메뉴 건너뛰기




Volumn 3, Issue 6, 2011, Pages

Short-term electricity dispatch optimization of Ertan hydropower plant based on data by field tests

Author keywords

[No Author keywords available]

Indexed keywords

ANCILLARY SERVICE; AVERAGE GENERATION; FIELD TEST; HYDRO POWER PRODUCTION; HYDROPOWER PLANTS; LOAD DEMAND; LOAD DISTRIBUTIONS; MODEL SOLUTION; OPERATIONAL CONSTRAINTS; OPTIMIZATION MODELS; OPTIMIZATION PROGRAMS; TEST CONDITION; UNIT COMMITMENTS;

EID: 84855318196     PISSN: 19417012     EISSN: None     Source Type: Journal    
DOI: 10.1063/1.3668287     Document Type: Article
Times cited : (11)

References (17)
  • 4
    • 61449182563 scopus 로고    scopus 로고
    • 10.1016/j.enconman.2008.12.004
    • J. W. Wang, Energy Convers. Manage. 50, 1085 (2009). 10.1016/j.enconman. 2008.12.004
    • (2009) Energy Convers. Manage. , vol.50 , pp. 1085
    • Wang, J.W.1
  • 5
    • 2342526058 scopus 로고    scopus 로고
    • Short-term scheduling of large-scale hydropower systems for energy maximization
    • DOI 10.1061/(ASCE)0733-9496(2004)130:3(198)
    • J. W. Wang, X. H. Yuan, and Y. C. Zhang, J. Water Resour. Plann. Manage. 130, 198 (2004). 10.1061/(ASCE)0733-9496(2004)130:3(198) (Pubitemid 38571087)
    • (2004) Journal of Water Resources Planning and Management , vol.130 , Issue.3 , pp. 198-205
    • Wang, J.1    Yuan, X.2    Zhang, Y.3
  • 9
    • 0019728413 scopus 로고
    • 10.1029/WR017i003p00481
    • A. Turgeon, Water Resour. Res. 17, 481 (1981). 10.1029/WR017i003p00481
    • (1981) Water Resour. Res. , vol.17 , pp. 481
    • Turgeon, A.1
  • 10
    • 0036605213 scopus 로고    scopus 로고
    • A hybrid chaotic genetic algorithm for short-term hydro system scheduling
    • DOI 10.1016/S0378-4754(01)00363-9, PII S0378475401003639
    • X. H. Yuan, Y. B. Yuan, and Y. C. Zhang, Math. Comput. Simul. 59, 319 (2002). 10.1016/S0378-4754(01)00363-9 (Pubitemid 34506145)
    • (2002) Mathematics and Computers in Simulation , vol.59 , Issue.4 , pp. 319-327
    • Yuan, X.1    Yuan, Y.2    Zhang, Y.3
  • 12
    • 39749190065 scopus 로고    scopus 로고
    • Short term hydroelectric power system scheduling with wind turbine generators using the multi-pass iteration particle swarm optimization approach
    • DOI 10.1016/j.enconman.2007.07.019, PII S0196890407002427
    • T. Y. Lee, Energy Convers. Manage. 49, 751 (2008). 10.1016/j.enconman. 2007.07.019 (Pubitemid 351625378)
    • (2008) Energy Conversion and Management , vol.49 , Issue.4 , pp. 751-760
    • Lee, T.-Y.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.