메뉴 건너뛰기




Volumn 117, Issue 4, 2008, Pages 155-160

Stochastic integer programming for optimising long term production schedules of open pit mines: Methods, application and value of stochastic solutions

Author keywords

Open pit mining; Production scheduling; Stochastic integer programming

Indexed keywords

COPPER DEPOSITS; GEOLOGY; GOLD DEPOSITS; INTEGER PROGRAMMING; ORE DEPOSITS; PRODUCTION CONTROL; SCHEDULING; STOCHASTIC MODELS; STOCHASTIC SYSTEMS;

EID: 67649229013     PISSN: 14749009     EISSN: None     Source Type: Journal    
DOI: 10.1179/174328609X417279     Document Type: Article
Times cited : (73)

References (26)
  • 1
    • 85041013987 scopus 로고    scopus 로고
    • S. Ramazan and R. Dimitrakopoulos: 'Probabilistic practical optimization of production scheduling for multi-element deposits', CIM Mag. sCIM website, April 2006, 12 p.
    • S. Ramazan and R. Dimitrakopoulos: 'Probabilistic practical optimization of production scheduling for multi-element deposits', CIM Mag. sCIM website, April 2006, 12 p.
  • 7
    • 85041015257 scopus 로고    scopus 로고
    • Advanced underground mine scheduling using mixed integer programming, PhD thesis, Colorado School of Mines, Golden, CO, USA
    • E. Topal: 'Advanced underground mine scheduling using mixed integer programming', PhD thesis, Colorado School of Mines, Golden, CO, USA, 2003.
    • (2003)
    • Topal, E.1
  • 16
    • 85041013714 scopus 로고    scopus 로고
    • D. P. Heyman and M. J. Sobel: 'Stochastic models in operations research', II, 'Stochastic optimization'; 1984, New York, McGraw-Hill.
    • D. P. Heyman and M. J. Sobel: 'Stochastic models in operations research', Vol. II, 'Stochastic optimization'; 1984, New York, McGraw-Hill.
  • 19
    • 85040961229 scopus 로고    scopus 로고
    • Orebody modelling and strategic mine planning: Uncertainty and risk management models
    • 2nd edn, Carlton South, Vic, Australasian Institute of Mining and Metallurgy
    • S. Ramazan and R. Dimitrakopoulos: in 'Orebody modelling and strategic mine planning: uncertainty and risk management models', Spectrum series no. 14, 2nd edn, 385-392; 2007, Carlton South, Vic, Australasian Institute of Mining and Metallurgy.
    • (2007) Spectrum series , vol.14 , pp. 385-392
    • Ramazan, S.1    Dimitrakopoulos, R.2
  • 22
    • 67649179867 scopus 로고    scopus 로고
    • Stochastic optimization for the introduction of new energy technology
    • F. V. Louveaux and Y. Smeers: 'Stochastic optimization for the introduction of new energy technology', Stochastics, 1997.
    • (1997) Stochastics
    • Louveaux, F.V.1    Smeers, Y.2
  • 25
    • 85040992291 scopus 로고    scopus 로고
    • Stochastic long-term production scheduling of iron ore deposits: Integrating joint multi-element geological uncertainty
    • no. 2, McGill University, Montreal, Que, Canada
    • J. Benndorf and R. Dimitrakopoulos: 'Stochastic long-term production scheduling of iron ore deposits: integrating joint multi-element geological uncertainty', COSMO Laboratory Research report no. 2, McGill University, Montreal, Que., Canada, 2008.
    • (2008) COSMO Laboratory Research report
    • Benndorf, J.1    Dimitrakopoulos, R.2
  • 26
    • 67649187704 scopus 로고    scopus 로고
    • Orebody modelling and strategic mine planning: Uncertainty and risk management models
    • 2nd edn, Carlton South, Vic, Australasian Institute of Mining and Metallurgy
    • M. Menabde, G. Froyland, P. Stone and G. Yeates: in 'Orebody modelling and strategic mine planning: uncertainty and risk management models', Spectrum series no. 14, 2nd edn, 379-384; 2007, Carlton South, Vic., Australasian Institute of Mining and Metallurgy.
    • (2007) Spectrum series , vol.14 , pp. 379-384
    • Menabde, M.1    Froyland, G.2    Stone, P.3    Yeates, G.4


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.