1
-
-
56349132365
-
-
Transportation Research Board, Washington, D.C.
-
Anderson, S., Molenaar, K., and Schexnayder, C. (2007). Guidance for cost estimation and management for highway projects during planning, programming, and preconstruction. Transportation Research Board, Washington, D.C., 574.
-
(2007)
Guidance for Cost Estimation and Management for Highway Projects during Planning, Programming, and Preconstruction
, pp. 574
-
-
Anderson, S.1
Molenaar, K.2
Schexnayder, C.3
-
3
-
-
0033690430
-
Probabilistic monitoring of project performance using SS-curves
-
0733-9364 10.1061/(ASCE)0733-9364(2000)126:2(142)
-
Barraza, G. A., Back, W. E., and Mata, F. (2000). Probabilistic monitoring of project performance using SS-curves. J. Constr. Eng. Manage., 126 (2), 142-148. 0733-9364 10.1061/(ASCE)0733-9364(2000)126:2(142)
-
(2000)
J. Constr. Eng. Manage.
, vol.126
, Issue.2
, pp. 142-148
-
-
Barraza, G.A.1
Back, W.E.2
Mata, F.3
-
4
-
-
13944254406
-
Probabilistic forecasting of project performance using stochastic S curves
-
DOI 10.1061/(ASCE)0733-9364(2004)130:1(25)
-
Barraza, G. A., Back, W. E., and Mata, F. (2004). Probabilistic forecasting of project performance using stochastic S curves. J. Constr. Eng. Manage., 130 (1), 25-32. 0733-9364 10.1061/(ASCE)0733-9364(2004)130:1(25) (Pubitemid 40265402)
-
(2004)
Journal of Construction Engineering and Management
, vol.130
, Issue.1
, pp. 25-32
-
-
Barraza, G.A.1
Back, W.E.2
Mata, F.3
-
5
-
-
0014629731
-
The combination of forecasts
-
0160-5682, 10.1057/jors.1969.103
-
Bates, J. M., and Granger, C. W. J. (1969). The combination of forecasts. Oper. Res. Q. 0160-5682, 20 (4), 451-468. 10.1057/jors.1969.103
-
(1969)
Oper. Res. Q.
, vol.20
, Issue.4
, pp. 451-468
-
-
Bates, J.M.1
Granger, C.W.J.2
-
6
-
-
0024621566
-
Range estimating: Measuring uncertainty and reasoning with risk
-
0274-9696
-
Curran, M. W. (1989). Range estimating: Measuring uncertainty and reasoning with risk. Cost Eng. 0274-9696, 31 (3), 18-26.
-
(1989)
Cost Eng.
, vol.31
, Issue.3
, pp. 18-26
-
-
Curran, M.W.1
-
7
-
-
0020825299
-
Probabilistic estimating: Mathematics and applications
-
0733-9364 10.1061/(ASCE)0733-9364(1983)109:3(297)
-
Diekmann, J. E. (1983). Probabilistic estimating: Mathematics and applications. J. Constr. Eng. Manage., 109 (3), 297-308. 0733-9364 10.1061/(ASCE)0733-9364(1983)109:3(297)
-
(1983)
J. Constr. Eng. Manage.
, vol.109
, Issue.3
, pp. 297-308
-
-
Diekmann, J.E.1
-
8
-
-
42949140480
-
From Nobel prize to project management: Getting risks right
-
1938-9507
-
Flyvbjerg, B. (2006). From Nobel prize to project management: Getting risks right. Proj. Manage. J., 37 (3), 5-15. 1938-9507
-
(2006)
Proj. Manage. J.
, vol.37
, Issue.3
, pp. 5-15
-
-
Flyvbjerg, B.1
-
9
-
-
0004012196
-
-
2nd ed., Chapman & Hall/CRC, Boca Raton, FL
-
Gelman, A., Carlin, J. B., Stern, H. S., and Rubin, D. B. (2003). Bayesian data analysis, 2nd ed., Chapman & Hall/CRC, Boca Raton, FL.
-
(2003)
Bayesian Data Analysis
-
-
Gelman, A.1
Carlin, J.B.2
Stern, H.S.3
Rubin, D.B.4
-
10
-
-
0001259111
-
Bayesian model averaging: A tutorial
-
0883-4237 10.1214/ss/1009212519
-
Hoeting, J. A., Madigan, D., Raftery, A. E., and Volinsky, C. T. (1999). Bayesian model averaging: A tutorial. Stat. Sci., 14 (4), 382-401. 0883-4237 10.1214/ss/1009212519
-
(1999)
Stat. Sci.
, vol.14
, Issue.4
, pp. 382-401
-
-
Hoeting, J.A.1
Madigan, D.2
Raftery, A.E.3
Volinsky, C.T.4
-
12
-
-
60449092091
-
Probabilistic forecasting of project duration using Bayesian inference and the beta distribution
-
0733-9364 10.1061/(ASCE)0733-9364(2009)135:3(178)
-
Kim, B. C., and Reinschmidt, K. F. (2009). Probabilistic forecasting of project duration using Bayesian inference and the beta distribution. J. Constr. Eng. Manage., 135 (3), 178-186. 0733-9364 10.1061/(ASCE)0733-9364(2009)135: 3(178)
-
(2009)
J. Constr. Eng. Manage.
, vol.135
, Issue.3
, pp. 178-186
-
-
Kim, B.C.1
Reinschmidt, K.F.2
-
13
-
-
1642277111
-
Delusions of success
-
0017-8012
-
Lovallo, D., and Kahneman, D. (2003). Delusions of success. Harv. Bus. Rev., 81 (7), 56-63. 0017-8012
-
(2003)
Harv. Bus. Rev.
, vol.81
, Issue.7
, pp. 56-63
-
-
Lovallo, D.1
Kahneman, D.2
-
14
-
-
0004099175
-
-
R-2569-DOE, RAND, Santa Monica, CA
-
Merrow, E. W., Phillips, K. E., and Myers, C. W. (1981). Understanding cost growth and performance shortfalls in pioneer process plants. R-2569-DOE, RAND, Santa Monica, CA
-
(1981)
Understanding Cost Growth and Performance Shortfalls in Pioneer Process Plants
-
-
Merrow, E.W.1
Phillips, K.E.2
Myers, C.W.3
-
15
-
-
14544291098
-
Programmatic cost risk analysis for highway megaprojects
-
DOI 10.1061/(ASCE)0733-9364(2005)131:3(343)
-
Molenaar, K. R. (2005). Programmatic cost risk analysis for highway megaprojects. J. Constr. Eng. Manage., 131 (3), 343-353. 0733-9364 10.1061/(ASCE)0733-9364(2005)131:3(343) (Pubitemid 40303942)
-
(2005)
Journal of Construction Engineering and Management
, vol.131
, Issue.3
, pp. 343-353
-
-
Molenaar, K.R.1
-
16
-
-
0035335579
-
Predicting accuracy of early cost estimates based on estimate quality
-
DOI 10.1061/(ASCE)0733-9364(2001)127:3(173), Reportnr 22225
-
Oberlender, G. D., and Trost, S. M. (2001). Predicting accuracy of early cost estimates based on estimate quality. J. Constr. Eng. Manage., 127 (3), 173-182. 0733-9364 10.1061/(ASCE)0733-9364(2001)127:3(173) (Pubitemid 32508535)
-
(2001)
Journal of Construction Engineering and Management
, vol.127
, Issue.3
, pp. 173-182
-
-
Oberlender, G.D.1
Trost, S.M.2
-
17
-
-
58049139009
-
-
Project Management Institute (PMI). 4th ed., PMI, Newtown Square, PA
-
Project Management Institute (PMI). (2008). A guide to the project management body of knowledge, 4th ed., PMI, Newtown Square, PA.
-
(2008)
A Guide to the Project Management Body of Knowledge
-
-
-
18
-
-
0016036092
-
Probabilistic estimating
-
0569-7948
-
Spooner, J. E. (1974). Probabilistic estimating. J. Constr. Div. 0569-7948, 100, 65-77.
-
(1974)
J. Constr. Div.
, vol.100
, pp. 65-77
-
-
Spooner, J.E.1
-
19
-
-
0027560002
-
Probabilistic cost estimating with subjective correlations
-
Touran, A. (1993). Probabilistic cost estimating with subjective correlations. J. Constr. Eng. Manage., 119 (1), 58-71. 0733-9364 10.1061/(ASCE)0733-9364(1993)119:1(58) (Pubitemid 23622353)
-
(1993)
Journal of Construction Engineering and Management
, vol.119
, Issue.1
, pp. 58-71
-
-
Touran Ali1
|