Volumn 10, Issue 3, 2010, Pages 919-925

The use of a fuzzy multi-objective linear programming for solving a multi-objective single-machine scheduling problem

Author keywords

Decision maker; Fuzzy multi objective linear programming; Multi objective linear programming; Single machine scheduling

Indexed keywords

COMPUTATIONAL RESULTS; DECISION MAKERS; FUZZY MULTI-OBJECTIVE LINEAR PROGRAMMING; MAKESPAN; MULTI OBJECTIVE; MULTI-OBJECTIVE LINEAR PROGRAMMING; NUMERICAL EXAMPLE; OBJECTIVE FUNCTIONS; SATISFACTION DEGREES; SINGLE-MACHINE SCHEDULING; TOTAL-WEIGHTED TARDINESS;

EID: 77649231616     PISSN: 15684946     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.asoc.2009.10.010     Document Type: Article
Times cited : (36)

References (22)
  • 3
    • 14844343676 scopus 로고    scopus 로고
    • A parametric model for cell formation and exceptional elements problems with fuzzy parameters
    • Askin F., and Gungor Z. A parametric model for cell formation and exceptional elements problems with fuzzy parameters. Journal of Intelligent Manufacturing 16 (2005) 103-114
    • (2005) Journal of Intelligent Manufacturing , vol.16 , pp. 103-114
    • Askin, F.1    Gungor, Z.2
  • 5
    • 0346636333 scopus 로고
    • Decision-making in a fuzzy environment
    • Bellman R.E., and Zadeh L.A. Decision-making in a fuzzy environment. Management Science 17 (1970) 141-164
    • (1970) Management Science , vol.17 , pp. 141-164
    • Bellman, R.E.1    Zadeh, L.A.2
  • 6
    • 0037410246 scopus 로고    scopus 로고
    • On two single machine scheduling problems with fuzzy processing times and fuzzy due dates
    • Chanas S., and Kasperski A. On two single machine scheduling problems with fuzzy processing times and fuzzy due dates. European Journal of Operational Research 147 (2003) 281-296
    • (2003) European Journal of Operational Research , vol.147 , pp. 281-296
    • Chanas, S.1    Kasperski, A.2
  • 7
    • 1242310012 scopus 로고    scopus 로고
    • Possible and necessary optimality of solutions in the single machine scheduling problem with fuzzy parameters
    • Chanas S., and Kasperski A. Possible and necessary optimality of solutions in the single machine scheduling problem with fuzzy parameters. Fuzzy Sets and Systems 142 (2004) 359-371
    • (2004) Fuzzy Sets and Systems , vol.142 , pp. 359-371
    • Chanas, S.1    Kasperski, A.2
  • 8
    • 33747373886 scopus 로고    scopus 로고
    • A bicriteria scheduling with sequence-dependent setup times
    • Eren T., and Güner E. A bicriteria scheduling with sequence-dependent setup times. Applied Mathematics and Computation 179 1 (2006) 378-385
    • (2006) Applied Mathematics and Computation , vol.179 , Issue.1 , pp. 378-385
    • Eren, T.1    Güner, E.2
  • 9
    • 0000559267 scopus 로고
    • Linear programming with multiple fuzzy goals
    • Hannan E.L. Linear programming with multiple fuzzy goals. Fuzzy Sets and Systems 6 (1981) 235-248
    • (1981) Fuzzy Sets and Systems , vol.6 , pp. 235-248
    • Hannan, E.L.1
  • 10
    • 33750471582 scopus 로고    scopus 로고
    • Bi-criteria scheduling problems: number of tardy jobs and maximum weighted tardiness
    • Huo Y., Leung J.Y.-T., and Zhao H. Bi-criteria scheduling problems: number of tardy jobs and maximum weighted tardiness. European Journal of Operational Research 177 1 (2007) 116-134
    • (2007) European Journal of Operational Research , vol.177 , Issue.1 , pp. 116-134
    • Huo, Y.1    Leung, J.Y.-T.2    Zhao, H.3
  • 11
    • 0029638856 scopus 로고
    • Single machine scheduling problem with fuzzy precedence relation
    • Ishi H., and Tada M. Single machine scheduling problem with fuzzy precedence relation. European Journal of Operational Research 87 (1995) 284-288
    • (1995) European Journal of Operational Research , vol.87 , pp. 284-288
    • Ishi, H.1    Tada, M.2
  • 13
    • 43549085961 scopus 로고
    • On finding compromise solutions in multi-criteria problems using the fuzzy min-operator
    • Leberling H. On finding compromise solutions in multi-criteria problems using the fuzzy min-operator. Fuzzy Sets and Systems 6 (1981) 105-118
    • (1981) Fuzzy Sets and Systems , vol.6 , pp. 105-118
    • Leberling, H.1
  • 14
    • 5144232432 scopus 로고    scopus 로고
    • Solving multi-objective production scheduling problems using meta-heuristics
    • Loukil T., Teghem J., and Tuyttens D. Solving multi-objective production scheduling problems using meta-heuristics. European Journal of Operational Research 161 (2005) 42-61
    • (2005) European Journal of Operational Research , vol.161 , pp. 42-61
    • Loukil, T.1    Teghem, J.2    Tuyttens, D.3
  • 15
    • 0020186942 scopus 로고
    • Compensatory operators in fuzzy programming with multiple objectives
    • Luhandjula M.K. Compensatory operators in fuzzy programming with multiple objectives. Fuzzy Sets and Systems 8 (1982) 245-252
    • (1982) Fuzzy Sets and Systems , vol.8 , pp. 245-252
    • Luhandjula, M.K.1
  • 16
    • 38249028725 scopus 로고
    • An interactive fuzzy satisfying method for multi-objective linear fractional programming problems
    • Sakawa M. An interactive fuzzy satisfying method for multi-objective linear fractional programming problems. Fuzzy Sets and Systems 28 (1988) 129-144
    • (1988) Fuzzy Sets and Systems , vol.28 , pp. 129-144
    • Sakawa, M.1
  • 18
    • 25144495566 scopus 로고    scopus 로고
    • Optimal scheduling for a single machine to minimize the sum of maximum earliness and tardiness considering idle insert
    • Tavakkoli-Moghaddam R., Moslehi G., Vasei M., and Azaron A. Optimal scheduling for a single machine to minimize the sum of maximum earliness and tardiness considering idle insert. Applied Mathematics and Computation 167 2 (2005) 1430-1450
    • (2005) Applied Mathematics and Computation , vol.167 , Issue.2 , pp. 1430-1450
    • Tavakkoli-Moghaddam, R.1    Moslehi, G.2    Vasei, M.3    Azaron, A.4
  • 19
    • 33344464311 scopus 로고    scopus 로고
    • A branch-and-bound algorithm for a single machine to minimize the sum of maximum earliness and tardiness with idle insert
    • Tavakkoli-Moghaddam R., Moslehi G., Vasei M., and Azaron A. A branch-and-bound algorithm for a single machine to minimize the sum of maximum earliness and tardiness with idle insert. Applied Mathematics and Computation 174 1 (2006) 388-408
    • (2006) Applied Mathematics and Computation , vol.174 , Issue.1 , pp. 388-408
    • Tavakkoli-Moghaddam, R.1    Moslehi, G.2    Vasei, M.3    Azaron, A.4
  • 20
    • 77649237951 scopus 로고    scopus 로고
    • Solving a mixed-integer model of a single machine scheduling problem by a fuzzy goal programming approach
    • Tavakkoli-Moghaddam R., Javadi B., and Safaei N. Solving a mixed-integer model of a single machine scheduling problem by a fuzzy goal programming approach. Wseas Transactions on Business and Economics 3 2 (2006) 45-52
    • (2006) Wseas Transactions on Business and Economics , vol.3 , Issue.2 , pp. 45-52
    • Tavakkoli-Moghaddam, R.1    Javadi, B.2    Safaei, N.3
  • 21
    • 1442334789 scopus 로고    scopus 로고
    • Application of fuzzy multi-objective linear programming to aggregate production planning
    • Wang R.C., and Liang T.F. Application of fuzzy multi-objective linear programming to aggregate production planning. Computer and Industrial Engineering 46 (2004) 17-41
    • (2004) Computer and Industrial Engineering , vol.46 , pp. 17-41
    • Wang, R.C.1    Liang, T.F.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.