메뉴 건너뛰기




Volumn 6, Issue 27, 2011, Pages 6286-6294

Using simulated annealing algorithm for optimization of quay cranes and automated guided vehicles scheduling

Author keywords

Automated guided vehicles; Integrated scheduling; Quay cranes; Simulated annealing

Indexed keywords


EID: 81255146413     PISSN: 19921950     EISSN: None     Source Type: Journal    
DOI: None     Document Type: Article
Times cited : (14)

References (23)
  • 1
    • 79957936133 scopus 로고    scopus 로고
    • Investigating a round robin strategy over multi algorithms in optimising the quality of university course timetables
    • Abdullah S, Shaker K, Shaker H (2011). Investigating a round robin strategy over multi algorithms in optimising the quality of university course timetables. Int. J. Phys. Sci., 6(6): 1452-1462
    • (2011) Int. J. Phys. Sci , vol.6 , Issue.6 , pp. 1452-1462
    • Abdullah, S.1    Shaker, K.2    Shaker, H.3
  • 2
    • 70350568773 scopus 로고    scopus 로고
    • A survey of berth allocation and quay crane scheduling problems in container terminals
    • Bierwirth C, Meisel F (2010). A survey of berth allocation and quay crane scheduling problems in container terminals. Eur. J. Oper. Res., 202(3): 615-627
    • (2010) Eur. J. Oper. Res , vol.202 , Issue.3 , pp. 615-627
    • Bierwirth, C.1    Meisel, F.2
  • 3
    • 74449083118 scopus 로고    scopus 로고
    • The integrated yard truck and yard crane scheduling problem: Benders' decomposition-based methods
    • Cao JX, Lee D-H, Chen JH, Shi Q (2010). The integrated yard truck and yard crane scheduling problem: Benders' decomposition-based methods. Transport. Res. E-Log., 46(3): 344-353
    • (2010) Transport. Res. E-Log , vol.46 , Issue.3 , pp. 344-353
    • Cao, J.X.1    Lee, D.-H.2    Chen, J.H.3    Shi, Q.4
  • 4
    • 63549149518 scopus 로고    scopus 로고
    • Hybrid of genetic algorithm and simulated annealing for multiple project scheduling with multiple resource constraints
    • Chen P-H, Shahandashti SM (2009). Hybrid of genetic algorithm and simulated annealing for multiple project scheduling with multiple resource constraints. Automat. Constr., 18(4): 434-443
    • (2009) Automat. Constr , vol.18 , Issue.4 , pp. 434-443
    • Chen, P.-H.1    Shahandashti, S.M.2
  • 5
    • 77952939073 scopus 로고    scopus 로고
    • A hybrid simulated annealing algorithm for solving multi-objective container-loading problems Appl
    • Dereli T, Sena Das G (2010). A hybrid simulated annealing algorithm for solving multi-objective container-loading problems Appl. Artif. Intell., 24(5): 463-486
    • (2010) Artif. Intell , vol.24 , Issue.5 , pp. 463-486
    • Dereli, T.1    Das, S.G.2
  • 6
    • 79952119600 scopus 로고    scopus 로고
    • A fuzzy MCDM model of service performance for container ports
    • Ding JF, Chou CC (2011). A fuzzy MCDM model of service performance for container ports. Sci. Res. Essays, 6(3): 559-566
    • (2011) Sci. Res. Essays , vol.6 , Issue.3 , pp. 559-566
    • Ding, J.F.1    Chou, C.C.2
  • 7
    • 0038743113 scopus 로고    scopus 로고
    • Berth scheduling by simulated annealing
    • Kim KH, Moon KC (2003). Berth scheduling by simulated annealing. Transport. Res. B-Meth., 37(6): 541-560
    • (2003) Transport. Res. B-Meth , vol.37 , Issue.6 , pp. 541-560
    • Kim, K.H.1    Moon, K.C.2
  • 8
    • 38749148521 scopus 로고    scopus 로고
    • Integrated scheduling of handling equipment at automated container terminals
    • Lau HYK, Zhao Y (2008). Integrated scheduling of handling equipment at automated container terminals. Ann. Oper. Res., 159(1): 373-394
    • (2008) Ann. Oper. Res , vol.159 , Issue.1 , pp. 373-394
    • Lau, H.Y.K.1    Zhao, Y.2
  • 9
    • 62749165268 scopus 로고    scopus 로고
    • Integrated quay crane and yard truck schedule for inbound containers. Paper presented at the IEEE International Conference on Industrial Engineering and Engineering Management, IEEM 2008
    • Lee DH, Cao JX, Shi QX (2008). Integrated quay crane and yard truck schedule for inbound containers. Paper presented at the IEEE International Conference on Industrial Engineering and Engineering Management, IEEM 2008., Singapore, pp. 1219-1223
    • (2008) Singapore , pp. 1219-1223
    • Lee, D.H.1    Cao, J.X.2    Shi, Q.X.3
  • 10
    • 33846960732 scopus 로고    scopus 로고
    • Scheduling of two-transtainer systems for loading outbound containers in port container terminals with simulated annealing algorithm
    • Lee DH, Cao Z, Meng Q (2007). Scheduling of two-transtainer systems for loading outbound containers in port container terminals with simulated annealing algorithm. Int. J. Prod. Econ., 107(1): 115-124
    • (2007) Int. J. Prod. Econ , vol.107 , Issue.1 , pp. 115-124
    • Lee, D.H.1    Cao, Z.2    Meng, Q.3
  • 12
    • 81255180463 scopus 로고    scopus 로고
    • Dynamic scheduling of handling equipment at automated container terminals
    • The Netherlands: Erasmus University
    • Meersmans PJM, Wagelmans APM. (2001). Dynamic scheduling of handling equipment at automated container terminals. Rotterdam, The Netherlands: Erasmus University.
    • (2001) Rotterdam
    • Meersmans, P.J.M.1    Wagelmans, A.P.M.2
  • 13
    • 64449085610 scopus 로고    scopus 로고
    • An improved simulated annealing for hybrid flowshops with sequence-dependent setup and transportation times to minimize total completion time and total tardiness
    • Naderi B, Zandieh M, Khaleghi Ghoshe Balagh A, Roshanaei V (2009). An improved simulated annealing for hybrid flowshops with sequence-dependent setup and transportation times to minimize total completion time and total tardiness. Expert Syst. Appl., 36(6): 9625-9633
    • (2009) Expert Syst. Appl , vol.36 , Issue.6 , pp. 9625-9633
    • Naderi, B.1    Zandieh, M.2    Balagh, K.G.A.3    Roshanaei, V.4
  • 14
    • 60549102454 scopus 로고    scopus 로고
    • A dispatching method for automated lifting vehicles in automated port container terminals
    • Nguyen VD, Kim KH (2009). A dispatching method for automated lifting vehicles in automated port container terminals. Comput. Ind. Eng., 56(3): 1002-1020
    • (2009) Comput. Ind. Eng , vol.56 , Issue.3 , pp. 1002-1020
    • Nguyen, V.D.1    Kim, K.H.2
  • 15
    • 79958041275 scopus 로고    scopus 로고
    • An optimization technique using hybrid GA-SA algorithm for multi-objective scheduling problem
    • Norozi A, Ariffin M, Ismail N, Mustapha F (2011). An optimization technique using hybrid GA-SA algorithm for multi-objective scheduling problem. Sci. Res. Essays, 6(8): 1720-1731
    • (2011) Sci. Res. Essays , vol.6 , Issue.8 , pp. 1720-1731
    • Norozi, A.1    Ariffin, M.2    Ismail, N.3    Mustapha, F.4
  • 16
    • 33644513123 scopus 로고    scopus 로고
    • The time factor in liner shipping services
    • Notteboom TE (2006). The time factor in liner shipping services. Mar. Econ. Log., 8(1): 19-39
    • (2006) Mar. Econ. Log , vol.8 , Issue.1 , pp. 19-39
    • Notteboom, T.E.1
  • 17
    • 33751165245 scopus 로고    scopus 로고
    • A hybrid multi-objective GA for simultaneous scheduling of machines and AGVs in FMS
    • Reddy B, Rao C (2006). A hybrid multi-objective GA for simultaneous scheduling of machines and AGVs in FMS. Int. J. Adv. Manuf. Tech., 31(5): 602-613
    • (2006) Int. J. Adv. Manuf. Tech , vol.31 , Issue.5 , pp. 602-613
    • Reddy, B.1    Rao, C.2
  • 18
    • 36248971841 scopus 로고    scopus 로고
    • Operations research at container terminals: A literature update
    • Stahlbock R, Voß S (2008). Operations research at container terminals: a literature update. OR Spectrum, 30(1): 1-52
    • (2008) OR Spectrum , vol.30 , Issue.1 , pp. 1-52
    • Stahlbock, R.1    Voß, S.2
  • 19
    • 70350065890 scopus 로고    scopus 로고
    • Scheduling of AGVs and machines in FMS with makespan criteria using sheep flock heredity algorithm
    • Subbaiah K, Rao MN, Rao KN (2009). Scheduling of AGVs and machines in FMS with makespan criteria using sheep flock heredity algorithm. Int. J. Phys. Sci., 4(2): 139-148
    • (2009) Int. J. Phys. Sci , vol.4 , Issue.2 , pp. 139-148
    • Subbaiah, K.1    Rao, M.N.2    Rao, K.N.3
  • 20
    • 33748636920 scopus 로고    scopus 로고
    • A survey of simulated annealing as a tool for single and multi-objective optimization
    • Suman B, Kumar P (2006). A survey of simulated annealing as a tool for single and multi-objective optimization. J. Oper. Res. Soc., 57: 1143-1160.
    • (2006) J. Oper. Res. Soc , vol.57 , pp. 1143-1160
    • Suman, B.1    Kumar, P.2
  • 21
    • 81255180461 scopus 로고    scopus 로고
    • UNCTAD, Review of maritime transport. New York and Geneva: United Nations
    • UNCTAD. (2010). Review of maritime transport. New York and Geneva: United Nations.
    • (2010)
  • 22
    • 49749114008 scopus 로고    scopus 로고
    • A statistical model for expected cycle time of SP-AS/RS: An application of Monte Carlo simulation
    • Vasili M, Tang SH, Homayouni SM, Ismail N (2008). A statistical model for expected cycle time of SP-AS/RS: an application of Monte Carlo simulation. Appl. Artif. Intell., 22(7): 824-840
    • (2008) Appl. Artif. Intell , vol.22 , Issue.7 , pp. 824-840
    • Vasili, M.1    Tang, S.H.2    Homayouni, S.M.3    Ismail, N.4
  • 23
    • 56549110421 scopus 로고    scopus 로고
    • Integrating simulation and optimization to schedule loading operations in container terminals
    • Zeng Q, Yang Z (2009). Integrating simulation and optimization to schedule loading operations in container terminals. Comput. Oper. Res., 36(6): 1935-1944.
    • (2009) Comput. Oper. Res , vol.36 , Issue.6 , pp. 1935-1944
    • Zeng, Q.1    Yang, Z.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.