메뉴 건너뛰기




Volumn 1, Issue , 2011, Pages 181-184

A modified harmony search for multi-mode resource constrained project scheduling problem

Author keywords

Harmony Search; Multi Mode; Project Scheduling Problem; Resource Constrained

Indexed keywords

BENCHMARK TESTS; FIRST OPTIONS; HARMONY SEARCH; HIGH QUALITY; MODE SELECTION; MULTIMODES; NUMERICAL EXPERIMENTS; PROJECT SCHEDULING PROBLEM; RESOURCE-CONSTRAINED; RESOURCE-CONSTRAINED PROJECT SCHEDULING PROBLEM; ROBUST SOLUTIONS; SELECTION OPERATORS;

EID: 83455219323     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: 10.1109/ISCID.2011.54     Document Type: Conference Paper
Times cited : (2)

References (12)
  • 1
    • 34548127710 scopus 로고    scopus 로고
    • Solving the discrete time/resource trade-off problem in project scheduling with genetic algorithms
    • DOI 10.1016/j.amc.2007.02.109, PII S0096300307002731
    • M Ranjbar, F Kianfar, "Solving the discrete time/resource trade-off problem in project scheduling with genetic algorithms" Applied Mathematics and Computation, vol.191, 2007, pp. 451-456 (Pubitemid 47302093)
    • (2007) Applied Mathematics and Computation , vol.191 , Issue.2 , pp. 451-456
    • Ranjbar, M.R.1    Kianfar, F.2
  • 2
    • 70449527542 scopus 로고    scopus 로고
    • Using novel particle swarm optimization scheme to solve resource-constrained scheduling problem in PSPLIB
    • R Chen, C Wu, C Wang, et al. "Using novel particle swarm optimization scheme to solve resource-constrained scheduling problem in PSPLIB". Expert Systems with Applications, vol.37,2010, pp.1899-1910
    • (2010) Expert Systems with Applications , vol.37 , pp. 1899-1910
    • Chen, R.1    Wu, C.2    Wang, C.3
  • 3
    • 36849084169 scopus 로고    scopus 로고
    • Tabu search for multi-mode resource-constrained project scheduling with schedule-dependent setup times
    • DOI 10.1016/j.ejor.2006.06.069, PII S0377221706008344
    • M Mika, G Waligora, J Weglarz. "Tabu search for multi-mode resource-constrained project scheduling with schedule-dependent setup times". European Journal of Operational Research, vol.187, 2008,pp.1238-1250 (Pubitemid 350236634)
    • (2008) European Journal of Operational Research , vol.187 , Issue.3 , pp. 1238-1250
    • Mika, M.1    Waligora, G.2    Weglarz, J.3
  • 4
    • 60349124753 scopus 로고    scopus 로고
    • Differential evolution for solving multi-mode resource-constrained project scheduling problems
    • N Damak, B Jarboui, P Siarry. "Differential evolution for solving multi-mode resource-constrained project scheduling problems", Computers & Operations Research, vol.36, 2009,pp. 2653-2659
    • (2009) Computers & Operations Research , vol.36 , pp. 2653-2659
    • Damak, N.1    Jarboui, B.2    Siarry, P.3
  • 5
    • 0034974417 scopus 로고    scopus 로고
    • A new heuristic optimization algorithm: Harmony search
    • Z Geem, J Kim, G Loganathan. "A new heuristic optimization algorithm:harmony search". Simulation, vol.76(2), 2001, pp.60-68 (Pubitemid 32543074)
    • (2001) Simulation , vol.76 , Issue.2 , pp. 60-68
    • Geem, Z.W.1    Kim, J.H.2    Loganathan, G.V.3
  • 6
    • 33646268618 scopus 로고    scopus 로고
    • Optimal cost design of water distribution networks using harmony search
    • Z Geem. "Optimal cost design of water distribution networks using harmony search". Engineering Optimization, vol.38 no.3, 2006, pp.259-280
    • (2006) Engineering Optimization , vol.38 , Issue.3 , pp. 259-280
    • Geem, Z.1
  • 8
    • 70749099573 scopus 로고    scopus 로고
    • Application of new version of harmony search algorithm in slope stability analysis
    • L Li, S Chi. "Application of new version of harmony search algorithm in slope stability analysis". Journal of Water Resources and Architectural Engineering, vol.5 no.3, 2007, pp.1-6
    • (2007) Journal of Water Resources and Architectural Engineering , vol.5 , Issue.3 , pp. 1-6
    • Li, L.1    Chi, S.2
  • 9
    • 70749122552 scopus 로고    scopus 로고
    • Harmony search algorithms for no-idle flow shop scheduling problems
    • L Wu, Q Pan, H Sang, et al. "Harmony search algorithms for no-idle flow shop scheduling problems". Computer Integrated Manufacturing Systems, vol.15 no.10, 2009, pp.1960-1967
    • (2009) Computer Integrated Manufacturing Systems , vol.15 , Issue.10 , pp. 1960-1967
    • Wu, L.1    Pan, Q.2    Sang, H.3
  • 10
    • 34648837872 scopus 로고    scopus 로고
    • A hybrid genetic algorithm for the resource-constrained project scheduling problem
    • DOI 10.1016/j.ejor.2006.12.033, PII S0377221707000616
    • V Valls, F Ballsestin, S Quintanilla. "A hybrid genetic algorithm for the resource-constrained project scheduling problem". European Journal of Operational Research, vol.185, 2008,pp.495-508 (Pubitemid 47454671)
    • (2008) European Journal of Operational Research , vol.185 , Issue.2 , pp. 495-508
    • Valls, V.1    Ballestin, F.2    Quintanilla, S.3
  • 11
    • 0000698758 scopus 로고
    • Characterization and generation of a general class of resource constrained project scheduling problems
    • R Kolisch, A Sprecher, A Drexl. "Characterization and generation of a general class of resource constrained project scheduling problems". Management Science, vol.41, 1995,pp.1693-1703
    • (1995) Management Science , vol.41 , pp. 1693-1703
    • Kolisch, R.1    Sprecher, A.2    Drexl, A.3
  • 12
    • 0032096811 scopus 로고    scopus 로고
    • Multi-mode resource-constrained project scheduling by a simple, general and powerful sequencing algorithm
    • A Sprecher, A Drexl. "Multi-mode resource-constrained project scheduling by a simple, general and powerful sequencing algorithm". European Journal of Operational Research, vol.107, 1998, pp.431- 450
    • (1998) European Journal of Operational Research , vol.107 , pp. 431-450
    • Sprecher, A.1    Drexl, A.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.