메뉴 건너뛰기




Volumn 43, Issue 1, 2010, Pages 1-8

Short term hydropower dispatching optimization of cascaded hydropower junctions based on cluster genetic algorithm

Author keywords

Change gradient of unit's operation efficiency; Cluster genetic algorithm; Improved mutation operator; Short

Indexed keywords

CHANGE GRADIENT OF UNIT'S OPERATION EFFICIENCY; CROSSOVER OPERATOR; MULTI MODAL FUNCTION; MUTATION OPERATORS; OPERATION EFFICIENCIES; OPTIMIZATION EFFICIENCY; OPTIMIZATION MODELS; OPTIMIZATION STRATEGY; POWER GENERATION EFFICIENCY; SHORT TERM; STANDARD GENETIC ALGORITHM; THREE GORGES;

EID: 77949565361     PISSN: 04932137     EISSN: None     Source Type: Journal    
DOI: None     Document Type: Article
Times cited : (5)

References (9)
  • 2
    • 0035456145 scopus 로고    scopus 로고
    • Optimal operation of hydropower station reservoir by using an improved genetic algorithm
    • (in Chinese)
    • Chang Jianxia, Huang Qiang, Wang Yimin. Optimal operation of hydropower station reservoir by using an improved genetic algorithm[J]. Journal of Hydroelectric Engineering, 2001, 20(3): 85-90(in Chinese).
    • (2001) Journal of Hydroelectric Engineering , vol.20 , Issue.3 , pp. 85-90
    • Chang, J.1    Huang, Q.2    Wang, Y.3
  • 3
    • 35348990214 scopus 로고    scopus 로고
    • To solve the daily cascaded stations optimal scheduling with a diploid genotypes based on genetic algorithm
    • (in Chinese)
    • Wu Yonggang, Wang Dingyi. To solve the daily cascaded stations optimal scheduling with a diploid genotypes based on genetic algorithm[J]. Water Resource and Power, 1999, 17(3): 31-34(in Chinese).
    • (1999) Water Resource and Power , vol.17 , Issue.3 , pp. 31-34
    • Wu, Y.1    Wang, D.2
  • 4
    • 77949549329 scopus 로고    scopus 로고
    • Study on realtime optimized operation of cascaded hydropower stations based on market price bidding
    • (in Chinese)
    • Liu Xuehai, Lian Jijian, Ma Chao, et al. Study on realtime optimized operation of cascaded hydropower stations based on market price bidding[J]. Water Resource and Hydropower Engineering, 2005, 36(10): 53-57(in Chinese).
    • (2005) Water Resource and Hydropower Engineering , vol.36 , Issue.10 , pp. 53-57
    • Liu, X.1    Lian, J.2    Ma, C.3
  • 5
    • 34548480259 scopus 로고    scopus 로고
    • Short-term optimal dispatching of cascade hydropower stations in competitive power market
    • (in Chinese)
    • Lian Jijian, Ma Chao. Short-term optimal dispatching of cascade hydropower stations in competitive power market[J]. Journal of Hydroelectric Engineering, 2007, 26(4): 16-21(in Chinese).
    • (2007) Journal of Hydroelectric Engineering , vol.26 , Issue.4 , pp. 16-21
    • Lian, J.1    Ma, C.2
  • 8
    • 77949564820 scopus 로고    scopus 로고
    • Research on multi-scale and multi-objective combined optimal dispatching of cascaded hydropower junctions
    • Tianjin: School of Civil Engineering, Tianjin University (in Chinese).
    • Ma Chao. Research on Multi-Scale and Multi-Objective Combined Optimal Dispatching of Cascaded Hydropower Junctions[D]. Tianjin: School of Civil Engineering, Tianjin University, 2008(in Chinese).
    • (2008)
    • Ma, C.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.