-
1
-
-
0031079225
-
Hydro unit Start-up costs and their impact on the Short Term Scheduling Strategies of Swedish Power Producers
-
O.Nilsson, D.Sjelvgren. Hydro unit Start-up costs and their impact on the Short Term Scheduling Strategies of Swedish Power Producers [ J]. IEEE Transaction on Power Systems, 1997, 12(1): 38-44.
-
(1997)
IEEE Transaction on Power Systems
, vol.12
, Issue.1
, pp. 38-44
-
-
Nilsson, O.1
Sjelvgren, D.2
-
2
-
-
0036474056
-
Optimal dispatch of generating unit of itaipu hydroelectric plant
-
Arce A, Ohishi T, Soares S. Optimal dispatch of generating unit of itaipu hydroelectric plant [J]. IEEE Transaction on Power Systems, 2002, 17(2): 154-158.
-
(2002)
IEEE Transaction on Power Systems
, vol.17
, Issue.2
, pp. 154-158
-
-
Arce, A.1
Ohishi, T.2
Soares, S.3
-
3
-
-
61949473863
-
Study on operation characteristic of hydropower station installed with two-row placed units
-
in Chinese
-
LIAN Jijian, QIN Liang. Study on operation characteristic of hydropower station installed with two-row placed units [J]. Water Resource and Hydropower Engineering, 2005, 36(11): 108-111. (in Chinese)
-
(2005)
Water Resource and Hydropower Engineering
, vol.36
, Issue.11
, pp. 108-111
-
-
Lian, J.1
Qin, L.2
-
4
-
-
33646742173
-
Vibration analysis of hydropower-house during start-up process
-
in Chinese
-
LIAN Jijian, QIN Liang, TIAN Huijing et al. Vibration analysis of hydropower-house during start-up process [J]. Journal of Hydroelectric Engineering, 2006, 25(2): 1-6. (in Chinese)
-
(2006)
Journal of Hydroelectric Engineering
, vol.25
, Issue.2
, pp. 1-6
-
-
Lian, J.1
Qin, L.2
Tian, H.3
-
5
-
-
33646158035
-
Research on site test in two-row placed units of Lijiaxia hydropower plant
-
School of Civil Engineering, Tianjin University, in Chinese
-
LIAN Jijian, QIN Liang. Research on site test in two-row placed units of Lijiaxia hydropower plant [R]. School of Civil Engineering, Tianjin University, 2004.4. (in Chinese)
-
(2004)
, pp. 4
-
-
Lian, J.1
Qin, L.2
-
6
-
-
61949196282
-
Research on placement of two-row placed units of Lijiaxia hydropower plant
-
in Chinese
-
LIN Jingming, WANG Renxuan. Research on placement of two-row placed units of Lijiaxia hydropower plant [J]. Qinghai Water Power, 1993, 3(3): 61-69. (in Chinese)
-
(1993)
Qinghai Water Power
, vol.3
, Issue.3
, pp. 61-69
-
-
Lin, J.1
Wang, R.2
-
8
-
-
33646740767
-
A practical unit commitment and load distribution model for hydropower plant
-
in Chinese
-
LI Hongbin, LI Chengjun, ZHOU Yanping. A practical unit commitment and load distribution model for hydropower plant [J]. Hydropower Automation and Dam Monitoring, 2003, 27(2): 1-4. (in Chinese)
-
(2003)
Hydropower Automation and Dam Monitoring
, vol.27
, Issue.2
, pp. 1-4
-
-
Li, H.1
Li, C.2
Zhou, Y.3
-
9
-
-
61949449211
-
-
Beijing: Science Press
-
ZHOU Shunrong. Electromenchanics [M]. Beijing: Science Press, 2002.
-
(2002)
Electromenchanics
-
-
Zhou, S.1
-
10
-
-
33646731795
-
Short-term optimal dispatch of cascaded hydropower stations based on improved ant algorithm
-
in Chinese
-
Lian Jijian, MA Chao, ZHANG Zhuo. Short-term Optimal Dispatch of Cascaded Hydropower Stations Based on Improved Ant Algorithm [J]. Journal of Tianjin University, 2006, 39(3): 264-268. (in Chinese)
-
(2006)
Journal of Tianjin University
, vol.39
, Issue.3
, pp. 264-268
-
-
Lian, J.1
Ma, C.2
Zhang, Z.3
|