Dedicated constraint propagation for Job-Shop problem with generic time-lags

Author keywords

[No Author keywords available]

Indexed keywords

CONSTRAINT PROPAGATION; EARLY DETECTION; FEASIBLE SOLUTION; JOB SHOP SCHEDULING PROBLEMS; JOB-SHOP; JOB-SHOP SCHEDULING; PROPAGATION RULE; STATE OF THE ART; TIME LAG;

EID: 80655146409     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: 10.1109/ETFA.2011.6059042     Document Type: Conference Paper
Times cited : (15)

References (15)
  • 1
    • 79151481577 scopus 로고    scopus 로고
    • Generalized disjunctive constraint propagation for solving the job shop problem with time lags
    • C. Artigues, M. Huguet, and P. Lopez. Generalized disjunctive constraint propagation for solving the job shop problem with time lags. Engineering Applications of Artificial Intelligence, 24:220-231, 2011.
    • (2011) Engineering Applications of Artificial Intelligence , vol.24 , pp. 220-231
    • Artigues, C.1    Huguet, M.2    Lopez, P.3
  • 2
    • 34249754216 scopus 로고
    • A generalized permutation approach to jobshop scheduling with genetic algorithms
    • C. Bierwirth. A generalized permutation approach to jobshop scheduling with genetic algorithms. OR Spektrum, 17:87-92, 1995.
    • (1995) OR Spektrum , vol.17 , pp. 87-92
    • Bierwirth, C.1
  • 3
    • 0033906893 scopus 로고    scopus 로고
    • Hybrid flow shop scheduling with precedence constraints and time lags to minimize maximum lateness
    • DOI 10.1016/S0925-5273(99)00048-1
    • V. Botta-Genoulaz. Hybrid flow shop scheduling with precedence constraints and time lags to minimize maximum lateness. International Journal of Production Economics, 64:101-111, 2000. (Pubitemid 30557647)
    • (2000) International Journal of Production Economics , vol.64 , Issue.1 , pp. 101-111
    • Botta-Genoulaz, V.1
  • 4
    • 85017021690 scopus 로고    scopus 로고
    • Heuristic procedures for resource-constrained project scheduling with minima1 and maxima1 time lags: The minimum project-duration and resource-leveling problems
    • K. Brinkmann and K. Neumann. Heuristic procedures for resource-constrained project scheduling with minima1 and maxima1 time lags: the minimum project-duration and resource-leveling problems. Journal of Decision Systems, 5:129-156, 1996.
    • (1996) Journal of Decision Systems , vol.5 , pp. 129-156
    • Brinkmann, K.1    Neumann, K.2
  • 5
    • 84867925682 scopus 로고    scopus 로고
    • Scheduling and constraint propagation
    • P. Brucker. Scheduling and constraint propagation. Discrete Applied Mathematics, 123:227-256, 2002.
    • (2002) Discrete Applied Mathematics , vol.123 , pp. 227-256
    • Brucker, P.1
  • 6
    • 0042709810 scopus 로고    scopus 로고
    • A branch and bound algorithm for a single-machine scheduling problem with positive and negative time-lags
    • PII S0166218X99000153
    • P. Brucker, T. Hilbig, and J. Hurink. A branch and bound algorithm for a single machine scheduling with positive and negative time-lags. Discrete Applied Mathematics, 94:77-99, 1999. (Pubitemid 129550213)
    • (1999) Discrete Applied Mathematics , vol.94 , Issue.1-3 , pp. 77-99
    • Brucker, P.1    Hilbig, T.2    Hurink, J.3
  • 7
    • 36348936649 scopus 로고    scopus 로고
    • A memetic algorithm for the job-shop with time-lags
    • DOI 10.1016/j.cor.2006.11.007, PII S0305054806002930, Selected Papers Presented at the ECCO'04 European Conference on Combinatorial Optimization
    • A. Caumond, P. Lacomme, and N. Tchernev. A memetic algorithm for the job-shop with time-lags. Computers & Operations Research, 35:2331-2356, 2008. (Pubitemid 350161141)
    • (2008) Computers and Operations Research , vol.35 , Issue.7 , pp. 2331-2356
    • Caumond, A.1    Lacomme, P.2    Tchernev, N.3
  • 8
    • 79955596531 scopus 로고    scopus 로고
    • Multi-mode resourceconstrained project scheduling using rcpsp and sat solvers
    • J. Coelho and M. Vanhoucke. Multi-mode resourceconstrained project scheduling using rcpsp and sat solvers. European Journal of Operational Research, 213(7):73-83, 2011.
    • (2011) European Journal of Operational Research , vol.213 , Issue.7 , pp. 73-83
    • Coelho, J.1    Vanhoucke, M.2
  • 10
    • 14644400388 scopus 로고    scopus 로고
    • Constraint-propagation-based cutting planes: An application to the resource-constrained project scheduling problem
    • DOI 10.1287/ijoc.1030.0043
    • S. Demassey, C. Artigues, and P. Michelon. Constraint propagation based cutting planes: an application to the resource-constrained project scheduling problem. INFORMS Journal on Computing, 17:52-65, 2005. (Pubitemid 40308569)
    • (2005) INFORMS Journal on Computing , vol.17 , Issue.1 , pp. 52-65
    • Demassey, S.1    Artigues, C.2    Michelon, P.3
  • 12
    • 77953872383 scopus 로고    scopus 로고
    • A survey of variants and extensions of the resource-constrained project scheduling problem
    • S. Hartmann and D. Briskorn. A survey of variants and extensions of the resource-constrained project scheduling problem. European Journal of Operational Research, 207:1-14, 2010.
    • (2010) European Journal of Operational Research , vol.207 , pp. 1-14
    • Hartmann, S.1    Briskorn, D.2
  • 13
    • 0035885332 scopus 로고    scopus 로고
    • Local search algorithms for a single-machine scheduling problem with positive and negative time-lags
    • DOI 10.1016/S0166-218X(00)00315-2, PII S0166218X00003152
    • J. Hurink and J. Keuchel. Local search algorithms for a single-machine scheduling problem with positive and negative time-lags. Discrete Applied Mathematics, 112:179-197, 2001. (Pubitemid 33676140)
    • (2001) Discrete Applied Mathematics , vol.112 , Issue.1-3 , pp. 179-197
    • Hurink, J.1    Keuchel, J.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.