Combination of project cost forecasts in earned value management

Author keywords

Cost; Earned value management; Forecasting; Project controls

Indexed keywords

ADAPTIVE FORECASTING; BAYESIAN INFERENCE; BAYESIAN MODEL AVERAGING; CASH FLOW; CONVENTIONAL APPROACH; COST ESTIMATE; COST OVERRUNS; EARNED VALUE MANAGEMENT; PERFORMANCE DATA; PROBABILISTIC COSTS; PROJECT CONTROL; PROJECT COST; PROJECT DATA; PROJECT EXECUTION; STATISTICAL MODELS; TOPDOWN;

EID: 83755207707     PISSN: 07339364     EISSN: None     Source Type: Journal    
DOI: 10.1061/(ASCE)CO.1943-7862.0000352     Document Type: Article
Times cited : (55)

References (19)
  • 3
    • 0033690430 scopus 로고    scopus 로고
    • Probabilistic monitoring of project performance using SS-curves
    • 0733-9364 10.1061/(ASCE)0733-9364(2000)126:2(142)
    • Barraza, G. A., Back, W. E., and Mata, F. (2000). Probabilistic monitoring of project performance using SS-curves. J. Constr. Eng. Manage., 126 (2), 142-148. 0733-9364 10.1061/(ASCE)0733-9364(2000)126:2(142)
    • (2000) J. Constr. Eng. Manage. , vol.126 , Issue.2 , pp. 142-148
    • Barraza, G.A.1    Back, W.E.2    Mata, F.3
  • 4
    • 13944254406 scopus 로고    scopus 로고
    • Probabilistic forecasting of project performance using stochastic S curves
    • DOI 10.1061/(ASCE)0733-9364(2004)130:1(25)
    • Barraza, G. A., Back, W. E., and Mata, F. (2004). Probabilistic forecasting of project performance using stochastic S curves. J. Constr. Eng. Manage., 130 (1), 25-32. 0733-9364 10.1061/(ASCE)0733-9364(2004)130:1(25) (Pubitemid 40265402)
    • (2004) Journal of Construction Engineering and Management , vol.130 , Issue.1 , pp. 25-32
    • Barraza, G.A.1    Back, W.E.2    Mata, F.3
  • 5
    • 0014629731 scopus 로고
    • The combination of forecasts
    • 0160-5682, 10.1057/jors.1969.103
    • Bates, J. M., and Granger, C. W. J. (1969). The combination of forecasts. Oper. Res. Q. 0160-5682, 20 (4), 451-468. 10.1057/jors.1969.103
    • (1969) Oper. Res. Q. , vol.20 , Issue.4 , pp. 451-468
    • Bates, J.M.1    Granger, C.W.J.2
  • 6
    • 0024621566 scopus 로고
    • Range estimating: Measuring uncertainty and reasoning with risk
    • 0274-9696
    • Curran, M. W. (1989). Range estimating: Measuring uncertainty and reasoning with risk. Cost Eng. 0274-9696, 31 (3), 18-26.
    • (1989) Cost Eng. , vol.31 , Issue.3 , pp. 18-26
    • Curran, M.W.1
  • 7
    • 0020825299 scopus 로고
    • Probabilistic estimating: Mathematics and applications
    • 0733-9364 10.1061/(ASCE)0733-9364(1983)109:3(297)
    • Diekmann, J. E. (1983). Probabilistic estimating: Mathematics and applications. J. Constr. Eng. Manage., 109 (3), 297-308. 0733-9364 10.1061/(ASCE)0733-9364(1983)109:3(297)
    • (1983) J. Constr. Eng. Manage. , vol.109 , Issue.3 , pp. 297-308
    • Diekmann, J.E.1
  • 8
    • 42949140480 scopus 로고    scopus 로고
    • From Nobel prize to project management: Getting risks right
    • 1938-9507
    • Flyvbjerg, B. (2006). From Nobel prize to project management: Getting risks right. Proj. Manage. J., 37 (3), 5-15. 1938-9507
    • (2006) Proj. Manage. J. , vol.37 , Issue.3 , pp. 5-15
    • Flyvbjerg, B.1
  • 10
    • 0001259111 scopus 로고    scopus 로고
    • Bayesian model averaging: A tutorial
    • 0883-4237 10.1214/ss/1009212519
    • Hoeting, J. A., Madigan, D., Raftery, A. E., and Volinsky, C. T. (1999). Bayesian model averaging: A tutorial. Stat. Sci., 14 (4), 382-401. 0883-4237 10.1214/ss/1009212519
    • (1999) Stat. Sci. , vol.14 , Issue.4 , pp. 382-401
    • Hoeting, J.A.1    Madigan, D.2    Raftery, A.E.3    Volinsky, C.T.4
  • 12
    • 60449092091 scopus 로고    scopus 로고
    • Probabilistic forecasting of project duration using Bayesian inference and the beta distribution
    • 0733-9364 10.1061/(ASCE)0733-9364(2009)135:3(178)
    • Kim, B. C., and Reinschmidt, K. F. (2009). Probabilistic forecasting of project duration using Bayesian inference and the beta distribution. J. Constr. Eng. Manage., 135 (3), 178-186. 0733-9364 10.1061/(ASCE)0733-9364(2009)135: 3(178)
    • (2009) J. Constr. Eng. Manage. , vol.135 , Issue.3 , pp. 178-186
    • Kim, B.C.1    Reinschmidt, K.F.2
  • 13
    • 1642277111 scopus 로고    scopus 로고
    • Delusions of success
    • 0017-8012
    • Lovallo, D., and Kahneman, D. (2003). Delusions of success. Harv. Bus. Rev., 81 (7), 56-63. 0017-8012
    • (2003) Harv. Bus. Rev. , vol.81 , Issue.7 , pp. 56-63
    • Lovallo, D.1    Kahneman, D.2
  • 15
    • 14544291098 scopus 로고    scopus 로고
    • Programmatic cost risk analysis for highway megaprojects
    • DOI 10.1061/(ASCE)0733-9364(2005)131:3(343)
    • Molenaar, K. R. (2005). Programmatic cost risk analysis for highway megaprojects. J. Constr. Eng. Manage., 131 (3), 343-353. 0733-9364 10.1061/(ASCE)0733-9364(2005)131:3(343) (Pubitemid 40303942)
    • (2005) Journal of Construction Engineering and Management , vol.131 , Issue.3 , pp. 343-353
    • Molenaar, K.R.1
  • 16
    • 0035335579 scopus 로고    scopus 로고
    • Predicting accuracy of early cost estimates based on estimate quality
    • DOI 10.1061/(ASCE)0733-9364(2001)127:3(173), Reportnr 22225
    • Oberlender, G. D., and Trost, S. M. (2001). Predicting accuracy of early cost estimates based on estimate quality. J. Constr. Eng. Manage., 127 (3), 173-182. 0733-9364 10.1061/(ASCE)0733-9364(2001)127:3(173) (Pubitemid 32508535)
    • (2001) Journal of Construction Engineering and Management , vol.127 , Issue.3 , pp. 173-182
    • Oberlender, G.D.1    Trost, S.M.2
  • 17
    • 58049139009 scopus 로고    scopus 로고
    • Project Management Institute (PMI). 4th ed., PMI, Newtown Square, PA
    • Project Management Institute (PMI). (2008). A guide to the project management body of knowledge, 4th ed., PMI, Newtown Square, PA.
    • (2008) A Guide to the Project Management Body of Knowledge
  • 18
    • 0016036092 scopus 로고
    • Probabilistic estimating
    • 0569-7948
    • Spooner, J. E. (1974). Probabilistic estimating. J. Constr. Div. 0569-7948, 100, 65-77.
    • (1974) J. Constr. Div. , vol.100 , pp. 65-77
    • Spooner, J.E.1
  • 19
    • 0027560002 scopus 로고
    • Probabilistic cost estimating with subjective correlations
    • Touran, A. (1993). Probabilistic cost estimating with subjective correlations. J. Constr. Eng. Manage., 119 (1), 58-71. 0733-9364 10.1061/(ASCE)0733-9364(1993)119:1(58) (Pubitemid 23622353)
    • (1993) Journal of Construction Engineering and Management , vol.119 , Issue.1 , pp. 58-71
    • Touran Ali1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.