메뉴 건너뛰기




Volumn 137, Issue 11, 2011, Pages 1003-1014

Model for efficient risk allocation in privately financed public infrastructure projects using neuro-fuzzy techniques

Author keywords

Artificial neural networks; Fuzzy logic; Organizational capability; Public private partnership (PPP); Risk allocation; Transaction cost economics

Indexed keywords

ADAPTIVE NEURO-FUZZY INFERENCE SYSTEM; ARTIFICIAL NEURAL NETWORK; BODY OF KNOWLEDGE; BUSINESS ENVIRONMENTS; DECISION MAKING PROCESS; FUZZY INFERENCE SYSTEMS; MULTIPLE LINEAR REGRESSION MODELS; NEURO-FUZZY MODEL; NEURO-FUZZY TECHNIQUES; ORGANIZATIONAL CAPABILITY; PROJECT PERFORMANCE; PUBLIC INFRASTRUCTURE PROJECT; PUBLIC PRIVATE PARTNERSHIPS; REAL PROJECTS; RISK ALLOCATION; THEORETICAL FRAMEWORK; TRANSACTION COST ECONOMICS;

EID: 83755183674     PISSN: 07339364     EISSN: None     Source Type: Journal    
DOI: 10.1061/(ASCE)CO.1943-7862.0000365     Document Type: Article
Times cited : (56)

References (66)
  • 1
    • 33749754615 scopus 로고
    • A new learning algorithm for blind signal separation
    • (a) D. S. Touretzky, M. C. Mozer, and M. E. Hasselmo, eds., Vol., Morgan-Kaufmann, Burlington, MA
    • Amari, S., Cichocki, A., and Yang, H. H. (1995 a) A new learning algorithm for blind signal separation. Proc., Advances in Neural Information Processing Systems 1995 Conf., D. S. Touretzky, M. C. Mozer, and, M. E. Hasselmo, eds., Vol. 8, Morgan-Kaufmann, Burlington, MA, 757-763.
    • (1995) Proc., Advances in Neural Information Processing Systems 1995 Conf. , vol.8 , pp. 757-763
    • Amari, S.1    Cichocki, A.2    Yang, H.H.3
  • 2
    • 0001504093 scopus 로고
    • Statistical theory of overtraining-Is cross-validation asymptotically effective?
    • (b) D. S. Touretzky, M. C. Mozer, and M. E. Hasselmo, eds., Vol., Morgan-Kaufmann, Burlington, MA
    • Amari, S., Murata, N., Muller, K. R., Finke, M., and Yang, H. (1995 b) Statistical theory of overtraining-Is cross-validation asymptotically effective? Proc., Advances in Neural Information Processing Systems 1995 Conf., D. S. Touretzky, M. C. Mozer, and, M. E. Hasselmo, eds., Vol. 8, Morgan-Kaufmann, Burlington, MA, 176-182.
    • (1995) Proc., Advances in Neural Information Processing Systems 1995 Conf. , vol.8 , pp. 176-182
    • Amari, S.1    Murata, N.2    Muller, K.R.3    Finke, M.4    Yang, H.5
  • 3
    • 47349109675 scopus 로고    scopus 로고
    • Optimum risk transfer in build-own-operate-transfer projects: The challenge for governments
    • Arndt, R. (1999). Optimum risk transfer in build-own-operate-transfer projects: The challenge for governments. Trans. Multi-Discip. Eng., Aus., GE 22, 1-8.
    • (1999) Trans. Multi-Discip. Eng., Aus. , vol.22 , pp. 1-8
    • Arndt, R.1
  • 4
    • 0001898803 scopus 로고
    • The organization of economic activity: Issues pertinent to the choice of market versus nonmarket allocation
    • U.S. Government Printing Office, Washington, DC
    • Arrow, K. J. (1969). The organization of economic activity: Issues pertinent to the choice of market versus nonmarket allocation. Proceedings of the analysis and evaluation of public expenditure: The PPB system, Vol. 1, U.S. Government Printing Office, Washington, DC, 59-73.
    • (1969) Proceedings of the Analysis and Evaluation of Public Expenditure: The PPB System , vol.1 , pp. 59-73
    • Arrow, K.J.1
  • 5
    • 13944265044 scopus 로고    scopus 로고
    • Predicting cost deviation in reconstruction projects: Artificial neural networks versus regression
    • DOI 10.1061/(ASCE)0733-9364(2003)129:4(405)
    • Attalla, M., and Hegazy, T. (2003). Predicting cost deviation in reconstruction projects: Artificial neural networks versus regression. J. Constr. Eng. Manage., 129 (4), 405-411. 0733-9364 10.1061/(ASCE)0733-9364(2003) 129:4(405) (Pubitemid 40265454)
    • (2003) Journal of Construction Engineering and Management , vol.129 , Issue.4 , pp. 405-411
    • Attalla, M.1    Hegazy, T.2
  • 6
    • 33749832898 scopus 로고    scopus 로고
    • A knowledge transfer framework: The PFI context
    • DOI 10.1080/01446190600799224, PII QU26K154866V1218
    • Carrillo, P. M., Robinson, H. S., Anumba, C. J., and Bouchlaghem, N. M. (2006). A knowledge transfer framework: The PFI context. Constr. Manage. Econ., 24 (10), 1045-1056. 0887-3801 10.1061/(ASCE)0887-3801(1994)8:2(234) (Pubitemid 44560656)
    • (2006) Construction Management and Economics , vol.24 , Issue.10 , pp. 1045-1056
    • Carrillo, P.M.1    Robinson, H.S.2    Anumba, C.J.3    Bouchlaghem, N.M.4
  • 7
    • 0029273779 scopus 로고
    • Neural network method of estimating construction technology acceptability
    • 0733-9364 10.1061/(ASCE)0733-9364(1995)121:1(130)
    • Chao, L. C., and Skibniewski, M. J. (1995). Neural network method of estimating construction technology acceptability. J. Constr. Eng. Manage., 121 (1), 130-142. 0733-9364 10.1061/(ASCE)0733-9364(1995)121:1(130)
    • (1995) J. Constr. Eng. Manage. , vol.121 , Issue.1 , pp. 130-142
    • Chao, L.C.1    Skibniewski, M.J.2
  • 9
    • 0026435750 scopus 로고
    • Assessment of the potential application of fuzzy set theory to accident progression event trees with phenomenological uncertainties
    • 0951-8320 10.1016/0951-8320(92)90130-D
    • Chun, M., and Ahn, K. (1992). Assessment of the potential application of fuzzy set theory to accident progression event trees with phenomenological uncertainties. Reliab. Eng. Syst. Saf., 37 (3), 237-252. 0951-8320 10.1016/0951-8320(92)90130-D
    • (1992) Reliab. Eng. Syst. Saf. , vol.37 , Issue.3 , pp. 237-252
    • Chun, M.1    Ahn, K.2
  • 11
    • 0036744325 scopus 로고    scopus 로고
    • Data modeling and the application of a neural network approach to the prediction of total construction costs
    • 0144-6193 10.1080/014461900370834
    • Emsley, M. W., Lowe, D. J., Duff, A. R., Harding, A., and Hickson, A. (2002). Data modeling and the application of a neural network approach to the prediction of total construction costs. Constr. Manage. Econ., 20 (6), 465-472. 0144-6193 10.1080/014461900370834
    • (2002) Constr. Manage. Econ. , vol.20 , Issue.6 , pp. 465-472
    • Emsley, M.W.1    Lowe, D.J.2    Duff, A.R.3    Harding, A.4    Hickson, A.5
  • 13
    • 22844438974 scopus 로고    scopus 로고
    • Judgment-based cross-impact method for predicting cost variance for highly uncertain projects
    • DOI 10.1142/S1609945104000139
    • Han, S. H., and Diekmann, J. (2004). Judgment-based cross-impact method for predicting cost variance for highly uncertain projects. J. Constr. Res., 5 (2), 171-192. 0143-2095 10.1002/smj.332 (Pubitemid 41036906)
    • (2004) Journal of Construction Research , vol.5 , Issue.2 , pp. 171-192
    • Han, S.H.1    Diekmann, J.2
  • 15
    • 0026923902 scopus 로고
    • On fuzzy modeling using fuzzy neural networks with the back-propagation algorithm
    • DOI 10.1109/72.159069
    • Horikawa, S., Furuhashi, T., and Uchikawa, Y. (1992). On fuzzy modelling using fuzzy neural networks with the back-propagation algorithm. IEEE Trans. Neural Netw., 3 (5), 801-806. 1045-9227 10.1109/72.159069 (Pubitemid 23555772)
    • (1992) IEEE Transactions on Neural Networks , vol.3 , Issue.5 , pp. 801-806
    • Horikawa Shin-ichi1    Furuhashi Takeshi2    Uchikawa Yoshiki3
  • 16
    • 0042519115 scopus 로고
    • Building a neuro-fuzzy learning control system
    • Hung, C.-C. (1993). Building a neuro-fuzzy learning control system. AI Expert, 8 (11), 40-49.
    • (1993) AI Expert , vol.8 , Issue.11 , pp. 40-49
    • Hung, C.-C.1
  • 17
    • 22944467228 scopus 로고    scopus 로고
    • Losing sight of the forest for the trees? Productive capabilities and gains from trade as drivers of vertical scope
    • DOI 10.1002/smj.501
    • Jacobides, M. G., and Hitt, L. M. (2005). Losing sight of the forest for the trees? Productive capabilities and gains from trade as drivers of vertical scope. Strategic Manage. J., 26 (13), 1209-1227. 0143-2095 10.1002/smj.501 (Pubitemid 41655078)
    • (2005) Strategic Management Journal , vol.26 , Issue.13 , pp. 1209-1227
    • Jacobides, M.G.1    Hitt, L.M.2
  • 18
    • 0027601884 scopus 로고
    • ANFIS: Adaptive-network-based fuzzy inference system
    • 0018-9472 10.1109/21.256541
    • Jang, J.-S. R. (1993). ANFIS: Adaptive-network-based fuzzy inference system. IEEE Trans. Syst. Man Cybern., 23 (3), 665-685. 0018-9472 10.1109/21.256541
    • (1993) IEEE Trans. Syst. Man Cybern. , vol.23 , Issue.3 , pp. 665-685
    • Jang, J.-S.R.1
  • 19
    • 0029273384 scopus 로고
    • Neuro-fuzzy modeling and control
    • 0018-9219 10.1109/5.364486
    • Jang, J.-S. R., and Sun, C.-T. (1995). Neuro-fuzzy modeling and control. Proc. IEEE, 83 (3), 378-406. 0018-9219 10.1109/5.364486
    • (1995) Proc. IEEE , vol.83 , Issue.3 , pp. 378-406
    • Jang, J.-S.R.1    Sun, C.-T.2
  • 20
    • 75649118623 scopus 로고    scopus 로고
    • Determinants of efficient risk allocation in privately financed public infrastructure projects in Australia
    • (a) 0733-9364 10.1061/(ASCE)CO.1943-7862.0000118
    • Jin, X.-H. (2010 a) Determinants of efficient risk allocation in privately financed public infrastructure projects in Australia. J. Constr. Eng. Manage., 136 (2), 138-150. 0733-9364 10.1061/(ASCE)CO.1943-7862.0000118
    • (2010) J. Constr. Eng. Manage. , vol.136 , Issue.2 , pp. 138-150
    • Jin, X.-H.1
  • 21
    • 77958130228 scopus 로고    scopus 로고
    • Neuro-fuzzy decision support system for efficient risk allocation in public-private partnership infrastructure projects
    • (b) 0887-3801 10.1061/(ASCE)CP.1943-5487.0000058
    • Jin, X.-H. (2010 b) Neuro-fuzzy decision support system for efficient risk allocation in public-private partnership infrastructure projects. J. Comput. Civ. Eng., 24 (6), 525-538. 0887-3801 10.1061/(ASCE)CP.1943-5487.0000058
    • (2010) J. Comput. Civ. Eng. , vol.24 , Issue.6 , pp. 525-538
    • Jin, X.-H.1
  • 22
    • 47349117775 scopus 로고    scopus 로고
    • Interpreting risk allocation mechanism in public-private partnership projects: An empirical study in a transaction cost economics perspective
    • DOI 10.1080/01446190801998682, PII 792751092
    • Jin, X.-H., and Doloi, H. (2008). Interpreting risk allocation mechanism in public-private partnership projects: An empirical study in a transaction cost economics perspective. Constr. Manage. Econ., 26 (7), 707-721. 1093-9687 10.1111/j.1467-8667.2009.00609.x (Pubitemid 351998527)
    • (2008) Construction Management and Economics , vol.26 , Issue.7 , pp. 707-721
    • Jin, X.-H.1    Doloi, H.2
  • 23
    • 0024073399 scopus 로고
    • Construction risk management
    • 0263-0257 10.1080/02630258808970516
    • Kangari, R. (1988). Construction risk management. Civ. Eng. Sys., 5 (3), 114-120. 0263-0257 10.1080/02630258808970516
    • (1988) Civ. Eng. Sys. , vol.5 , Issue.3 , pp. 114-120
    • Kangari, R.1
  • 24
    • 34250836481 scopus 로고
    • Construction risk assessment by linguistics
    • 0018-9391 10.1109/17.18829
    • Kangari, R., and Riggs, L. S. (1989). Construction risk assessment by linguistics. IEEE Trans. Eng. Manage., 36 (2), 126-131. 0018-9391 10.1109/17.18829
    • (1989) IEEE Trans. Eng. Manage. , vol.36 , Issue.2 , pp. 126-131
    • Kangari, R.1    Riggs, L.S.2
  • 26
    • 0031253132 scopus 로고    scopus 로고
    • FuNN/2 - A fuzzy neural network architecture for adaptive learning and knowledge acquisition
    • DOI 10.1016/S0020-0255(97)00007-8
    • Kasabov, N., Kim, J., Watts, M., and Gray, A. (1997). FuNN/2-A fuzzy neural network architecture for adaptive learning and knowledge acquisition. Inf. Sci. (NY) 0020-0255, 101 (3), 155-175. 10.1016/S0020-0255(97)00007-8 (Pubitemid 28003829)
    • (1997) Information sciences , vol.101 , Issue.3-4 , pp. 155-175
    • Kasabov, N.K.1    Jaesoo Kim2    Watts, M.J.3    Gray, A.R.4
  • 27
    • 0032845493 scopus 로고    scopus 로고
    • HyFIS: Adaptive neuro-fuzzy inference systems and their application to nonlinear dynamical systems
    • DOI 10.1016/S0893-6080(99)00067-2, PII S0893608099000672
    • Kim, J., and Kasabov, N. (1999). HyFIS: Adaptive neuro-fuzzy inference systems and their application to nonlinear dynamical systems. Neural Netw., 12 (9), 1301-1319. 0893-6080 10.1016/S0893-6080(99)00067-2 (Pubitemid 29475159)
    • (1999) Neural Networks , vol.12 , Issue.9 , pp. 1301-1319
    • Kim, J.1    Kasabov, N.2
  • 28
    • 33750143623 scopus 로고    scopus 로고
    • Neural networks and principal component analysis for identification of building natural periods
    • DOI 10.1061/(ASCE)0887-3801(2006)20:6(431), 002606QCP
    • Kuniar, K., and Waszczyszyn, Z. (2006). Neural networks and principal component analysis for identification of building natural periods. J. Comput. Civ. Eng., 20 (6), 431-436. 0887-3801 10.1061/(ASCE)0887-3801(2006)20:6(431) (Pubitemid 44592486)
    • (2006) Journal of Computing in Civil Engineering , vol.20 , Issue.6 , pp. 431-436
    • Kuzniar, K.1    Waszczyszyn, Z.2
  • 29
    • 34248327941 scopus 로고    scopus 로고
    • Modelling risk allocation decision in construction contracts
    • DOI 10.1016/j.ijproman.2006.11.005, PII S0263786306001669
    • Lam, K. C., Wang, D., Lee, P. T. K., and Tsang, Y. T. (2007). Modelling risk allocation decision in construction contracts. Int. J. Proj. Manage., 25 (5), 485-493. 10.1016/j.ijproman.2006.11.005 (Pubitemid 46731269)
    • (2007) International Journal of Project Management , vol.25 , Issue.5 , pp. 485-493
    • Lam, K.C.1    Wang, D.2    Lee, P.T.K.3    Tsang, Y.T.4
  • 30
    • 0025404409 scopus 로고
    • Fuzzy logic in control systems: Fuzzy logic controller - Part I
    • DOI 10.1109/21.52551
    • Lee, C. C. (1990). Fuzzy logic in control systems: Fuzzy logic controller, Part I. IEEE Trans. Syst. Man Cybern., 20 (2), 404-418. 0018-9472 10.1109/21.52551 (Pubitemid 20702822)
    • (1990) IEEE Transactions on Systems, Man and Cybernetics , vol.20 , Issue.2 , pp. 404-418
    • Lee Chuen Chien1
  • 31
    • 84992969628 scopus 로고    scopus 로고
    • Neural network models for intelligent support of mark-up estimation
    • 0144-6193 10.1080/014461999371664
    • Li, H. (1996). Neural network models for intelligent support of mark-up estimation. Eng., Constr., Archit. Manage., 3 (1), 69-81. 0144-6193 10.1080/014461999371664
    • (1996) Eng., Constr., Archit. Manage. , vol.3 , Issue.1 , pp. 69-81
    • Li, H.1
  • 32
    • 33845786002 scopus 로고    scopus 로고
    • Fuzzy approach to prequalifying construction contractors
    • DOI 10.1061/(ASCE)0733-9364(2007)133:1(40)
    • Li, Y., Nie, X., and Chen, S. (2007). Fuzzy approach to prequalifying construction contractors. J. Constr. Eng. Manage., 133 (1), 40-49. 0733-9364 10.1061/(ASCE)0733-9364(2007)133:1(40) (Pubitemid 44975049)
    • (2007) Journal of Construction Engineering and Management , vol.133 , Issue.1 , pp. 40-49
    • Li, Y.1    Nie, X.2    Chen, S.3
  • 33
    • 0026366218 scopus 로고
    • Neural-networks-based fuzzy logic control and decision system
    • 0018-9340 10.1109/12.106218
    • Lin, C.-T., and Lee, C. S. G. (1991). Neural-networks-based fuzzy logic control and decision system. IEEE Trans. Comput., 40 (12), 1320-1366. 0018-9340 10.1109/12.106218
    • (1991) IEEE Trans. Comput. , vol.40 , Issue.12 , pp. 1320-1366
    • Lin, C.-T.1    Lee, C.S.G.2
  • 35
    • 15944390626 scopus 로고    scopus 로고
    • Modeling a contractor's markup estimation
    • DOI 10.1061/(ASCE)0733-9364(2005)131:4(391)
    • Liu, M., and Ling, F. Y. Y. (2005). Modeling a contractor's markup estimation. J. Constr. Eng. Manage., 131 (4), 391-399. 0733-9364 10.1061/(ASCE)0733-9364(2005)131:4(391) (Pubitemid 40430135)
    • (2005) Journal of Construction Engineering and Management , vol.131 , Issue.4 , pp. 391-399
    • Liu, M.1    Ling, Y.Y.2
  • 36
    • 9144263820 scopus 로고    scopus 로고
    • Enhancing project evaluation and review technique simulation through artificial neural network-based input modeling
    • DOI 10.1061/(ASCE)0733-9364(2002)128:5(438)
    • Lu, M. (2002). Enhancing project evaluation and review technique simulation through artificial neural network-based input modeling. J. Constr. Eng. Manage. 0733-9364, 128 (5), 438-445. 10.1061/(ASCE)0733-9364(2002)128: 5(438) (Pubitemid 40265528)
    • (2002) Journal of Construction Engineering and Management , vol.128 , Issue.5 , pp. 438-445
    • Lu, M.1
  • 38
    • 33847325783 scopus 로고    scopus 로고
    • A game theory approach for the allocation of risks in transport public private partnerships
    • DOI 10.1016/j.ijproman.2006.06.003, PII S0263786306001013
    • Medda, F. (2007). A game theory approach for the allocation of risks in transport public private partnerships. Int. J. Proj. Manage., 25 (3), 213-218. 10.1016/j.ijproman.2006.06.003 (Pubitemid 46323418)
    • (2007) International Journal of Project Management , vol.25 , Issue.3 , pp. 213-218
    • Medda, F.1
  • 39
    • 0026381932 scopus 로고
    • Neural networks as tools in construction
    • 0733-9364 10.1061/(ASCE)0733-9364(1991)117:4(606)
    • Moselhi, O., Hegazy, T., and Fazio, P. (1991). Neural networks as tools in construction. J. Constr. Eng. Manage., 117 (4), 606-625. 0733-9364 10.1061/(ASCE)0733-9364(1991)117:4(606)
    • (1991) J. Constr. Eng. Manage. , vol.117 , Issue.4 , pp. 606-625
    • Moselhi, O.1    Hegazy, T.2    Fazio, P.3
  • 40
    • 33845671757 scopus 로고    scopus 로고
    • Risk allocation in the private provision of public infrastructure
    • DOI 10.1016/j.ijproman.2006.06.005, PII S0263786306001001
    • Ng, A., and Loosemore, M. (2007). Risk allocation in the private provision of public infrastructure. Int. J. Proj. Manage., 25 (1), 66-76. (Pubitemid 44943043)
    • (2007) International Journal of Project Management , vol.25 , Issue.1 , pp. 66-76
    • Ng, A.1    Loosemore, M.2
  • 41
    • 13944255907 scopus 로고    scopus 로고
    • Fuzzy decision support system for risk analysis in e-commerce development
    • DOI 10.1016/j.dss.2003.12.002, PII S0167923604000272
    • Ngai, E. W. T., and Wat, F. K. T. (2005). Fuzzy decision support system for risk analysis in e-commerce development. Decis. Support Sys., 40 (2), 235-255. (Pubitemid 40266063)
    • (2005) Decision Support Systems , vol.40 , Issue.2 , pp. 235-255
    • Ngai, E.W.T.1    Wat, F.K.T.2
  • 45
    • 33749840757 scopus 로고    scopus 로고
    • Construction equipment productivity estimation using artificial neural network model
    • DOI 10.1080/01446190600851033, PII V6M1J41352WT4266
    • Ok, S. C., and Sinha, S. K. (2006). Construction equipment productivity estimation using artificial neural network model. Constr. Manage. Econ., 24 (10), 1029-1044. 0733-9364 10.1061/(ASCE)0733-9364(1993)119:4(743) (Pubitemid 44560655)
    • (2006) Construction Management and Economics , vol.24 , Issue.10 , pp. 1029-1044
    • Ok, S.C.1    Sinha, S.K.2
  • 47
    • 0029296388 scopus 로고
    • A fuzzy neural network for rule acquiring on fuzzy control system
    • 0165-0114 10.1016/0165-0114(94)00277-E
    • Shann, J. J., and Fu, H. C. (1995). A fuzzy neural network for rule acquiring on fuzzy control system. Fuzzy Sets Syst., 71 (3), 345-357. 0165-0114 10.1016/0165-0114(94)00277-E
    • (1995) Fuzzy Sets Syst. , vol.71 , Issue.3 , pp. 345-357
    • Shann, J.J.1    Fu, H.C.2
  • 48
    • 33748599578 scopus 로고    scopus 로고
    • Role of public private partnerships to manage risks in public sector projects in Hong Kong
    • DOI 10.1016/j.ijproman.2006.07.006, PII S0263786306000937
    • Shen, L.-Y., Platten, A., and Deng, X. P. (2006). Role of public private partnerships to manage risks in public sector projects in Hong Kong. Int. J. Proj. Manage., 24 (7), 587-594. (Pubitemid 44375562)
    • (2006) International Journal of Project Management , vol.24 , Issue.7 , pp. 587-594
    • Shen, L.-Y.1    Platten, A.2    Deng, X.P.3
  • 49
    • 0038800863 scopus 로고    scopus 로고
    • A neural network based system for predicting earthmoving production
    • 1609-9451 10.1142/S1609945104000164
    • Shi, J. J. (1999). A neural network based system for predicting earthmoving production. Constr. Manage. Econ., 17 (4), 463-471. 1609-9451 10.1142/S1609945104000164
    • (1999) Constr. Manage. Econ. , vol.17 , Issue.4 , pp. 463-471
    • Shi, J.J.1
  • 51
    • 45449126257 scopus 로고
    • Structure identification of fuzzy model
    • 0165-0114 10.1016/0165-0114(88)90113-3
    • Sugeno, M., and Kang, G. T. (1988). Structure identification of fuzzy model. Fuzzy Sets Syst., 28 (1), 15-33. 0165-0114 10.1016/0165-0114(88)90113-3
    • (1988) Fuzzy Sets Syst. , vol.28 , Issue.1 , pp. 15-33
    • Sugeno, M.1    Kang, G.T.2
  • 52
    • 0013337442 scopus 로고    scopus 로고
    • A proposal for construction project risk assessment using fuzzy logic
    • 0956-0521 10.1016/0956-0521(93)90052-X
    • Tah, J. H. M., and Carr, V. (2000). A proposal for construction project risk assessment using fuzzy logic. Constr. Manage. Econ., 18 (4), 491-500. 0956-0521 10.1016/0956-0521(93)90052-X
    • (2000) Constr. Manage. Econ. , vol.18 , Issue.4 , pp. 491-500
    • Tah, J.H.M.1    Carr, V.2
  • 53
    • 0021314119 scopus 로고
    • Derivation of fuzzy control rules from human operator's control actions
    • Takagi, T., and Sugeno, M. (1983). Derivation of fuzzy control rules from human operator's control actions. Proc., IFAC Symp. on Fuzzy Information, Knowledge Representation and Decision Analysis, Pergamon, Oxford, UK, 55-60. (Pubitemid 14633040)
    • (1984) IFAC Proceedings Series , pp. 55-60
    • Takagi, T.1    Sugeno, M.2
  • 56
    • 0041707895 scopus 로고    scopus 로고
    • Risk perception analysis of BOT road project participants in India
    • DOI 10.1080/0144619032000064127
    • Thomas, A. V., Kalidindi, S. N., and Ananthanarayanan, K. (2003). Risk perception analysis of BOT road project participants in India. Constr. Manage. Econ., 21 (4), 393-407. 0144-6193 10.1080/01446199000000026 (Pubitemid 36933354)
    • (2003) Construction Management and Economics , vol.21 , Issue.4 , pp. 393-407
    • Thomas, A.V.1    Kalidindi, S.N.2    Ananthanarayanan, K.3
  • 57
    • 0000619965 scopus 로고
    • Risks and guarantees in BOT tender
    • 0733-9364 10.1061/(ASCE)0733-9364(1995)121:2(183)
    • Tiong, R. L. K. (1995). Risks and guarantees in BOT tender. J. Constr. Eng. Manage., 121 (2), 183-188. 0733-9364 10.1061/(ASCE)0733-9364(1995)121: 2(183)
    • (1995) J. Constr. Eng. Manage. , vol.121 , Issue.2 , pp. 183-188
    • Tiong, R.L.K.1
  • 59
    • 55549095856 scopus 로고    scopus 로고
    • Victorian Department of Treasury and Finance. Melbourne, Australia
    • Victorian Department of Treasury and Finance. (2000). Partnerships Victoria, Melbourne, Australia.
    • (2000) Partnerships Victoria
  • 60
    • 0026943536 scopus 로고
    • Generating fuzzy rules by learning from examples
    • DOI 10.1109/21.199466
    • Wang, L.-X., and Mendel, J. M. (1992). Generating fuzzy rules by learning from examples. IEEE Trans. Syst. Man Cybern., 22 (6), 1414-1427. 0018-9472 10.1109/21.199466 (Pubitemid 23625904)
    • (1992) IEEE Transactions on Systems, Man and Cybernetics , vol.22 , Issue.6 , pp. 1414-1427
    • Wang Li-Xin1    Mendel Jerry, M.2
  • 63
    • 84948890856 scopus 로고
    • The construction firm and the construction project: A transaction cost approach
    • 0969-9988, 3 (4), 251-269. 10.1108/eb021034
    • Winch, G. M. (1989). The construction firm and the construction project: A transaction cost approach. Constr. Manage. Econ., 7 (4), 331-345. 0969-9988, 3 (4), 251-269. 10.1108/eb021034
    • (1989) Constr. Manage. Econ. , vol.7 , Issue.4 , pp. 331-345
    • Winch, G.M.1
  • 65
    • 0022863910 scopus 로고
    • Commonsense reasoning based on fuzzy logic
    • J. Wilson, J. Henriksen, and S. Roberts, eds., IEEE Press, Piscataway, NJ
    • Zadeh, L. A. (1986). Commonsense reasoning based on fuzzy logic. Proc., IEEE 1986 Winter Simulation Conf., J. Wilson, J. Henriksen, and, S. Roberts, eds., IEEE Press, Piscataway, NJ.
    • (1986) Proc., IEEE 1986 Winter Simulation Conf.
    • Zadeh, L.A.1
  • 66
    • 0023999614 scopus 로고
    • Fuzzy logic
    • April
    • Zadeh, L. A. (1988). Fuzzy logic. IEEE Comput., April, 83-93.
    • (1988) IEEE Comput. , pp. 83-93
    • Zadeh, L.A.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.