메뉴 건너뛰기




Volumn 4, Issue 3, 2009, Pages 139-148

Scheduling of AGVs and machines in FMS with makespan criteria using sheep flock heredity algorithm

Author keywords

AGVs; FMS; Scheduling

Indexed keywords


EID: 70350065890     PISSN: 19921950     EISSN: None     Source Type: Journal    
DOI: None     Document Type: Article
Times cited : (42)

References (7)
  • 1
    • 0026866144 scopus 로고
    • Dynamic dispatching algorithm for scheduling machines and automated guided vehicles in a flexible manufacturing system
    • Sabuncuoglu I, Hommertzheim DL (1992). "Dynamic dispatching algorithm for scheduling machines and automated guided vehicles in a flexible manufacturing system." Int. J. Prod. Res. 30: 1059-1079.
    • (1992) Int. J. Prod. Res. , vol.30 , pp. 1059-1079
    • Sabuncuoglu, I.1    Hommertzheim, D.L.2
  • 2
    • 0029404820 scopus 로고
    • A time window approach to simultaneous scheduling of machines and material handling system in an FMS
    • Bilge U, Ulusoy G (1995). A time window approach to simultaneous scheduling of machines and material handling system in an FMS." Oper. Res. 43(6): 1058-1070.
    • (1995) Oper. Res. , vol.43 , Issue.6 , pp. 1058-1070
    • Bilge, U.1    Ulusoy, G.2
  • 3
    • 0031124354 scopus 로고    scopus 로고
    • A genetic algorithm approach to the simultaneous scheduling of machines and automated guided vehicles
    • Ulusoy G, Sivrikayaserifoglus F, Bilge U (1997). "A genetic algorithm approach to the simultaneous scheduling of machines and automated guided vehicles." Computer Operations Res 24(4): 335-351.
    • (1997) Computer Operations Res , vol.24 , Issue.4 , pp. 335-351
    • Ulusoy, G.1    Sivrikayaserifoglus, F.2    Bilge, U.3
  • 4
    • 33751165245 scopus 로고    scopus 로고
    • A hybrid multi-objective GA for simultaneous scheduling of machines and AGVs in FMS
    • Reddy BSP, Rao CSP (2006). A hybrid multi-objective GA for simultaneous scheduling of machines and AGVs in FMS." Int. J. Adv. Manuf. Technol. 31: 602-613.
    • (2006) Int. J. Adv. Manuf. Technol. , vol.31 , pp. 602-613
    • Reddy, B.S.P.1    Rao, C.S.P.2
  • 5
    • 0023868237 scopus 로고
    • Multi-pass expert control system -a control/scheduling structure for flexible manufacturing cells
    • Wu SYD, Wysk RA (1988). "Multi-pass expert control system -a control/scheduling structure for flexible manufacturing cells." J. Manuf. Syst. 7(2): 107-120.
    • (1988) J. Manuf. Syst. , vol.7 , Issue.2 , pp. 107-120
    • Wu, S.Y.D.1    Wysk, R.A.2
  • 6
    • 70350085989 scopus 로고    scopus 로고
    • A new evolutionary algorithm based on sheep flocks heredity model
    • Hyunchul K, Byungchul A (2001). "A New Evolutionary Algorithm based On Sheep Flocks Heredity Model." IEEE.
    • (2001) IEEE.
    • Hyunchul, K.1    Byungchul, A.2
  • 7
    • 1342287294 scopus 로고    scopus 로고
    • A hybrid GA/heuristic approach to the simultaneous scheduling of machines and automated guided vehicles
    • Abdelmaguid TF, Nassef AO, Kamal BA, Hassan MF (2004). A hybrid GA/heuristic approach to the simultaneous scheduling of machines and automated guided vehicles." Int. J. Prod. Res. 42: 267-281.
    • (2004) Int. J. Prod. Res. , vol.42 , pp. 267
    • Abdelmaguid, T.F.1    Nassef, A.O.2    Kamal, B.A.3    Hassan, M.F.4


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.