-
4
-
-
34249040596
-
-
CAT Handbook. In Peoria IL: Caterpillar, Inc
-
CAT Handbook. (2001). In Caterpillar Performance Handbook. Peoria IL: Caterpillar, Inc.
-
(2001)
Caterpillar Performance Handbook
-
-
-
5
-
-
0028417085
-
Estimating construction productivity: Neural-network-based approach
-
Chao, L. and Skibniewski, M. J. (1994) Estimating construction productivity: Neural-network-based approach. ASCE Journal of Computing in Civil Engineering, 8(2), pp. 841-7.
-
(1994)
ASCE Journal of Computing in Civil Engineering
, vol.8
, Issue.2
, pp. 841-847
-
-
Chao, L.1
Skibniewski, M.J.2
-
7
-
-
0242314516
-
Neural network model for estimating construction productivity
-
Ersoz, H. Y. (1999) Neural network model for estimating construction productivity. ASCE Journal of Construction Engineering and Management, 125(3), pp. 211-2.
-
(1999)
ASCE Journal of Construction Engineering and Management
, vol.125
, Issue.3
, pp. 211-212
-
-
Ersoz, H.Y.1
-
9
-
-
0003664269
-
-
In 4. New York: McGraw-Hill Companies, Inc
-
Neter, J. and Kutner, M. H. and Wasserman, W. and Nachtsheim, C. J. (1996). In Applied Linear Regression Models, 4. New York: McGraw-Hill Companies, Inc.
-
(1996)
Applied Linear Regression Models
-
-
Neter, J.1
Kutner, M.H.2
Wasserman, W.3
Nachtsheim, C.J.4
-
11
-
-
0034298443
-
Estimating labor productivity using probability inference neural network
-
Lu, M. and AbouRizk, S. M. and Hermann, U. H. (2000) Estimating labor productivity using probability inference neural network. ASCE Journal of Computing in Civil Engineering, 14(4), pp. 241-8.
-
(2000)
ASCE Journal of Computing in Civil Engineering
, vol.14
, Issue.4
, pp. 241-248
-
-
Lu, M.1
AbouRizk, S.M.2
Hermann, U.H.3
-
14
-
-
0004176045
-
-
In 6. New York: McGraw-Hill Companies, Inc
-
Peurifoy, R. L. and Schexnayder, C. J. (2002). In Construction Planning, Equipment, and Methods, 6. New York: McGraw-Hill Companies, Inc.
-
(2002)
Construction Planning, Equipment, and Methods
-
-
Peurifoy, R.L.1
Schexnayder, C.J.2
-
18
-
-
13944252889
-
Adaptive probabilistic neural network-based crane type selection system
-
Sawhney, A. and Mund, A. (2002) Adaptive probabilistic neural network-based crane type selection system. ASCE Journal of Construction Engineering and Management, 128(3), pp. 265-73.
-
(2002)
ASCE Journal of Construction Engineering and Management
, vol.128
, Issue.3
, pp. 265-273
-
-
Sawhney, A.1
Mund, A.2
-
19
-
-
0031257406
-
State of art in automation of earthmoving
-
Singh, S. (1997) State of art in automation of earthmoving. Journal of Aerospace Engineering, 10(4), pp. 179-88.
-
(1997)
Journal of Aerospace Engineering
, vol.10
, Issue.4
, pp. 179-188
-
-
Singh, S.1
-
20
-
-
0033707556
-
Artificial neural network for measuring organizational effectiveness
-
Sinha, S. K. and Mckim, R. A. (2000) Artificial neural network for measuring organizational effectiveness. ASCE Journal of Computing in Civil Engineering, 14(1), pp. 9-14.
-
(2000)
ASCE Journal of Computing in Civil Engineering
, vol.14
, Issue.1
, pp. 9-14
-
-
Sinha, S.K.1
Mckim, R.A.2
-
21
-
-
0032640764
-
Earthmoving productivity estimation using linear regression techniques
-
Smith, S. D. (1999) Earthmoving productivity estimation using linear regression techniques. ASCE Journal of Construction Engineering and Management, 125(3), pp. 133-40.
-
(1999)
ASCE Journal of Construction Engineering and Management
, vol.125
, Issue.3
, pp. 133-140
-
-
Smith, S.D.1
-
22
-
-
84993026805
-
Artificial neural networks model for predicting excavator productivity
-
Tam, C. M. and Tong, T. and Tse, S. (2002) Artificial neural networks model for predicting excavator productivity. Engineering Construction and Architectural Management, 5/6, pp. 446-52.
-
(2002)
Engineering Construction and Architectural Management
, vol.5-6
, pp. 446-452
-
-
Tam, C.M.1
Tong, T.2
Tse, S.3
-
23
-
-
2342444111
-
-
In SD-35, Construction Industry Institute (CII), Austin, TX
-
Thomas, H. R. and Kramer, D. F. (2002). In The Manual of Construction Productivity Measurement and Performance Evaluation. SD-35, Construction Industry Institute (CII), Austin, TX
-
(2002)
The Manual of Construction Productivity Measurement and Performance Evaluation
-
-
Thomas, H.R.1
Kramer, D.F.2
-
24
-
-
33749834145
-
Predicting climate from tree ring data: A comparison of liner regression and neural network methodologies
-
In. MS thesis, The Pennsylvania State University
-
Wall, A. (1998). In. Predicting climate from tree ring data: A comparison of liner regression and neural network methodologies. MS thesis, The Pennsylvania State University
-
(1998)
-
-
Wall, A.1
|