Volumn 47, Issue 2, 2011, Pages 138-150

Stochastic optimization for strategic mine planning: A decade of developments

Author keywords

Geological uncertainty; Mine planning; Production scheduling; Simulated annealing; Stochastic optimization

Indexed keywords

OPTIMIZATION; ORE DEPOSITS; PRODUCTION CONTROL; SCHEDULING; SIMULATED ANNEALING; STOCHASTIC MODELS; UNCERTAINTY ANALYSIS;

EID: 80855124350     PISSN: 10627391     EISSN: None     Source Type: Journal    
DOI: 10.1134/S1062739147020018     Document Type: Article
Times cited : (127)

References (25)
  • 1
    • 0005695679 scopus 로고    scopus 로고
    • A decade of open pit mine planning and optimisation-The craft of turning algorithms into packages
    • Colorado School of Mines, Golden
    • J. Whittle, "A decade of open pit mine planning and optimisation-the craft of turning algorithms into packages," in: APCOM'99 Computer Applications in the Minerals Industries 28th International Symposium, Colorado School of Mines, Golden (1999).
    • (1999) APCOM'99 Computer Applications in the Minerals Industries 28th International Symposium
    • Whittle, J.1
  • 4
    • 0002131110 scopus 로고
    • Modelling uncertainty: Some conceptual thoughts
    • R. Dimitrakopoulos (Ed.), Kluwer Academic Publishers, Dordrecht
    • A. G. Journel, "Modelling uncertainty: some conceptual thoughts," in:Geostatistics for the Next Century , R. Dimitrakopoulos (Ed.), Kluwer Academic Publishers, Dordrecht (1994).
    • (1994) Geostatistics for the Next Century
    • Journel, A.G.1
  • 5
    • 58049168741 scopus 로고    scopus 로고
    • Incorporating grade uncertainty in the decision to expand the main pit at the Navachab gold mine, Namibia, through the use of stochastic simulation
    • M. Kent, R. Peattie, and V. Chamberlain, "Incorporating grade uncertainty in the decision to expand the main pit at the Navachab gold mine, Namibia, through the use of stochastic simulation", The Australasian Institute of Mining and Metallurgy, Spectrum Series, 14 (2007).
    • (2007) The Australasian Institute of Mining and Metallurgy, Spectrum Series , vol.14
    • Kent, M.1    Peattie, R.2    Chamberlain, V.3
  • 6
    • 80855164935 scopus 로고    scopus 로고
    • A risk analysis based framework for strategic mine planning and design-Method and application
    • M. C. Godoy and R. Dimitrakopoulos, "A risk analysis based framework for strategic mine planning and design-Method and application," Journal of Mining Science, No. 2 (2011).
    • (2011) Journal of Mining Science , Issue.2
    • Godoy, M.C.1    Dimitrakopoulos, R.2
  • 7
    • 33750463822 scopus 로고    scopus 로고
    • Managing risk and waste mining in long-term production scheduling
    • M. C. Godoy and R. Dimitrakopoulos, "Managing risk and waste mining in long-term production scheduling," SME Transactions, 316 (2004).
    • (2004) SME Transactions , vol.316
    • Godoy, M.C.1    Dimitrakopoulos, R.2
  • 8
    • 77952886476 scopus 로고    scopus 로고
    • High-order stochastic simulations for complex non-Gaussian and non-linear geological patterns
    • H. Mustapha and R. Dimitrakopoulos, "High-order stochastic simulations for complex non-Gaussian and non-linear geological patterns," Mathematical Geosciences, 42, No. 5 (2010).
    • (2010) Mathematical Geosciences , vol.42 , Issue.5
    • Mustapha, H.1    Dimitrakopoulos, R.2
  • 9
    • 80855127853 scopus 로고    scopus 로고
    • Accounting for joint ore supply, metal price and exchange rate uncertainties in mine design
    • S. A. Abdel Sabour and R. Dimitrakopoulos, "Accounting for joint ore supply, metal price and exchange rate uncertainties in mine design," Journal of Mining Science, No. 2 (2011).
    • (2011) Journal of Mining Science , Issue.2
    • Dimitrakopoulos, R.1
  • 11
    • 77952884234 scopus 로고    scopus 로고
    • High-order statistics of spatial random fields: Exploring spatial cumulants for modelling complex, non-Gaussian and non-linear phenomena
    • R. Dimitrakopoulos, H. Mustapha, and E. Gloaguen, "High-order statistics of spatial random fields: Exploring spatial cumulants for modelling complex, non-Gaussian and non-linear phenomena," Mathematical Geosciences, 42, No. 1 (2010).
    • (2010) Mathematical Geosciences , vol.42 , Issue.1
    • Dimitrakopoulos, R.1    Mustapha, H.2    Gloaguen, E.3
  • 14
    • 5144235519 scopus 로고    scopus 로고
    • Generalized sequential Gaussian simulation on group size í and screeneffect approximations for large field simulations
    • R. Dimitrakopoulos and X. Luo, "Generalized sequential Gaussian simulation on group size í and screeneffect approximations for large field simulations," Mathematical Geology, 36 (2004).
    • (2004) Mathematical Geology , vol.36
    • Dimitrakopoulos, R.1    Luo, X.2
  • 15
    • 77957892836 scopus 로고    scopus 로고
    • Generalized Laguerre expansions of multivariate probability densities with moments
    • H. Mustapha and R. Dimitrakopoulos "Generalized Laguerre expansions of multivariate probability densities with moments," Computers & Mathematics with Applications, 60, No. 7 (2010).
    • (2010) Computers & Mathematics with Applications , vol.60 , Issue.7
    • Mustapha, H.1    Dimitrakopoulos, R.2
  • 17
    • 74549157188 scopus 로고    scopus 로고
    • Stochastic mine design optimization based on simulated annealing: Pit limits, production schedules, multiple orebody scenarios and sensitivity analysis
    • F. Albor Consquega and R. Dimitrakopoulos, "Stochastic mine design optimization based on simulated annealing: Pit limits, production schedules, multiple orebody scenarios and sensitivity analysis," Transactions of the Institution of Mining and Metallurgy: Mining Technology, 118, No. 2 (2009).
    • (2009) Transactions of the Institution of Mining and Metallurgy: Mining Technology , vol.118 , Issue.2
    • Albor Consquega, F.1    Dimitrakopoulos, R.2
  • 19
    • 85038511206 scopus 로고    scopus 로고
    • Production scheduling with uncertain supply-A new solution to the open pit mining
    • McGill University, Montreal
    • S. Ramazan and R. Dimitrakopoulos, "Production scheduling with uncertain supply-A new solution to the open pit mining," COSMO Research Report, No. 2, McGill University, Montreal (2008).
    • (2008) COSMO Research Report , Issue.2
    • Ramazan, S.1    Dimitrakopoulos, R.2
  • 21
    • 80855141316 scopus 로고    scopus 로고
    • Production scheduling under metal uncertainty-Application of stochastic mathematical programming at an open pit copper mine and comparison to conventional scheduling
    • A. Leite and R. Dimitrakopoulos, "Production scheduling under metal uncertainty-Application of stochastic mathematical programming at an open pit copper mine and comparison to conventional scheduling," The Australasian Institute of Mining and Metallurgy, Spectrum Series, 17 (2010).
    • (2010) The Australasian Institute of Mining and Metallurgy, Spectrum Series , vol.17
    • Leite, A.1    Dimitrakopoulos, R.2
  • 24
    • 67649229013 scopus 로고    scopus 로고
    • Stochastic integer programming for optimizing long term production schedules of open pit mines: Methods, application and value of stochastic solutions
    • R. Dimitrakopoulos and S. Ramazan, "Stochastic integer programming for optimizing long term production schedules of open pit mines: methods, application and value of stochastic solutions," Transactions of the Institution of Mining and Metallurgy, Section A: Mining Technology, 117, No. 4 (2008).
    • (2008) Transactions of the Institution of Mining and Metallurgy, Section A: Mining Technology , vol.117 , Issue.4
    • Dimitrakopoulos, R.1    Ramazan, S.2
  • 25
    • 35548992349 scopus 로고    scopus 로고
    • Uncertainty based production scheduling in open pit mining
    • R. Dimitrakopoulos and S. Ramazan, "Uncertainty based production scheduling in open pit mining," SME Transactions, 316 (2004).
    • (2004) SME Transactions , vol.316
    • Dimitrakopoulos, R.1    Ramazan, S.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.