 로고    scopus 로고
    • The development of a short form of the EMBU: Its appraisal with students in Greece, Guatemala, Hungary and Italy
    • 0191-8869, 10.1016/S0191-8869(98)00192-5
    • Arrindell, W. A., Sanavio, E., and Aguilar, G. (1999). The development of a short form of the EMBU: Its appraisal with students in Greece, Guatemala, Hungary and Italy.. Pers. Individ. Differ. 0191-8869, 27 (4), 613-628. 10.1016/S0191-8869(98)00192-5
    • (1999) Pers. Individ. Differ. , vol.27 , Issue.4 , pp. 613-628
    • Arrindell, W.A.1    Sanavio, E.2    Aguilar, G.3
  • 6
    • 0023421720 scopus 로고
    • Political risks in international construction
    • 0733-9364, 10.1061/(ASCE)0733-9364(1987)113:3(447)
    • Ashley, D. B., and Bonner, J. J. (1987). Political risks in international construction.. J. Constr. Eng. Manage. 0733-9364, 113 (3), 447-467. 10.1061/(ASCE)0733-9364(1987)113:3(447)
    • (1987) J. Constr. Eng. Manage. , vol.113 , Issue.3 , pp. 447-467
    • Ashley, D.B.1    Bonner, J.J.2
  • 7
    • 0037402597 scopus 로고    scopus 로고
    • Modelling global risk factors affecting construction cost performance
    • DOI 10.1016/S0263-7863(02)00017-0
    • Baloi, D., and Price, A. D. F. (2003). Modelling global risk factors affecting construction cost performance.. Int. J. Proj. Manage. 0263-7863, 21 (4), 261-269. 10.1016/S0263-7863(02)00017-0 (Pubitemid 36386768)
    • (2003) International Journal of Project Management , vol.21 , Issue.4 , pp. 261-269
    • Baloi, D.1    Price, A.D.F.2
  • 8
    • 27944455550 scopus 로고    scopus 로고
    • Understanding internally generated risks in projects
    • DOI 10.1016/j.ijproman.2005.05.006, PII S0263786305000591
    • Barber, R. B. (2005). Understanding internally generated risks in projects.. Int. J. Proj. Manage. 0263-7863, 23 (8), 584-590. 10.1016/j.ijproman.2005.05.006 (Pubitemid 41671383)
    • (2005) International Journal of Project Management , vol.23 , Issue.8 , pp. 584-590
    • Barber, R.B.1
  • 9
    • 0030173778 scopus 로고    scopus 로고
    • A new framework for determining critical success/failure factors in projects
    • DOI 10.1016/0263-7863(95)00064-X
    • Belassi, W., and Tukel, O. I. (1996). A new framework for determining critical success/failure factors in projects.. Int. J. Proj. Manage. 0263-7863, 14 (3), 141-151. 10.1016/0263-7863(95)00064-X (Pubitemid 126397312)
    • (1996) International Journal of Project Management , vol.14 , Issue.3 , pp. 141-151
    • Belassi, W.1    Tukel, O.I.2
  • 11
    • 0001233581 scopus 로고
    • Alternative ways of assessing model fit
    • K. A. Bollen and J. S. Long, eds., Sage Publications, Newberry Park, CA
    • Browne, M. W., and Cudeck, R. (1993). Alternative ways of assessing model fit.. Testing structural equation models, K. A. Bollen, and, J. S. Long, eds., Sage Publications, Newberry Park, CA, 445-455.
    • (1993) Testing Structural Equation Models , pp. 445-455
    • Browne, M.W.1    Cudeck, R.2
  • 13
    • 0032346794 scopus 로고    scopus 로고
    • The effectiveness of working group risk identification and assessment techniques
    • PII S0263786398000155
    • Chapman, R. J. (1998). The effectiveness of working group risk identification and assessment techniques.. Int. J. Proj. Manage. 0263-7863, 16 (6), 333-343. 10.1016/S0263-7863(98)00015-5 (Pubitemid 128429300)
    • (1998) International Journal of Project Management , vol.16 , Issue.6 , pp. 333-343
    • Chapman, R.J.1
  • 14
    • 0000419448 scopus 로고
    • Model modification in covariance structure modelling: A comparison among likelihood ratio, Lagrange multiplier, and Wald tests
    • 0027-3171, 10.1207/s15327906mbr2501-13
    • Chou, C. P., and Bentler, P. M. (1990). Model modification in covariance structure modelling: A comparison among likelihood ratio, Lagrange multiplier, and Wald tests.. Multivariate Behav. Res. 0027-3171, 25 (1), 115-136. 10.1207/s15327906mbr2501-13
    • (1990) Multivariate Behav. Res. , vol.25 , Issue.1 , pp. 115-136
    • Chou, C.P.1    Bentler, P.M.2
  • 15
    • 49349104055 scopus 로고    scopus 로고
    • Learning from risks: A tool for post-project risk assessment
    • (a). . 0926-5805, 10.1016/j.autcon.2008.04.008
    • Dikmen, I., Birgonul, M. T., Anac, C., Tah, J. H. M., and Aouad, G. (2008 a). Learning from risks: A tool for post-project risk assessment.. Autom. Constr. 0926-5805, 18 (1), 42-50. 10.1016/j.autcon.2008.04.008
    • (2008) Autom. Constr. , vol.18 , Issue.1 , pp. 42-50
    • Dikmen, I.1    Birgonul, M.T.2    Anac, C.3    Tah, J.H.M.4    Aouad, G.5
  • 16
    • 79960261983 scopus 로고    scopus 로고
    • Assessment of project vulnerability as a part of risk management in construction
    • Conseil International du Btiment (CIB), Rotterdam, Netherlands
    • Dikmen, I., Birgonul, M. T., and Fidan, G. (2008 b). Assessment of project vulnerability as a part of risk management in construction.. Proc., Joint CIB W065/W055 Symp., Conseil International du Btiment (CIB), Rotterdam, Netherlands.
    • (2008) Proc., Joint CIB W065/W055 Symp.
    • Dikmen, I.1    Birgonul, M.T.2    Fidan, G.3
  • 17
    • 34248366102 scopus 로고    scopus 로고
    • A risk and vulnerability ontology for construction projects
    • 0263-7863, 10.1016/j.ijproman.2006.12.002
    • Dikmen, I., Birgonul, M. T., and Fidan, G. (2009). A risk and vulnerability ontology for construction projects.. Int. J. Eng. Manage. 0263-7863, 25 (5), 494-505. 10.1016/j.ijproman.2006.12.002
    • (2009) Int. J. Eng. Manage. , vol.25 , Issue.5 , pp. 494-505
    • Dikmen, I.1    Birgonul, M.T.2    Fidan, G.3
  • 19
    • 34447299462 scopus 로고    scopus 로고
    • Infrastructure vulnerability assessment model (I-VAM)
    • DOI 10.1111/j.1539-6924.2007.00907.x
    • Ezell, B. C. (2007). Infrastructure vulnerability assessment model I-VAM.. Risk Anal. 0272-4332, 27 (3), 571-583. 10.1111/j.1539-6924.2007.00907.x (Pubitemid 47063173)
    • (2007) Risk Analysis , vol.27 , Issue.3 , pp. 571-583
    • Ezell, B.C.1
  • 20
    • 79960258110 scopus 로고    scopus 로고
    • Ontology for relating risk and vulnerability to cost overrun in international projects
    • 0887-3801, 10.1061/(ASCE)CP.1943-5487.0000090
    • Fidan, G., Dikmen, I., Tanyer, A. M., and Birgonul, M. T. (2011). Ontology for relating risk and vulnerability to cost overrun in international projects.. J. Comput. Civ. Eng. 0887-3801, 25 (4), 302-315. 10.1061/(ASCE)CP. 1943-5487.0000090
    • (2011) J. Comput. Civ. Eng. , vol.25 , Issue.4 , pp. 302-315
    • Fidan, G.1    Dikmen, I.2    Tanyer, A.M.3    Birgonul, M.T.4
  • 22
    • 5444257339 scopus 로고    scopus 로고
    • Logistics research methods: Employing structural equation modeling to test for construct validity
    • 0263-7863, 10.1016/j.ijproman.2004.05.004
    • Garver, M. S., and Mentzer, J. T. (1999). Logistics research methods: Employing structural equation modeling to test for construct validity.. J. Bus. Logist. 0263-7863, 22 (8), 633-643. 10.1016/j.ijproman.2004.05.004
    • (1999) J. Bus. Logist. , vol.22 , Issue.8 , pp. 633-643
    • Garver, M.S.1    Mentzer, J.T.2
  • 23
    • 14544305602 scopus 로고    scopus 로고
    • Factors affecting international construction
    • DOI 10.1061/(ASCE)0733-9364(2005)131:3(273)
    • Gunhan, S., and Arditi, D. (2005). Factors affecting international construction.. J. Constr. Eng. Manage. 0733-9364, 131 (3), 273-282. 10.1061/(ASCE)0733-9364(2005)131:3(273) (Pubitemid 40303935)
    • (2005) Journal of Construction Engineering and Management , vol.131 , Issue.3 , pp. 273-282
    • Gunhan, S.1    Arditi, D.2
  • 25
    • 0035392728 scopus 로고    scopus 로고
    • Approaches for making risk-based Go/No-Go decision for international projects
    • DOI 10.1061/(ASCE)0733-9364(2001)127:4(300), Reportnr 22188
    • Han, S. H., and Diekmann, J. E. (2001). Approaches for making risk-based go/no-go decision for international projects.. J. Constr. Eng. Manage. 0733-9364, 127 (4), 300-308. 10.1061/(ASCE)0733-9364(2001)127:4(300) (Pubitemid 32715360)
    • (2001) Journal of Construction Engineering and Management , vol.127 , Issue.4 , pp. 300-308
    • Han, S.H.1    Diekmann, J.E.2
  • 26
    • 37549017361 scopus 로고    scopus 로고
    • Judgment-based cross-impact method for predicting cost variance for highly uncertain projects
    • 0926-5805, 10.1016/j.autcon.2007.05.012
    • Han, S. H., and Diekmann, J. E. (2004). Judgment-based cross-impact method for predicting cost variance for highly uncertain projects.. J. Constr. Res. 0926-5805, 17 (3), 342-356. 10.1016/j.autcon.2007.05.012
    • (2004) J. Constr. Res. , vol.17 , Issue.3 , pp. 342-356
    • Han, S.H.1    Diekmann, J.E.2
  • 27
    • 36248956557 scopus 로고    scopus 로고
    • Causes of bad profit in overseas construction projects
    • DOI 10.1061/(ASCE)0733-9364(2007)133:12(932)
    • Han, S. H., Park, S. H., Kim, D. Y., Kim, H., and Kang, Y. W. (2007). Causes of bad profit in overseas construction projects.. J. Constr. Eng. Manage. 0733-9364, 133 (12), 932-943. 10.1061/(ASCE)0733-9364(2007)133:12(932) (Pubitemid 350129066)
    • (2007) Journal of Construction Engineering and Management , vol.133 , Issue.12 , pp. 932-943
    • Han, S.H.1    Park, S.H.2    Kim, D.Y.3    Kim, H.4    Kang, Y.W.5
  • 28
    • 0033689577 scopus 로고    scopus 로고
    • ICRAM-1: Model for international construction risk assessment
    • 0742-597X, 10.1061/(ASCE)0742-597X(2000)16:1(59)
    • Hastak, B. M., and Shaked, A. (2000). ICRAM-1: Model for international construction risk assessment.. J. Manage. Eng. 0742-597X, 16 (1), 59-69. 10.1061/(ASCE)0742-597X(2000)16:1(59)
    • (2000) J. Manage. Eng. , vol.16 , Issue.1 , pp. 59-69
    • Hastak, B.M.1    Shaked, A.2
  • 29
    • 60449091309 scopus 로고    scopus 로고
    • Measuring the impact of rework on construction cost performance
    • 0733-9364, 10.1061/(ASCE)0733-9364(2009)135:3(187)
    • Hwang, B. G., Thomas, S. R., Haas, C. T., and Caldas, C. H. (2009). Measuring the impact of rework on construction cost performance.. J. Constr. Eng. Manage. 0733-9364, 135 (3), 187-198. 10.1061/(ASCE)0733-9364(2009)135: 3(187)
    • (2009) J. Constr. Eng. Manage. , vol.135 , Issue.3 , pp. 187-198
    • Hwang, B.G.1    Thomas, S.R.2    Haas, C.T.3    Caldas, C.H.4
  • 30
    • 0003331188 scopus 로고    scopus 로고
    • LISREL approaches to interaction effects in multiple regression
    • 0149-192X
    • Jaccard, J., and Wan, C. K. (1996). LISREL approaches to interaction effects in multiple regression.. Sage Univ. Paper Series: Quant. App. in Social Sci. 0149-192X, 114, 7-114.
    • (1996) Sage Univ. Paper Series: Quant. App. in Social Sci. , vol.114 , pp. 7-114
    • Jaccard, J.1    Wan, C.K.2
  • 31
    • 77954888978 scopus 로고    scopus 로고
    • Introduction to structural equation modeling (path analysis)
    • , Society of General Internal Medicine (SGIM), Alexandria, VA
    • Jackson, J. L., Dezee, K., Douglas, K., and Shimeall, W. (2005). Introduction to structural equation modeling (path analysis).. SGIM Precourse PA08, Society of General Internal Medicine (SGIM), Alexandria, VA.
    • (2005) SGIM Precourse PA08
    • Jackson, J.L.1    Dezee, K.2    Douglas, K.3    Shimeall, W.4
  • 32
    • 56349120726 scopus 로고    scopus 로고
    • Cognition, culture and competition: An empirical test of the learning organization
    • 0957-4174, 10.1016/j.eswa.2007.12.048
    • Jashapara, A. (2003). Cognition, culture and competition: An empirical test of the learning organization.. Learning Org. Int. J. 0957-4174, 36 (2), 1961-1971. 10.1016/j.eswa.2007.12.048
    • (2003) Learning Org. Int. J. , vol.36 , Issue.2 , pp. 1961-1971
    • Jashapara, A.1
  • 35
    • 84855941384 scopus 로고    scopus 로고
    • A knowledge-based system for identifying potential project risks
    • 0733-9364, 10.1061/(ASCE)0733-9364(2000)126:4(268)
    • Leung, H. M., Chuah, K. B., and Tummala, V. M. R. (1998). A knowledge-based system for identifying potential project risks.. Int. J. Manag. Sci. 0733-9364, 126 (4), 268-277. 10.1061/(ASCE)0733-9364(2000)126:4(268)
    • (1998) Int. J. Manag. Sci. , vol.126 , Issue.4 , pp. 268-277
    • Leung, H.M.1    Chuah, K.B.2    Tummala, V.M.R.3
  • 37
    • 0030123663 scopus 로고    scopus 로고
    • The role of project management in achieving project success
    • Munns, A. K., and Bjeirmi, B. F. (1996). The role of project management in achieving project success.. Int. J. Proj. Manage. 0263-7863, 14 (2), 81-87. 10.1016/0263-7863(95)00057-7 (Pubitemid 126692395)
    • (1996) International Journal of Project Management , vol.14 , Issue.2 , pp. 81-87
    • Munns, A.K.1    Bjeirmi, B.F.2
  • 39
    • 84930124504 scopus 로고
    • Causes of high costs of construction in Nigeria
    • 0733-9364, 10.1061/(ASCE)0733-9364(1988)114:2(233)
    • Okpala, D. C., and Aniekwu, A. N. (1988). Causes of high costs of construction in Nigeria.. J. Constr. Eng. Manage. 0733-9364, 114 (2), 233-244. 10.1061/(ASCE)0733-9364(1988)114:2(233)
    • (1988) J. Constr. Eng. Manage. , vol.114 , Issue.2 , pp. 233-244
    • Okpala, D.C.1    Aniekwu, A.N.2
  • 40
    • 34248402903 scopus 로고    scopus 로고
    • Causes and effects of delays in Malaysian construction industry
    • DOI 10.1016/j.ijproman.2006.11.007, PII S0263786306001700
    • Sambasivan, M., and Soon, Y. W. (2007). Causes and effects of delays in Malaysian construction industry.. Int. J. Proj. Manage. 0263-7863, 25 (5), 517-526. 10.1016/j.ijproman.2006.11.007 (Pubitemid 46731273)
    • (2007) International Journal of Project Management , vol.25 , Issue.5 , pp. 517-526
    • Sambasivan, M.1    Soon, Y.W.2
  • 41
    • 33749397397 scopus 로고    scopus 로고
    • The search for "optimal" cutoff properties: Fit index criteria in structural equation modeling
    • DOI 10.3200/JEXE.74.3.267-288
    • Sivo, S. A., Fan, X., Witta, E. L., and Willse, J. T. (2006). The search for optimal cut-off properties: Fit index criteria in structural equation modeling.. J. Exp. Educ. 0022-0973, 74 (3), 267-288. 10.3200/JEXE.74.3.267-288 (Pubitemid 44757331)
    • (2006) Journal of Experimental Education , vol.74 , Issue.3 , pp. 267-288
    • Sivo, S.A.1    Xitao, F.A.N.2    Witta, E.L.3    Willse, J.T.4
  • 43
    • 0003669844 scopus 로고    scopus 로고
    • Standards Australia. Australian Standard AS 4360, Homebush, Australia
    • Standards Australia. (2004). Risk management.. Australian Standard AS 4360, Homebush, Australia.
    • (2004) Risk Management
  • 44
    • 67349175338 scopus 로고    scopus 로고
    • Taxonomy for change causes and effects in construction projects
    • 0263-7863, 10.1016/j.ijproman.2008.10.005
    • Sun, M., and Meng, X. (2009). Taxonomy for change causes and effects in construction projects.. Int. J. Proj. Manage. 0263-7863, 27 (6), 560-572. 10.1016/j.ijproman.2008.10.005
    • (2009) Int. J. Proj. Manage. , vol.27 , Issue.6 , pp. 560-572
    • Sun, M.1    Meng, X.2
  • 45
    • 0013337442 scopus 로고    scopus 로고
    • A proposal for construction project risk assessment using fuzzy logic
    • 0144-6193, 10.1080/01446190050024905
    • Tah, J. H. M., and Carr, V. (2000). A proposal for construction project risk assessment using fuzzy logic.. Constr. Manage. Econ. 0144-6193, 18 (4), 491-500. 10.1080/01446190050024905
    • (2000) Constr. Manage. Econ. , vol.18 , Issue.4 , pp. 491-500
    • Tah, J.H.M.1    Carr, V.2
  • 46
    • 33747891546 scopus 로고    scopus 로고
    • Structural equation modeling: Reviewing the basics and moving forward
    • DOI 10.1207/s15327752jpa8701-03
    • Ullman, J. B. (2006). Structural equation modeling: Reviewing the basics and moving forward.. J. Pers. Assess. 0022-3891, 87 (1), 35-50. 10.1207/s15327752jpa8701-03 (Pubitemid 44289969)
    • (2006) Journal of Personality Assessment , vol.87 , Issue.1 , pp. 35-50
    • Ullman, J.B.1
  • 47
    • 2342420461 scopus 로고    scopus 로고
    • Risk management framework for construction projects in developing countries
    • DOI 10.1080/0144619032000124689
    • Wang, S. Q., Dulaimi, M. F., and Aguria, M. Y. (2004). Risk management framework for construction projects in developing countries.. Constr. Manage. Econ. 0144-6193, 22 (3), 237-252. 10.1080/0144619032000124689 (Pubitemid 38562529)
    • (2004) Construction Management and Economics , vol.22 , Issue.3 , pp. 237-252
    • Wang, S.Q.1    Dulaimi, M.F.2    Aguria, M.Y.3
  • 48
    • 0032595613 scopus 로고    scopus 로고
    • Assessing and managing important risks
    • 0263-7863, 10.1016/S0263-7863(98)00051-9
    • Ward, S. C. (1999). Assessing and managing important risks.. Int. J. Proj. Manage. 0263-7863, 17 (6), 331-336. 10.1016/S0263-7863(98)00051-9
    • (1999) Int. J. Proj. Manage. , vol.17 , Issue.6 , pp. 331-336
    • Ward, S.C.1
  • 49
    • 34548568922 scopus 로고    scopus 로고
    • A redefinition of the project risk process: Using vulnerability to open up the event-consequence link
    • DOI 10.1016/j.ijproman.2007.02.004, PII S0263786307000452
    • Zhang, H. (2007). A redefinition of the project risk process: using vulnerability to open up the event-consequence link.. Int. J. Proj. Manage. 0263-7863, 25 (7), 694-701. 10.1016/j.ijproman.2007.02.004 (Pubitemid 47386989)
    • (2007) International Journal of Project Management , vol.25 , Issue.7 , pp. 694-701
    • Zhang, H.1
  • 50
    • 0011127465 scopus 로고
    • Risk management for overseas construction projects
    • 0263-7863, 10.1016/0263-7863(95)00015-I
    • Zhi, H. (1995). Risk management for overseas construction projects.. Int. J. Proj. Manage. 0263-7863, 13 (4), 231-237. 10.1016/0263-7863(95)00015-I
    • (1995) Int. J. Proj. Manage. , vol.13 , Issue.4 , pp. 231-237
    • Zhi, H.1
  • 51
    • 27644523324 scopus 로고    scopus 로고
    • Knowledge-based risk identification in infrastructure projects
    • DOI 10.1139/l03-001
    • Zoysa, S. D., and Russell, A. D. (2003). Knowledge-based risk identification in infrastructure projects.. Can. J. Civ. Eng. 0315-1468, 30 (3), 511-522. 10.1139/l03-001 (Pubitemid 351611965)
    • (2003) Canadian Journal of Civil Engineering , vol.30 , Issue.3 , pp. 511-522
    • De Zoysa, S.1    Russell, A.D.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.