Volumn 24, Issue 6, 2010, Pages 525-538

Neurofuzzy decision support system for efficient risk allocation in public-private partnership infrastructure projects

Author keywords

Decision support system; Infrastructure; Neurofuzzy; Organizational capability; Public private partnership; Risk allocation; Transaction cost economics

Indexed keywords

INFRASTRUCTURE; NEURO-FUZZY; ORGANIZATIONAL CAPABILITIES; PUBLIC PRIVATE PARTNERSHIPS; RISK ALLOCATION; TRANSACTION COST ECONOMICS;

EID: 77958130228     PISSN: 08873801     EISSN: None     Source Type: Journal    
DOI: 10.1061/(ASCE)CP.1943-5487.0000058     Document Type: Article
Times cited : (57)

References (94)
  • 1
    • 0027115422 scopus 로고
    • New learning algorithm for blind separation of sources
    • Amari, S., Cichocki, A., and Yang, H. H. (1995a). " A new learning algorithm for blind signal separation.." Advances in Neural Information Processing Systems 1995 Conf., MIT Press, Cambridge, Mass., 757-763. (Pubitemid 23576600)
    • (1992) Electronics Letters , vol.28 , Issue.21 , pp. 1986-1987
    • Cichocki, A.1    Moszczynski, L.2
  • 3
    • 47349109675 scopus 로고    scopus 로고
    • Optimum risk transfer in build-own-operate-transfer projects: The challenge for governments
    • GE
    • Arndt, R. (1999). " Optimum risk transfer in build-own-operate- transfer projects: The challenge for governments.." Transactions of multi-disciplinary engineering, Australia, GE 22, 1-8.
    • (1999) Transactions of Multi-disciplinary Engineering, Australia , vol.22 , pp. 1-8
    • Arndt, R.1
  • 4
    • 13944265044 scopus 로고    scopus 로고
    • Predicting cost deviation in reconstruction projects: Artificial neural networks versus regression
    • DOI 10.1061/(ASCE)0733-9364(2003)129:4(405)
    • Attalla, M., and Hegazy, T. (2003). " Predicting cost deviation in reconstruction projects: Artificial neural networks versus regression.." J. Constr. Eng. Manage. JCEMD4 0733-9364, 129 (4), 405-411. 10.1061/(ASCE)0733- 9364(2003)129:4(405) (Pubitemid 40265454)
    • (2003) Journal of Construction Engineering and Management , vol.129 , Issue.4 , pp. 405-411
    • Attalla, M.1    Hegazy, T.2
  • 5
    • 33749832898 scopus 로고    scopus 로고
    • A knowledge transfer framework: The PFI context
    • DOI 10.1080/01446190600799224, PII QU26K154866V1218
    • Carrillo, P. M., Robinson, H. S., Anumba, C. J., and Bouchlaghem, N. M. (2006). " A knowledge transfer framework: The PFI context.." Constr. Manage. Econom. CMECF3 0144-6193, 24 (10), 1045-1056. 10.1080/01446190600799224 (Pubitemid 44560656)
    • (2006) Construction Management and Economics , vol.24 , Issue.10 , pp. 1045-1056
    • Carrillo, P.M.1    Robinson, H.S.2    Anumba, C.J.3    Bouchlaghem, N.M.4
  • 6
    • 0035151193 scopus 로고    scopus 로고
    • Neuro-fuzzy approaches for sanitary sewer pipeline condition assessment
    • DOI 10.1061/(ASCE)0887-3801(2001)15:1(4)
    • Chae, M. J., and Abraham, D. M. (2001). " Neuro-fuzzy approaches for sanitary sewer pipeline condition assessment.." J. Comput. Civ. Eng. JCCEE5 0887-3801, 15 (1), 4-14. 10.1061/(ASCE)0887-3801(2001)15:1(4) (Pubitemid 32083760)
    • (2001) Journal of Computing in Civil Engineering , vol.15 , Issue.1 , pp. 4-14
    • Chae, M.J.1    Abraham, D.M.2
  • 7
    • 0028417085 scopus 로고
    • Estimating construction productivity: Neural-network-based approach
    • JCCEE5 0887-3801, (),. 10.1061/(ASCE)0887-3801(1994)8:2(234)
    • Chao, L. C., and Skibniewski, M. J. (1994). " Estimating construction productivity: Neural-network-based approach.." J. Comput. Civ. Eng. JCCEE5 0887-3801, 8 (2), 234-251. 10.1061/(ASCE)0887-3801(1994)8:2(234)
    • (1994) J. Comput. Civ. Eng. , vol.8 , Issue.2 , pp. 234-251
    • Chao, L.C.1    Skibniewski, M.J.2
  • 8
    • 0029273779 scopus 로고
    • Neural network method of estimating construction technology acceptability
    • JCEMD4 0733-9364, (),. 10.1061/(ASCE)0733-9364(1995)121:1(130)
    • Chao, L. C., and Skibniewski, M. J. (1995). " Neural network method of estimating construction technology acceptability.." J. Constr. Eng. Manage. JCEMD4 0733-9364, 121 (1), 130-142. 10.1061/(ASCE)0733-9364(1995)121: 1(130)
    • (1995) J. Constr. Eng. Manage. , vol.121 , Issue.1 , pp. 130-142
    • Chao, L.C.1    Skibniewski, M.J.2
  • 11
    • 45749083395 scopus 로고    scopus 로고
    • Evolutionary fuzzy neural inference system for decision making in geotechnical engineering
    • " JCCEE5 0887-3801, (),. 10.1061/(ASCE)0887-3801(2008)22:4(272)
    • Cheng, M. -Y., Tsai, H. -C., Ko, C. -H., and Chang, W. -T. (2008). " Evolutionary fuzzy neural inference system for decision making in geotechnical engineering.." J. Comput. Civ. Eng. JCCEE5 0887-3801, 22 (4), 272-280. 10.1061/(ASCE)0887-3801(2008)22:4(272)
    • (2008) J. Comput. Civ. Eng. , vol.22 , Issue.4 , pp. 272-280
    • Cheng, M.-Y.1    Tsai, H.-C.2    Ko, C.-H.3    Chang, W.-T.4
  • 12
    • 16444375325 scopus 로고    scopus 로고
    • Optimum bid markup calculation using neurofuzzy systems and multidimensional risk analysis algorithm
    • DOI 10.1061/(ASCE)0887-3801(2004)18:4(322)
    • Christodoulou, S. (2004). " Optimum bid markup calculation using neurofuzzy systems and multidimensional risk analysis algorithm.." J. Comput. Civ. Eng. JCCEE5 0887-3801, 18 (4), 322-330. 10.1061/(ASCE)0887- 3801(2004)18:4(322) (Pubitemid 40475406)
    • (2004) Journal of Computing in Civil Engineering , vol.18 , Issue.4 , pp. 322-330
    • Christodoulou, S.1
  • 13
    • 5244317236 scopus 로고    scopus 로고
    • Model for construction budget performance - Neural network approach
    • Chua, D. K. H., Kog, Y. C., Loh, P. K., and Jaselskis, E. J. (1997). " Model for construction budget performance-Neural network approach.." J. Constr. Eng. Manage. JCEMD4 0733-9364, 123 (3), 214-222. 10.1061/(ASCE)0733-9364(1997)123:3(214) (Pubitemid 127590559)
    • (1997) Journal of Construction Engineering and Management , vol.123 , Issue.3 , pp. 214-222
    • Chua, D.K.H.1    Kog, Y.C.2    Loh, P.K.3    Jaselskis, E.J.4
  • 14
    • 0026435750 scopus 로고
    • Assessment of the potential application of fuzzy set theory to accident progression event trees with phenomenological uncertainties
    • RESSEP 0951-8320, (),. 10.1016/0951-8320(92)90130-D
    • Chun, M., and Ahn, K. (1992). " Assessment of the potential application of fuzzy set theory to accident progression event trees with phenomenological uncertainties.." Reliab. Eng. Syst. Saf. RESSEP 0951-8320, 37 (3), 237-252. 10.1016/0951-8320(92)90130-D
    • (1992) Reliab. Eng. Syst. Saf. , vol.37 , Issue.3 , pp. 237-252
    • Chun, M.1    Ahn, K.2
  • 17
    • 2042453281 scopus 로고
    • Two-tier versus three-tier apps
    • Dickman, A. (1995). " Two-tier versus three-tier apps.." Information Week, 553, 74-77.
    • (1995) Information Week , vol.553 , pp. 74-77
    • Dickman, A.1
  • 18
    • 55549095856 scopus 로고    scopus 로고
    • DTF.., Victorian Dept. of Treasury and Finance (DTF), Melbourne, Australia
    • DTF. (2000). Partnerships Victoria, Victorian Dept. of Treasury and Finance (DTF), Melbourne, Australia.
    • (2000) Partnerships Victoria
  • 19
    • 0036744325 scopus 로고    scopus 로고
    • Data modeling and the application of a neural network approach to the prediction of total construction costs
    • " CMECF3 0144-6193, (),. 10.1080/01446190210151050
    • Emsley, M. W., Lowe, D. J., Duff, A. R., Harding, A., and Hickson, A. (2002). " Data modeling and the application of a neural network approach to the prediction of total construction costs.." Constr. Manage. Econom. CMECF3 0144-6193, 20 (6), 465-472. 10.1080/01446190210151050
    • (2002) Constr. Manage. Econom. , vol.20 , Issue.6 , pp. 465-472
    • Emsley, M.W.1    Lowe, D.J.2    Duff, A.R.3    Harding, A.4    Hickson, A.5
  • 20
    • 35148901594 scopus 로고    scopus 로고
    • Public-private partnerships
    • A. Ghobadian, D. Gallear, N. O'Regan, and H. Viney, eds., Palgrave Macmillan, Houndmills, England
    • Faulkner, K. (2004). " Public-private partnerships.." Public-private partnerships: Policy and experience, A. Ghobadian, D. Gallear, N. O'Regan, and, H. Viney, eds., Palgrave Macmillan, Houndmills, England, 65-70.
    • (2004) Public-private Partnerships: Policy and Experience , pp. 65-70
    • Faulkner, K.1
  • 22
    • 0038592305 scopus 로고
    • Evaluation of expert systems: Issues and case studies
    • ", F. Hayes-Roth, D. A. Waterman and D. B. Lenat, eds. Addison-Wesley, Reading, Mass.
    • Gasching, J., Klahr, P., Pople, H., Shortliffe, E., and Terry, A. (1983). " Evaluation of expert systems: Issues and case studies.." Building expert systems, F. Hayes-Roth, D. A. Waterman, and, D. B. Lenat, eds. Addison-Wesley, Reading, Mass., 241-280.
    • (1983) Building Expert Systems , pp. 241-280
    • Gasching, J.1    Klahr, P.2    Pople, H.3    Shortliffe, E.4    Terry, A.5
  • 23
    • 0000836083 scopus 로고    scopus 로고
    • Evaluating the performance of combining neural networks and genetic algorithms to forecast construction demand: The case of the Singapore residential sector
    • CMECF3 0144-6193, (),. 10.1080/014461900370834
    • Goh, B. -H. (2000). " Evaluating the performance of combining neural networks and genetic algorithms to forecast construction demand: The case of the Singapore residential sector.." Constr. Manage. Econom. CMECF3 0144-6193, 18 (2), 209-217. 10.1080/014461900370834
    • (2000) Constr. Manage. Econom. , vol.18 , Issue.2 , pp. 209-217
    • Goh, B.-H.1
  • 25
    • 22844438974 scopus 로고    scopus 로고
    • Judgment-based cross-impact method for predicting cost variance for highly uncertain projects
    • DOI 10.1142/S1609945104000139
    • Han, S. H., and Diekmann, J. (2004). " Judgment-based cross-impact method for predicting cost variance for highly uncertain projects.." J. Constr. Res. ZZZZZZ 1609-9451, 5 (2), 171-192. 10.1142/S1609945104000139 (Pubitemid 41036906)
    • (2004) Journal of Construction Research , vol.5 , Issue.2 , pp. 171-192
    • Han, S.H.1    Diekmann, J.2
  • 28
    • 0141569060 scopus 로고    scopus 로고
    • The dynamic resource-based view: Capability lifecycles
    • SMADJ8 0143-2095, (),. 10.1002/smj.332
    • Helfat, C. E., and Peteraf, M. A. (2003). " The dynamic resource-based view: Capability lifecycles.." Strategic Manage. J. SMADJ8 0143-2095, 24 (10), 997-1010. 10.1002/smj.332
    • (2003) Strategic Manage. J. , vol.24 , Issue.10 , pp. 997-1010
    • Helfat, C.E.1    Peteraf, M.A.2
  • 29
    • 0026923902 scopus 로고
    • On fuzzy modeling using fuzzy neural networks with the back-propagation algorithm
    • DOI 10.1109/72.159069
    • Horikawa, S., Furuhashi, T., and Uchikawa, Y. (1992). " On fuzzy modelling using fuzzy neural networks with the back-propagation algorithm.." IEEE Trans. Neural Netw. ITNNEP 1045-9227, 3 (5), 801-806. 10.1109/72.159069 (Pubitemid 23555772)
    • (1992) IEEE Transactions on Neural Networks , vol.3 , Issue.5 , pp. 801-806
    • Horikawa Shin-ichi1    Furuhashi Takeshi2    Uchikawa Yoshiki3
  • 30
    • 0042519115 scopus 로고
    • Building a neuro-fuzzy learning control system
    • AIEXEF 0888-3785
    • Hung, C. -C. (1993). " Building a neuro-fuzzy learning control system.." AI Expert AIEXEF 0888-3785, 8 (11), 40-49.
    • (1993) AI Expert , vol.8 , Issue.11 , pp. 40-49
    • Hung, C.-C.1
  • 31
    • 22944467228 scopus 로고    scopus 로고
    • Losing sight of the forest for the trees? Productive capabilities and gains from trade as drivers of vertical scope
    • DOI 10.1002/smj.501
    • Jacobides, M. G., and Hitt, L. M. (2005). " Losing sight of the forest for the trees? Productive capabilities and gains from trade as drivers of vertical scope.." Strategic Manage. J. SMADJ8 0143-2095, 26 (13), 1209-1227. 10.1002/smj.501 (Pubitemid 41655078)
    • (2005) Strategic Management Journal , vol.26 , Issue.13 , pp. 1209-1227
    • Jacobides, M.G.1    Hitt, L.M.2
  • 32
    • 0027601884 scopus 로고
    • ANFIS: Adaptive-network-based fuzzy inference system
    • ISYMAW 0018-9472, (),. 10.1109/21.256541
    • Jang, J. -S. R. (1993). " ANFIS: Adaptive-network-based fuzzy inference system.." IEEE Trans. Syst. Man Cybern. ISYMAW 0018-9472, 23 (3), 665-685. 10.1109/21.256541
    • (1993) IEEE Trans. Syst. Man Cybern. , vol.23 , Issue.3 , pp. 665-685
    • Jang, J.-S.R.1
  • 33
    • 0029273384 scopus 로고
    • Neuro-fuzzy modeling and control
    • IEEPAD 0018-9219, (),. 10.1109/5.364486
    • Jang, J. -S. R., and Sun, C. -T. (1995). " Neuro-fuzzy modeling and control.." Proc. IEEE IEEPAD 0018-9219, 83 (3), 378-406. 10.1109/5.364486
    • (1995) Proc. IEEE , vol.83 , Issue.3 , pp. 378-406
    • Jang, J.-S.R.1    Sun, C.-T.2
  • 34
    • 75649118623 scopus 로고    scopus 로고
    • Determinants of efficient risk allocation in privately financed public infrastructure projects in Australia
    • JCEMD4 0733-9364, (),. 10.1061/(ASCE)CO.1943-7862.0000118
    • Jin, X. -H. (2010). " Determinants of efficient risk allocation in privately financed public infrastructure projects in Australia.." J. Constr. Eng. Manage. JCEMD4 0733-9364, 136 (2), 138-150. 10.1061/(ASCE)CO.1943- 7862.0000118
    • (2010) J. Constr. Eng. Manage. , vol.136 , Issue.2 , pp. 138-150
    • Jin, X.-H.1
  • 35
    • 84860369549 scopus 로고    scopus 로고
    • Determining environmental uncertainty of risk management in privately financed public projects using fuzzy approach
    • Royal Institution of Chartered Surveyors, London
    • Jin, X. -H., and Doloi, H. (2008a). " Determining environmental uncertainty of risk management in privately financed public projects using fuzzy approach.." The COBRA 2008 Conf., Royal Institution of Chartered Surveyors, London.
    • (2008) The COBRA 2008 Conf.
    • Jin, X.-H.1    Doloi, H.2
  • 36
    • 47349117775 scopus 로고    scopus 로고
    • Interpreting risk allocation mechanism in public-private partnership projects: An empirical study in a transaction cost economics perspective
    • DOI 10.1080/01446190801998682, PII 792751092
    • Jin, X. -H., and Doloi, H. (2008b). " Interpreting risk allocation mechanism in public-private partnership projects: An empirical study in a transaction cost economics perspective.." Constr. Manage. Econom. CMECF3 0144-6193, 26 (7), 707-721. 10.1080/01446190801998682 (Pubitemid 351998527)
    • (2008) Construction Management and Economics , vol.26 , Issue.7 , pp. 707-721
    • Jin, X.-H.1    Doloi, H.2
  • 37
    • 69149101992 scopus 로고    scopus 로고
    • Modelling risk allocation in privately financed infrastructure projects using fuzzy logic
    • CCIEFR 1093-9687, (),. 10.1111/j.1467-8667.2009.00609.x
    • Jin, X. -H., and Doloi, H. (2009). " Modelling risk allocation in privately financed infrastructure projects using fuzzy logic.." Comput. Aided Civ. Infrastruct. Eng. CCIEFR 1093-9687, 24 (7), 509-524. 10.1111/j.1467-8667.2009.00609.x
    • (2009) Comput. Aided Civ. Infrastruct. Eng. , vol.24 , Issue.7 , pp. 509-524
    • Jin, X.-H.1    Doloi, H.2
  • 38
    • 0024073399 scopus 로고
    • Construction risk management
    • CEESFT 1028-6608,. 10.1080/02630258808970516
    • Kangari, R. (1988). " Construction risk management.." Civ. Eng. Syst. CEESFT 1028-6608, 5, 114-120. 10.1080/02630258808970516
    • (1988) Civ. Eng. Syst. , vol.5 , pp. 114-120
    • Kangari, R.1
  • 39
    • 34250836481 scopus 로고
    • Construction risk assessment by linguistics
    • IEEMA4 0018-9391, (),. 10.1109/17.18829
    • Kangari, R., and Riggs, L. S. (1989). " Construction risk assessment by linguistics.." IEEE Trans. Eng. Manage. IEEMA4 0018-9391, 36 (2), 126-131. 10.1109/17.18829
    • (1989) IEEE Trans. Eng. Manage. , vol.36 , Issue.2 , pp. 126-131
    • Kangari, R.1    Riggs, L.S.2
  • 41
    • 0031253132 scopus 로고    scopus 로고
    • FuNN/2 - a fuzzy neural network architecture for adaptive learning and knowledge acquisition
    • DOI 10.1016/S0020-0255(97)00007-8
    • Kasabov, N. K., Kim, J., Watts, M. J., and Gray, A. R. (1997). " FuNN/2-A fuzzy neural network architecture for adaptive learning and knowledge acquisition.." Inf. Sci. (N.Y.) ISIJBC 0020-0255, 101 (3-4), 155-175. 10.1016/S0020-0255(97)00007-8 (Pubitemid 28003829)
    • (1997) Information sciences , vol.101 , Issue.3-4 , pp. 155-175
    • Kasabov, N.K.1    Jaesoo Kim2    Watts, M.J.3    Gray, A.R.4
  • 42
    • 0032845493 scopus 로고    scopus 로고
    • HyFIS: Adaptive neuro-fuzzy inference systems and their application to nonlinear dynamical systems
    • DOI 10.1016/S0893-6080(99)00067-2, PII S0893608099000672
    • Kim, J., and Kasabov, N. (1999). " HyFIS: Adaptive neuro-fuzzy inference systems and their application to nonlinear dynamical systems.." Neural Networks NNETEB 0893-6080, 12 (9), 1301-1319. 10.1016/S0893-6080(99) 00067-2 (Pubitemid 29475159)
    • (1999) Neural Networks , vol.12 , Issue.9 , pp. 1301-1319
    • Kim, J.1    Kasabov, N.2
  • 43
    • 33750143623 scopus 로고    scopus 로고
    • Neural networks and principal component analysis for identification of building natural periods
    • DOI 10.1061/(ASCE)0887-3801(2006)20:6(431), 002606QCP
    • Kuniar, K., and Waszczyszyn, Z. (2006). " Neural networks and principal component analysis for identification of building natural periods.." J. Comput. Civ. Eng. JCCEE5 0887-3801, 20 (6), 431-436. 10.1061/(ASCE)0887-3801(2006)20:6(431) (Pubitemid 44592486)
    • (2006) Journal of Computing in Civil Engineering , vol.20 , Issue.6 , pp. 431-436
    • Kuzniar, K.1    Waszczyszyn, Z.2
  • 44
    • 34248327941 scopus 로고    scopus 로고
    • Modelling risk allocation decision in construction contracts
    • DOI 10.1016/j.ijproman.2006.11.005, PII S0263786306001669
    • Lam, K. C., Wang, D., Lee, P. T. K., and Tsang, Y. T. (2007). " Modelling risk allocation decision in construction contracts.." Int. J. Proj. Manage. IPMAEL 0263-7863, 25 (5), 485-493. 10.1016/j.ijproman.2006.11.005 (Pubitemid 46731269)
    • (2007) International Journal of Project Management , vol.25 , Issue.5 , pp. 485-493
    • Lam, K.C.1    Wang, D.2    Lee, P.T.K.3    Tsang, Y.T.4
  • 45
    • 0025404409 scopus 로고
    • Fuzzy logic in control systems: Fuzzy logic controller - Part I
    • DOI 10.1109/21.52551
    • Lee, C. C. (1990). " Fuzzy logic in control systems: Fuzzy logic controller, Part I.." IEEE Trans. Syst. Man Cybern. ISYMAW 0018-9472, 20 (2), 404-418. 10.1109/21.52551 (Pubitemid 20702822)
    • (1990) IEEE Transactions on Systems, Man and Cybernetics , vol.20 , Issue.2 , pp. 404-418
    • Lee Chuen Chien1
  • 46
    • 84992969628 scopus 로고    scopus 로고
    • Neural network models for intelligent support of mark-up estimation
    • ZZZZZZ 0969-9988, (),. 10.1108/eb021023
    • Li, H. (1996). " Neural network models for intelligent support of mark-up estimation.." Eng., Constr., Archit. Manage. ZZZZZZ 0969-9988, 3 (1/2), 69-81. 10.1108/eb021023
    • (1996) Eng., Constr., Archit. Manage. , vol.3 , Issue.1-2 , pp. 69-81
    • Li, H.1
  • 47
    • 12444298113 scopus 로고    scopus 로고
    • Developing a theory of construction problem solving
    • Li, H., and Love, P. E. D. (1998). " Developing a theory of construction problem solving.." Constr. Manage. Econom. CMECF3 0144-6193, 16 (6), 721-727. 10.1080/014461998372015 (Pubitemid 128651005)
    • (1998) Construction Management and Economics , vol.16 , Issue.6 , pp. 721-727
    • Li, H.1    Love, P.E.D.2
  • 48
    • 84991380457 scopus 로고    scopus 로고
    • Combining rule-based expert systems and artificial neural networks for mark-up estimation
    • CMECF3 0144-6193, (),. 10.1080/014461999371664
    • Li, H., and Love, P. E. D. (1999). " Combining rule-based expert systems and artificial neural networks for mark-up estimation.." Constr. Manage. Econom. CMECF3 0144-6193, 17 (2), 169-176. 10.1080/014461999371664
    • (1999) Constr. Manage. Econom. , vol.17 , Issue.2 , pp. 169-176
    • Li, H.1    Love, P.E.D.2
  • 49
    • 0026366218 scopus 로고
    • Neural-networks-based fuzzy logic control and decision system
    • ITCOB4 0018-9340, (),. 10.1109/12.106218
    • Lin, C. -T., and Lee, C. S. G. (1991). " Neural-networks-based fuzzy logic control and decision system.." IEEE Trans. Comput. ITCOB4 0018-9340, 40 (12), 1320-1336. 10.1109/12.106218
    • (1991) IEEE Trans. Comput. , vol.40 , Issue.12 , pp. 1320-1336
    • Lin, C.-T.1    Lee, C.S.G.2
  • 51
    • 15944390626 scopus 로고    scopus 로고
    • Modeling a contractor's markup estimation
    • DOI 10.1061/(ASCE)0733-9364(2005)131:4(391)
    • Liu, M., and Ling, F. Y. Y. (2005). " Modeling a contractor's markup estimation.." J. Constr. Eng. Manage. JCEMD4 0733-9364, 131 (4), 391-399. 10.1061/(ASCE)0733-9364(2005)131:4(391) (Pubitemid 40430135)
    • (2005) Journal of Construction Engineering and Management , vol.131 , Issue.4 , pp. 391-399
    • Liu, M.1    Ling, Y.Y.2
  • 52
    • 9144263820 scopus 로고    scopus 로고
    • Enhancing project evaluation and review technique simulation through artificial neural network-based input modeling
    • DOI 10.1061/(ASCE)0733-9364(2002)128:5(438)
    • Lu, M. (2002). " Enhancing project evaluation and review technique simulation through artificial neural network-based input modeling.." Constr. Manage. Econom. CMECF3 0144-6193, 128 (5), 438-445. (Pubitemid 40265528)
    • (2002) Journal of Construction Engineering and Management , vol.128 , Issue.5 , pp. 438-445
    • Lu, M.1
  • 53
    • 33847325783 scopus 로고    scopus 로고
    • A game theory approach for the allocation of risks in transport public private partnerships
    • DOI 10.1016/j.ijproman.2006.06.003, PII S0263786306001013
    • Medda, F. (2007). " A game theory approach for the allocation of risks in transport public private partnerships.." Int. J. Proj. Manage. IPMAEL 0263-7863, 25 (3), 213-218. 10.1016/j.ijproman.2006.06.003 (Pubitemid 46323418)
    • (2007) International Journal of Project Management , vol.25 , Issue.3 , pp. 213-218
    • Medda, F.1
  • 54
    • 0041983847 scopus 로고    scopus 로고
    • Database gateway processor risk analysis using fuzzy logic
    • 10.1108/09685229810225047 0968-5227
    • Moscato, D. R. (1998). " Database gateway processor risk analysis using fuzzy logic.." Information Management and Computer Security, 6 (3), 138-144. 10.1108/09685229810225047 0968-5227
    • (1998) Information Management and Computer Security , vol.6 , Issue.3 , pp. 138-144
    • Moscato, D.R.1
  • 55
    • 0026381932 scopus 로고
    • Neural networks as tools in construction
    • " JCEMD4 0733-9364, (),. 10.1061/(ASCE)0733-9364(1991)117:4(606)
    • Moselhi, O., Hegazy, T., and Fazio, P. (1991). " Neural networks as tools in construction.." J. Constr. Eng. Manage. JCEMD4 0733-9364, 117 (4), 606-625. 10.1061/(ASCE)0733-9364(1991)117:4(606)
    • (1991) J. Constr. Eng. Manage. , vol.117 , Issue.4 , pp. 606-625
    • Moselhi, O.1    Hegazy, T.2    Fazio, P.3
  • 57
    • 33845671757 scopus 로고    scopus 로고
    • Risk allocation in the private provision of public infrastructure
    • DOI 10.1016/j.ijproman.2006.06.005, PII S0263786306001001
    • Ng, A., and Loosemore, M. (2007). " Risk allocation in the private provision of public infrastructure.." Int. J. Proj. Manage. IPMAEL 0263-7863, 25 (1), 66-76. 10.1016/j.ijproman.2006.06.005 (Pubitemid 44943043)
    • (2007) International Journal of Project Management , vol.25 , Issue.1 , pp. 66-76
    • Ng, A.1    Loosemore, M.2
  • 58
    • 13944255907 scopus 로고    scopus 로고
    • Fuzzy decision support system for risk analysis in e-commerce development
    • DOI 10.1016/j.dss.2003.12.002, PII S0167923604000272
    • Ngai, E. W. T., and Wat, F. K. T. (2005). " Fuzzy decision support system for risk analysis in e-commerce development.." Decision Support Sys. DSSYDK 0167-9236, 40, 235-255. 10.1016/j.dss.2003.12.002 (Pubitemid 40266063)
    • (2005) Decision Support Systems , vol.40 , Issue.2 , pp. 235-255
    • Ngai, E.W.T.1    Wat, F.K.T.2
  • 60
    • 33749840757 scopus 로고    scopus 로고
    • Construction equipment productivity estimation using artificial neural network model
    • DOI 10.1080/01446190600851033, PII V6M1J41352WT4266
    • Ok, S. C., and Sinha, S. K. (2006). " Construction equipment productivity estimation using artificial neural network model.." Constr. Manage. Econom. CMECF3 0144-6193, 24 (10), 1029-1044. 10.1080/01446190600851033 (Pubitemid 44560655)
    • (2006) Construction Management and Economics , vol.24 , Issue.10 , pp. 1029-1044
    • Ok, S.C.1    Sinha, S.K.2
  • 61
    • 0027805069 scopus 로고
    • Pricing construction risk: Fuzzy set application
    • " JCEMD4 0733-9364, (),. 10.1061/(ASCE)0733-9364(1993)119:4(743)
    • Paek, J. H., Lee, Y. W., and Ock, J. H. (1993). " Pricing construction risk: Fuzzy set application.." J. Constr. Eng. Manage. JCEMD4 0733-9364, 119 (4), 743-756. 10.1061/(ASCE)0733-9364(1993)119:4(743)
    • (1993) J. Constr. Eng. Manage. , vol.119 , Issue.4 , pp. 743-756
    • Paek, J.H.1    Lee, Y.W.2    Ock, J.H.3
  • 62
    • 0029253362 scopus 로고
    • An empirical investigation into DSS structures and environments
    • DSSYDK 0167-9236,. 10.1016/0167-9236(93)E0042-C
    • Pearson, J. M., and Shim, J. P. (1995). " An empirical investigation into DSS structures and environments.." Decision Support Sys. DSSYDK 0167-9236, 13, 141-158. 10.1016/0167-9236(93)E0042-C
    • (1995) Decision Support Sys. , vol.13 , pp. 141-158
    • Pearson, J.M.1    Shim, J.P.2
  • 63
    • 77958117813 scopus 로고    scopus 로고
    • SEITA.., Southern and Eastern Integrated Transport Authority (SEITA), Melbourne, Victoria
    • SEITA. (2007). EastLink project overview, Southern and Eastern Integrated Transport Authority (SEITA), Melbourne, Victoria.
    • (2007) EastLink Project Overview
  • 64
    • 0029296388 scopus 로고
    • A fuzzy neural network for rule acquiring on fuzzy control system
    • FSSYD8 0165-0114, (),. 10.1016/0165-0114(94)00277-E
    • Shann, J. J., and Fu, H. C. (1995). " A fuzzy neural network for rule acquiring on fuzzy control system.." Fuzzy Sets Syst. FSSYD8 0165-0114, 71 (3), 345-357. 10.1016/0165-0114(94)00277-E
    • (1995) Fuzzy Sets Syst. , vol.71 , Issue.3 , pp. 345-357
    • Shann, J.J.1    Fu, H.C.2
  • 65
    • 33748599578 scopus 로고    scopus 로고
    • Role of public private partnerships to manage risks in public sector projects in Hong Kong
    • DOI 10.1016/j.ijproman.2006.07.006, PII S0263786306000937
    • Shen, L. -Y., Platten, A., and Deng, X. P. (2006). " Role of public private partnerships to manage risks in public sector projects in Hong Kong.." Int. J. Proj. Manage. IPMAEL 0263-7863, 24 (7), 587-594. 10.1016/j.ijproman.2006.07.006 (Pubitemid 44375562)
    • (2006) International Journal of Project Management , vol.24 , Issue.7 , pp. 587-594
    • Shen, L.-Y.1    Platten, A.2    Deng, X.P.3
  • 66
    • 0038800863 scopus 로고    scopus 로고
    • A neural network based system for predicting earthmoving production
    • CMECF3 0144-6193, (),. 10.1080/014461999371385
    • Shi, J. J. (1999). " A neural network based system for predicting earthmoving production.." Constr. Manage. Econom. CMECF3 0144-6193, 17 (4), 463-471. 10.1080/014461999371385
    • (1999) Constr. Manage. Econom. , vol.17 , Issue.4 , pp. 463-471
    • Shi, J.J.1
  • 67
    • 22844444459 scopus 로고    scopus 로고
    • Intelligent models for predicting levels of client satisfaction
    • DOI 10.1142/S1609945104000164
    • Soetanto, R., and Proverbs, D. G. (2004). " Intelligent models for predicting levels of client satisfaction.." J. Constr. Res. ZZZZZZ 1609-9451, 5 (2), 233-253. 10.1142/S1609945104000164 (Pubitemid 41036909)
    • (2004) Journal of Construction Research , vol.5 , Issue.2 , pp. 233-253
    • Soetanto, R.1    Proverbs, D.G.2
  • 69
    • 45449126257 scopus 로고
    • Structure identification of fuzzy model
    • FSSYD8 0165-0114,. 10.1016/0165-0114(88)90113-3
    • Sugeno, M., and Kang, G. T. (1988). " Structure identification of fuzzy model.." Fuzzy Sets Syst. FSSYD8 0165-0114, 28, 15-33. 10.1016/0165-0114(88)90113-3
    • (1988) Fuzzy Sets Syst. , vol.28 , pp. 15-33
    • Sugeno, M.1    Kang, G.T.2
  • 70
    • 0013337442 scopus 로고    scopus 로고
    • A proposal for construction project risk assessment using fuzzy logic
    • CMECF3 0144-6193, (),. 10.1080/01446190050024905
    • Tah, J. H. M., and Carr, V. (2000). " A proposal for construction project risk assessment using fuzzy logic.." Constr. Manage. Econom. CMECF3 0144-6193, 18 (4), 491-500. 10.1080/01446190050024905
    • (2000) Constr. Manage. Econom. , vol.18 , Issue.4 , pp. 491-500
    • Tah, J.H.M.1    Carr, V.2
  • 71
    • 38249003915 scopus 로고
    • Contractor project risks contingency allocation using linguistic approximation
    • " COSEEO 0956-0521, (),. 10.1016/0956-0521(93)90052-X
    • Tah, J. H. M., Thorpe, A., and McCaffer, R. (1993). " Contractor project risks contingency allocation using linguistic approximation.." Comput. Syst. Eng. COSEEO 0956-0521, 4 (2-3), 281-293. 10.1016/0956-0521(93) 90052-X
    • (1993) Comput. Syst. Eng. , vol.4 , Issue.23 , pp. 281-293
    • Tah, J.H.M.1    Thorpe, A.2    McCaffer, R.3
  • 72
    • 0021314119 scopus 로고
    • Derivation of fuzzy control rules from human operator's control actions
    • Takagi, T., and Sugeno, M. (1983). " Derivation of fuzzy control rules from human operator's control actions.." The IFAC Symp. on Fuzzy Information, Knowledge Representation and Decision Analysis, Pergamon, New York, 55-60. (Pubitemid 14633040)
    • (1984) IFAC Proceedings Series , pp. 55-60
    • Takagi, T.1    Sugeno, M.2
  • 75
    • 77958133733 scopus 로고    scopus 로고
    • The Age.., The Age, Melbourne, Australia
    • The Age. (2009). ConnectEast says EastLink traffic up, The Age, Melbourne, Australia.
    • (2009) ConnectEast Says EastLink Traffic Up
  • 77
    • 0041707895 scopus 로고    scopus 로고
    • Risk perception analysis of BOT road project participants in India
    • DOI 10.1080/0144619032000064127
    • Thomas, A. V., Kalidindi, S. N., and Ananthanarayanan, K. (2003). " Risk perception analysis of BOT road project participants in India.." Constr. Manage. Econom. CMECF3 0144-6193, 21 (4), 393-407. 10.1080/ 0144619032000064127 (Pubitemid 36933354)
    • (2003) Construction Management and Economics , vol.21 , Issue.4 , pp. 393-407
    • Thomas, A.V.1    Kalidindi, S.N.2    Ananthanarayanan, K.3
  • 79
    • 0000592836 scopus 로고
    • BOT projects: Risks and securities
    • CMECF3 0144-6193
    • Tiong, R. L. K. (1990). " BOT projects: Risks and securities.." Constr. Manage. Econom. CMECF3 0144-6193, 8 (3), 315-328.
    • (1990) Constr. Manage. Econom. , vol.8 , Issue.3 , pp. 315-328
    • Tiong, R.L.K.1
  • 80
    • 0000619965 scopus 로고
    • Risks and guarantees in BOT tender
    • JCEMD4 0733-9364, (),. 10.1061/(ASCE)0733-9364(1995)121:2(183)
    • Tiong, R. L. K. (1995). " Risks and guarantees in BOT tender.." J. Constr. Eng. Manage. JCEMD4 0733-9364, 121 (2), 183-188. 10.1061/(ASCE)0733-9364(1995)121:2(183)
    • (1995) J. Constr. Eng. Manage. , vol.121 , Issue.2 , pp. 183-188
    • Tiong, R.L.K.1
  • 83
    • 77958131628 scopus 로고    scopus 로고
    • VIC DOI.., Victorian Dept. of Infrastructure, Melbourne, Victoria
    • VIC DOI. (2004). Concession deed: Mitcham-Frankston freeway, Victorian Dept. of Infrastructure, Melbourne, Victoria.
    • (2004) Concession Deed: Mitcham-Frankston Freeway
  • 84
    • 0026943536 scopus 로고
    • Generating fuzzy rules by learning from examples
    • DOI 10.1109/21.199466
    • Wang, L. -X., and Mendel, J. M. (1992). " Generating fuzzy rules by learning from examples.." IEEE Trans. Syst. Man Cybern. ISYMAW 0018-9472, 22 (6), 1414-1427. 10.1109/21.199466 (Pubitemid 23625904)
    • (1992) IEEE Transactions on Systems, Man and Cybernetics , vol.22 , Issue.6 , pp. 1414-1427
    • Wang Li-Xin1    Mendel Jerry, M.2
  • 87
    • 84992974053 scopus 로고    scopus 로고
    • Risk interdependencies and natural language computations
    • " ZZZZZZ 0969-9988, (),. 10.1108/eb021034
    • Wirba, E. N., Tah, J. H. M., and Howes, R. (1996). " Risk interdependencies and natural language computations.." Eng., Constr., Archit. Manage. ZZZZZZ 0969-9988, 3 (4), 251-269. 10.1108/eb021034
    • (1996) Eng., Constr., Archit. Manage. , vol.3 , Issue.4 , pp. 251-269
    • Wirba, E.N.1    Tah, J.H.M.2    Howes, R.3
  • 88
    • 0000383867 scopus 로고
    • Use of sensitivity analysis in build-own-operate-transfer project evaluation
    • 10.1016/0263-7863(95)00016-J
    • Woodward, D. G. (1995). " Use of sensitivity analysis in build-own-operate-transfer project evaluation.." Journal of Project Management, 13 (4), 239-246. 10.1016/0263-7863(95)00016-J
    • (1995) Journal of Project Management , vol.13 , Issue.4 , pp. 239-246
    • Woodward, D.G.1
  • 89
    • 73349088118 scopus 로고    scopus 로고
    • Integrating neurofuzzy system with conceptual cost estimation to discover cost-related knowledge from residential construction projects
    • JCCEE5 0887-3801, (),. 10.1061/(ASCE)0887-3801(2010)24:1(35)
    • Yu, W. -d., and Skibniewski, M. J. (2010). " Integrating neurofuzzy system with conceptual cost estimation to discover cost-related knowledge from residential construction projects.." J. Comput. Civ. Eng. JCCEE5 0887-3801, 24 (1), 35-44. 10.1061/(ASCE)0887-3801(2010)24:1(35)
    • (2010) J. Comput. Civ. Eng. , vol.24 , Issue.1 , pp. 35-44
    • Yu, W.-D.1    Skibniewski, M.J.2
  • 90
    • 34547898840 scopus 로고    scopus 로고
    • Hybrid soft computing approach for mining of complex construction databases
    • DOI 10.1061/(ASCE)0887-3801(2007)21:5(343)
    • Yu, W. -D. (2007). " Hybrid soft computing approach for mining of complex construction databases.." J. Comput. Civ. Eng. JCCEE5 0887-3801, 21 (5), 343-352. 10.1061/(ASCE)0887-3801(2007)21:5(343) (Pubitemid 47258909)
    • (2007) Journal of Computing in Civil Engineering , vol.21 , Issue.5 , pp. 343-352
    • Yu, W.-D.1
  • 91
    • 0032625628 scopus 로고    scopus 로고
    • Quantitative constructability analysis with a neuro-fuzzy knowledge-based multi-criterion decision support system
    • AUCOES 0926-5805, (),. 10.1016/S0926-5805(98)00105-8
    • Yu, W. -D., and Skibniewski, M. J. (1999). " Quantitative constructability analysis with a neuro-fuzzy knowledge-based multi-criterion decision support system.." Autom. Constr. AUCOES 0926-5805, 8 (5), 553-565. 10.1016/S0926-5805(98)00105-8
    • (1999) Autom. Constr. , vol.8 , Issue.5 , pp. 553-565
    • Yu, W.-D.1    Skibniewski, M.J.2
  • 92
    • 0022863910 scopus 로고
    • Commonsense reasoning based on fuzzy logic
    • IEEE, Piscataway, N.J
    • Zadeh, L. A. (1986). " Commonsense reasoning based on fuzzy logic.." The IEEE 1986 Winter Simulation Conf., IEEE, Piscataway, N.J.
    • (1986) The IEEE 1986 Winter Simulation Conf.
    • Zadeh, L.A.1
  • 93
    • 0023999614 scopus 로고
    • Fuzzy logic
    • Zadeh, L. A. (1988). " Fuzzy logic.." IEEE Computer, 21, 83-93.
    • (1988) IEEE Computer , vol.21 , pp. 83-93
    • Zadeh, L.A.1
  • 94
    • 0035398038 scopus 로고    scopus 로고
    • Preliminary design system for concrete box girder bridges
    • DOI 10.1061/(ASCE)0887-3801(2001)15:3(184), Reportnr 20964
    • Zhao, Z., He, W., and Fan, S. C. (2001). " Preliminary design system for concrete box girder bridges.." J. Comput. Civ. Eng. JCCEE5 0887-3801, 15 (3), 184-192. 10.1061/(ASCE)0887-3801(2001)15:3(184) (Pubitemid 32583197)
    • (2001) Journal of Computing in Civil Engineering , vol.15 , Issue.3 , pp. 184-192
    • Zhao, Z.1    He, W.2    Fan, S.C.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.