Solving the discrete time/resource trade-off problem in project scheduling with genetic algorithms
-
DOI 10.1016/j.amc.2007.02.109, PII S0096300307002731
-
M Ranjbar, F Kianfar, "Solving the discrete time/resource trade-off problem in project scheduling with genetic algorithms" Applied Mathematics and Computation, vol.191, 2007, pp. 451-456 (Pubitemid 47302093)
-
(2007)
Applied Mathematics and Computation
, vol.191
, Issue.2
, pp. 451-456
-
-
Ranjbar, M.R.1
Kianfar, F.2
-
2
-
-
70449527542
-
Using novel particle swarm optimization scheme to solve resource-constrained scheduling problem in PSPLIB
-
R Chen, C Wu, C Wang, et al. "Using novel particle swarm optimization scheme to solve resource-constrained scheduling problem in PSPLIB". Expert Systems with Applications, vol.37,2010, pp.1899-1910
-
(2010)
Expert Systems with Applications
, vol.37
, pp. 1899-1910
-
-
Chen, R.1
Wu, C.2
Wang, C.3
-
3
-
-
36849084169
-
Tabu search for multi-mode resource-constrained project scheduling with schedule-dependent setup times
-
DOI 10.1016/j.ejor.2006.06.069, PII S0377221706008344
-
M Mika, G Waligora, J Weglarz. "Tabu search for multi-mode resource-constrained project scheduling with schedule-dependent setup times". European Journal of Operational Research, vol.187, 2008,pp.1238-1250 (Pubitemid 350236634)
-
(2008)
European Journal of Operational Research
, vol.187
, Issue.3
, pp. 1238-1250
-
-
Mika, M.1
Waligora, G.2
Weglarz, J.3
-
4
-
-
60349124753
-
Differential evolution for solving multi-mode resource-constrained project scheduling problems
-
N Damak, B Jarboui, P Siarry. "Differential evolution for solving multi-mode resource-constrained project scheduling problems", Computers & Operations Research, vol.36, 2009,pp. 2653-2659
-
(2009)
Computers & Operations Research
, vol.36
, pp. 2653-2659
-
-
Damak, N.1
Jarboui, B.2
Siarry, P.3
-
5
-
-
0034974417
-
A new heuristic optimization algorithm: Harmony search
-
Z Geem, J Kim, G Loganathan. "A new heuristic optimization algorithm:harmony search". Simulation, vol.76(2), 2001, pp.60-68 (Pubitemid 32543074)
-
(2001)
Simulation
, vol.76
, Issue.2
, pp. 60-68
-
-
Geem, Z.W.1
Kim, J.H.2
Loganathan, G.V.3
-
6
-
-
33646268618
-
Optimal cost design of water distribution networks using harmony search
-
Z Geem. "Optimal cost design of water distribution networks using harmony search". Engineering Optimization, vol.38 no.3, 2006, pp.259-280
-
(2006)
Engineering Optimization
, vol.38
, Issue.3
, pp. 259-280
-
-
Geem, Z.1
-
7
-
-
0036304087
-
Harmony search optimization: Application to pipe network design
-
205-2005
-
Z Geem, J Kim, G Loganathan. "Harmony search optimization: application to pipe network design". International Journal of Modeling and Simulation, vol.22, 2002,pp.125-133 (Pubitemid 34732149)
-
(2002)
International Journal of Modelling and Simulation
, vol.22
, Issue.2
, pp. 125-133
-
-
Geem, Z.W.1
Kim, J.H.2
Loganathan, G.V.3
-
8
-
-
70749099573
-
Application of new version of harmony search algorithm in slope stability analysis
-
L Li, S Chi. "Application of new version of harmony search algorithm in slope stability analysis". Journal of Water Resources and Architectural Engineering, vol.5 no.3, 2007, pp.1-6
-
(2007)
Journal of Water Resources and Architectural Engineering
, vol.5
, Issue.3
, pp. 1-6
-
-
Li, L.1
Chi, S.2
-
9
-
-
70749122552
-
Harmony search algorithms for no-idle flow shop scheduling problems
-
L Wu, Q Pan, H Sang, et al. "Harmony search algorithms for no-idle flow shop scheduling problems". Computer Integrated Manufacturing Systems, vol.15 no.10, 2009, pp.1960-1967
-
(2009)
Computer Integrated Manufacturing Systems
, vol.15
, Issue.10
, pp. 1960-1967
-
-
Wu, L.1
Pan, Q.2
Sang, H.3
-
10
-
-
34648837872
-
A hybrid genetic algorithm for the resource-constrained project scheduling problem
-
DOI 10.1016/j.ejor.2006.12.033, PII S0377221707000616
-
V Valls, F Ballsestin, S Quintanilla. "A hybrid genetic algorithm for the resource-constrained project scheduling problem". European Journal of Operational Research, vol.185, 2008,pp.495-508 (Pubitemid 47454671)
-
(2008)
European Journal of Operational Research
, vol.185
, Issue.2
, pp. 495-508
-
-
Valls, V.1
Ballestin, F.2
Quintanilla, S.3
-
11
-
-
0000698758
-
Characterization and generation of a general class of resource constrained project scheduling problems
-
R Kolisch, A Sprecher, A Drexl. "Characterization and generation of a general class of resource constrained project scheduling problems". Management Science, vol.41, 1995,pp.1693-1703
-
(1995)
Management Science
, vol.41
, pp. 1693-1703
-
-
Kolisch, R.1
Sprecher, A.2
Drexl, A.3
-
12
-
-
0032096811
-
Multi-mode resource-constrained project scheduling by a simple, general and powerful sequencing algorithm
-
A Sprecher, A Drexl. "Multi-mode resource-constrained project scheduling by a simple, general and powerful sequencing algorithm". European Journal of Operational Research, vol.107, 1998, pp.431- 450
-
(1998)
European Journal of Operational Research
, vol.107
, pp. 431-450
-
-
Sprecher, A.1
Drexl, A.2
|