메뉴 건너뛰기




Volumn 135, Issue 6, 2009, Pages 540-549

Contemporary design-bid-build model

Author keywords

Bids; Building design; Construction management; Project delivery

Indexed keywords

BIDS; BUILDING CONSTRUCTION PROJECTS; BUILDING DESIGN; BUILDING PERFORMANCE; CONSTRUCTABILITY; CONSTRUCTION MANAGEMENT; CONSTRUCTION PHASE; DESIGN AND CONSTRUCTION; DESIGN AND CONSTRUCTION PROCESS; DESIGN TASKS; EMPIRICAL RESEARCH; LEAN CONSTRUCTION; PROFIT MARGIN; PROJECT DELIVERY; PROJECT SPECIFICATION; TECHNICAL SPECIFICATIONS; TIME PRESSURES;

EID: 81855211779     PISSN: 07339364     EISSN: None     Source Type: Journal    
DOI: 10.1061/(ASCE)0733-9364(2009)135:6(540)     Document Type: Article
Times cited : (18)

References (15)
  • 1
    • 27644564536 scopus 로고    scopus 로고
    • American Concrete Institute, Farmington Hills, Mich
    • ACI. (2003). Manual of concrete practice, American Concrete Institute, Farmington Hills, Mich.
    • (2003) ACI.. Manual of Concrete Practice
  • 3
    • 0343538710 scopus 로고    scopus 로고
    • 13th Ed., American Institute of Steel Construction, Chicago
    • AISC. (2006). Steel construction manual, 13th Ed., American Institute of Steel Construction, Chicago.
    • (2006) AISC.. Steel Construction Manual
  • 4
    • 69949101125 scopus 로고    scopus 로고
    • Lean project delivery system
    • Lean Construction Institute, (Nov. 11, 2004)
    • Ballard, G. (2000). " Lean project delivery system.." LCI white paper-8, Lean Construction Institute, 〈 http://www.leanconstruction. org 〉 (Nov. 11, 2004).
    • (2000) LCI White paper-8
    • Ballard, G.1
  • 6
    • 3543096929 scopus 로고    scopus 로고
    • Revised code brings together full design team
    • Carter, C. J. (2000). " Revised code brings together full design team.." Modern Steel Constr., 40 (8), 1-5.
    • (2000) Modern Steel Constr. , vol.40 , Issue.8 , pp. 1-5
    • Carter, C.J.1
  • 9
    • 81855204795 scopus 로고
    • Lean Construction Institute, (April 14, 2006)
    • Pappas, M. (1990). " Report on a lean project.." Lean Construction Institute, 〈 http://www.leanconstruction.org/pdf/pappas. pdf 〉 (April 14, 2006).
    • (1990) Report on A Lean Project
    • Pappas, M.1
  • 12
    • 0034545205 scopus 로고    scopus 로고
    • Coordinating building systems: Process and knowledge
    • DOI 10.1061/(ASCE)1076-0431(2000)6:4(116)
    • Tatum C. B. (2000). " Coordinating building systems: Process and knowledge.." J. Archit. Eng., 6 (4), 116-121. (Pubitemid 32021978)
    • (2000) Journal of Architectural Engineering , vol.6 , Issue.4 , pp. 116-121
    • Tatum, C.B.1    Korman, T.2
  • 13
    • 0035581122 scopus 로고    scopus 로고
    • The technological trajectories of construction innovation
    • Toole T. M. (2001). " The technological trajectories of construction innovation.." J. Archit. Eng., 7 (4), 107-114.
    • (2001) J. Archit. Eng. , vol.7 , Issue.4 , pp. 107-114
    • Toole, T.M.1
  • 15
    • 13944265045 scopus 로고    scopus 로고
    • Master builder project delivery system and designer construction knowledge
    • DOI 10.1061/(ASCE)0733-9364(2003)129:6(635)
    • Yates, J. K. (2003). " Master builder project delivery system and designer construction knowledge.." J. Constr. Eng. Manage., 129 (6), 635-644. (Pubitemid 40265423)
    • (2003) Journal of Construction Engineering and Management , vol.129 , Issue.6 , pp. 635-644
    • Yates, J.K.1    Battersby, L.C.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.